Method and system for monitoring internal force of leg diagonal member of power transmission tower
The invention provides a method and system for monitoring the internal force of a leg diagonal member of a power transmission tower, and belongs to the technical field of overhead power transmission lines, and the method comprises the steps: taking the grounding positions of a long leg and a short l...
Gespeichert in:
Hauptverfasser: | , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | ZHANG LIJUAN LEI QIANG FU JIANMING CHO KWANG-TAE XU ZAIGEN LANG XUJUN |
description | The invention provides a method and system for monitoring the internal force of a leg diagonal member of a power transmission tower, and belongs to the technical field of overhead power transmission lines, and the method comprises the steps: taking the grounding positions of a long leg and a short leg of the power transmission tower with the ground as the moment center, and obtaining the force arms of a long leg diagonal member and a short leg diagonal member; acquiring a first wind load at an intersection point position of the main material of the iron tower and a tower body diagonal member and a second wind load at an intersection point position of the main material of the iron tower and a leg diagonal member; based on the first wind load and the second wind load, horizontal force acting on the tower leg partition surface is obtained; based on a force balance principle, diagonal member internal force of a long leg and a short leg of the power transmission tower is obtained, and monitoring of the diagonal me |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN115585921A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN115585921A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN115585921A3</originalsourceid><addsrcrecordid>eNqNyjEKwkAQheE0FqLeYTyAxSoBLSUoNlrZh00ySQZ2Z5adAfH2uuABrN7Px1tW3R1tlgE8D6BvNYwwSoYoTCaZeAJiw8w-FO8RZISAEwzkJykaMXaYCyd5fcOyZ42kSsJghdbVYvRBcