Hanging installation method for air pipe of steel grid structure

The invention relates to a steel grid structure air pipe hanging installation method, which belongs to the technical field of air pipe installation, and comprises the following steps: S1, prefabricating a support hanger: measuring the pre-installation position of the support hanger, and determining...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: LI ZHAOJUN, CHEN BOWEI, REN YUYANG, TANG KAILEI, CAO FANGYING, ZHANG XUEFENG, ZHANG YAOQIN, CAO WEI, XU PEIYUAN, TIAN YUNSHENG
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator LI ZHAOJUN
CHEN BOWEI
REN YUYANG
TANG KAILEI
CAO FANGYING
ZHANG XUEFENG
ZHANG YAOQIN
CAO WEI
XU PEIYUAN
TIAN YUNSHENG
description The invention relates to a steel grid structure air pipe hanging installation method, which belongs to the technical field of air pipe installation, and comprises the following steps: S1, prefabricating a support hanger: measuring the pre-installation position of the support hanger, and determining the size of the support hanger according to the size of an on-site air pipe in a grid to be completed before prefabrication; s2, a support hanger is installed on the steel net frame through a cable-stayed part and a P-type pipe bundle; S3, an air pipe is installed on the support hanger; the cable-stayed parts and the P-shaped pipe bundles are used for connecting the support hanger and the steel net rack, the problems that the distance between rod pieces of the steel net rack is too large, and rooting cannot be achieved are solved, the support hanger can be installed on a horizontal rod piece and is also suitable for an inclined rod piece, and compared with the mode that the support hanger and the steel net rack are
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN115628536A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN115628536A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN115628536A3</originalsourceid><addsrcrecordid>eNrjZHDwSMxLz8xLV8jMKy5JzMlJLMnMz1PITS3JyE9RSMsvUkjMLFIoyCxIVchPUyguSU3NUUgvykwBMotKk0tKi1J5GFjTEnOKU3mhNDeDoptriLOHbmpBfnxqcUFicmpeakm8s5-hoamZkYWpsZmjMTFqAM2BMVo</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Hanging installation method for air pipe of steel grid structure</title><source>esp@cenet</source><creator>LI ZHAOJUN ; CHEN BOWEI ; REN YUYANG ; TANG KAILEI ; CAO FANGYING ; ZHANG XUEFENG ; ZHANG YAOQIN ; CAO WEI ; XU PEIYUAN ; TIAN YUNSHENG</creator><creatorcontrib>LI ZHAOJUN ; CHEN BOWEI ; REN YUYANG ; TANG KAILEI ; CAO FANGYING ; ZHANG XUEFENG ; ZHANG YAOQIN ; CAO WEI ; XU PEIYUAN ; TIAN YUNSHENG</creatorcontrib><description>The invention relates to a steel grid structure air pipe hanging installation method, which belongs to the technical field of air pipe installation, and comprises the following steps: S1, prefabricating a support hanger: measuring the pre-installation position of the support hanger, and determining the size of the support hanger according to the size of an on-site air pipe in a grid to be completed before prefabrication; s2, a support hanger is installed on the steel net frame through a cable-stayed part and a P-type pipe bundle; S3, an air pipe is installed on the support hanger; the cable-stayed parts and the P-shaped pipe bundles are used for connecting the support hanger and the steel net rack, the problems that the distance between rod pieces of the steel net rack is too large, and rooting cannot be achieved are solved, the support hanger can be installed on a horizontal rod piece and is also suitable for an inclined rod piece, and compared with the mode that the support hanger and the steel net rack are</description><language>chi ; eng</language><subject>AIR-CONDITIONING, AIR-HUMIDIFICATION, VENTILATION, USE OF AIRCURRENTS FOR SCREENING ; BLASTING ; ENGINEERING ELEMENTS AND UNITS ; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVEFUNCTIONING OF MACHINES OR INSTALLATIONS ; HEATING ; JOINTS OR FITTINGS FOR PIPES ; LIGHTING ; MEANS FOR THERMAL INSULATION IN GENERAL ; MECHANICAL ENGINEERING ; PIPES ; RANGES ; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING ; THERMAL INSULATION IN GENERAL ; VENTILATING ; WEAPONS</subject><creationdate>2023</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20230120&amp;DB=EPODOC&amp;CC=CN&amp;NR=115628536A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76290</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20230120&amp;DB=EPODOC&amp;CC=CN&amp;NR=115628536A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>LI ZHAOJUN</creatorcontrib><creatorcontrib>CHEN BOWEI</creatorcontrib><creatorcontrib>REN YUYANG</creatorcontrib><creatorcontrib>TANG KAILEI</creatorcontrib><creatorcontrib>CAO FANGYING</creatorcontrib><creatorcontrib>ZHANG XUEFENG</creatorcontrib><creatorcontrib>ZHANG YAOQIN</creatorcontrib><creatorcontrib>CAO WEI</creatorcontrib><creatorcontrib>XU PEIYUAN</creatorcontrib><creatorcontrib>TIAN YUNSHENG</creatorcontrib><title>Hanging installation method for air pipe of steel grid structure</title><description>The invention relates to a steel grid structure air pipe hanging installation method, which belongs to the technical field of air pipe installation, and comprises the following steps: S1, prefabricating a support hanger: measuring the pre-installation position of the support hanger, and determining the size of the support hanger according to the size of an on-site air pipe in a grid to be completed before prefabrication; s2, a support hanger is installed on the steel net frame through a cable-stayed part and a P-type pipe bundle; S3, an air pipe is installed on the support hanger; the cable-stayed parts and the P-shaped pipe bundles are used for connecting the support hanger and the steel net rack, the problems that the distance between rod pieces of the steel net rack is too large, and rooting cannot be achieved are solved, the support hanger can be installed on a horizontal rod piece and is also suitable for an inclined rod piece, and compared with the mode that the support hanger and the steel net rack are</description><subject>AIR-CONDITIONING, AIR-HUMIDIFICATION, VENTILATION, USE OF AIRCURRENTS FOR SCREENING</subject><subject>BLASTING</subject><subject>ENGINEERING ELEMENTS AND UNITS</subject><subject>GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVEFUNCTIONING OF MACHINES OR INSTALLATIONS</subject><subject>HEATING</subject><subject>JOINTS OR FITTINGS FOR PIPES</subject><subject>LIGHTING</subject><subject>MEANS FOR THERMAL INSULATION IN GENERAL</subject><subject>MECHANICAL ENGINEERING</subject><subject>PIPES</subject><subject>RANGES</subject><subject>SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING</subject><subject>THERMAL INSULATION IN GENERAL</subject><subject>VENTILATING</subject><subject>WEAPONS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2023</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZHDwSMxLz8xLV8jMKy5JzMlJLMnMz1PITS3JyE9RSMsvUkjMLFIoyCxIVchPUyguSU3NUUgvykwBMotKk0tKi1J5GFjTEnOKU3mhNDeDoptriLOHbmpBfnxqcUFicmpeakm8s5-hoamZkYWpsZmjMTFqAM2BMVo</recordid><startdate>20230120</startdate><enddate>20230120</enddate><creator>LI ZHAOJUN</creator><creator>CHEN BOWEI</creator><creator>REN YUYANG</creator><creator>TANG KAILEI</creator><creator>CAO FANGYING</creator><creator>ZHANG XUEFENG</creator><creator>ZHANG YAOQIN</creator><creator>CAO WEI</creator><creator>XU PEIYUAN</creator><creator>TIAN YUNSHENG</creator><scope>EVB</scope></search><sort><creationdate>20230120</creationdate><title>Hanging installation method for air pipe of steel grid structure</title><author>LI ZHAOJUN ; CHEN BOWEI ; REN YUYANG ; TANG KAILEI ; CAO FANGYING ; ZHANG XUEFENG ; ZHANG YAOQIN ; CAO WEI ; XU PEIYUAN ; TIAN YUNSHENG</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN115628536A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2023</creationdate><topic>AIR-CONDITIONING, AIR-HUMIDIFICATION, VENTILATION, USE OF AIRCURRENTS FOR SCREENING</topic><topic>BLASTING</topic><topic>ENGINEERING ELEMENTS AND UNITS</topic><topic>GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVEFUNCTIONING OF MACHINES OR INSTALLATIONS</topic><topic>HEATING</topic><topic>JOINTS OR FITTINGS FOR PIPES</topic><topic>LIGHTING</topic><topic>MEANS FOR THERMAL INSULATION IN GENERAL</topic><topic>MECHANICAL ENGINEERING</topic><topic>PIPES</topic><topic>RANGES</topic><topic>SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING</topic><topic>THERMAL INSULATION IN GENERAL</topic><topic>VENTILATING</topic><topic>WEAPONS</topic><toplevel>online_resources</toplevel><creatorcontrib>LI ZHAOJUN</creatorcontrib><creatorcontrib>CHEN BOWEI</creatorcontrib><creatorcontrib>REN YUYANG</creatorcontrib><creatorcontrib>TANG KAILEI</creatorcontrib><creatorcontrib>CAO FANGYING</creatorcontrib><creatorcontrib>ZHANG XUEFENG</creatorcontrib><creatorcontrib>ZHANG YAOQIN</creatorcontrib><creatorcontrib>CAO WEI</creatorcontrib><creatorcontrib>XU PEIYUAN</creatorcontrib><creatorcontrib>TIAN YUNSHENG</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>LI ZHAOJUN</au><au>CHEN BOWEI</au><au>REN YUYANG</au><au>TANG KAILEI</au><au>CAO FANGYING</au><au>ZHANG XUEFENG</au><au>ZHANG YAOQIN</au><au>CAO WEI</au><au>XU PEIYUAN</au><au>TIAN YUNSHENG</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Hanging installation method for air pipe of steel grid structure</title><date>2023-01-20</date><risdate>2023</risdate><abstract>The invention relates to a steel grid structure air pipe hanging installation method, which belongs to the technical field of air pipe installation, and comprises the following steps: S1, prefabricating a support hanger: measuring the pre-installation position of the support hanger, and determining the size of the support hanger according to the size of an on-site air pipe in a grid to be completed before prefabrication; s2, a support hanger is installed on the steel net frame through a cable-stayed part and a P-type pipe bundle; S3, an air pipe is installed on the support hanger; the cable-stayed parts and the P-shaped pipe bundles are used for connecting the support hanger and the steel net rack, the problems that the distance between rod pieces of the steel net rack is too large, and rooting cannot be achieved are solved, the support hanger can be installed on a horizontal rod piece and is also suitable for an inclined rod piece, and compared with the mode that the support hanger and the steel net rack are</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN115628536A
source esp@cenet
subjects AIR-CONDITIONING, AIR-HUMIDIFICATION, VENTILATION, USE OF AIRCURRENTS FOR SCREENING
BLASTING
ENGINEERING ELEMENTS AND UNITS
GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVEFUNCTIONING OF MACHINES OR INSTALLATIONS
HEATING
JOINTS OR FITTINGS FOR PIPES
LIGHTING
MEANS FOR THERMAL INSULATION IN GENERAL
MECHANICAL ENGINEERING
PIPES
RANGES
SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING
THERMAL INSULATION IN GENERAL
VENTILATING
WEAPONS
title Hanging installation method for air pipe of steel grid structure
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-03T18%3A48%3A06IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=LI%20ZHAOJUN&rft.date=2023-01-20&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN115628536A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true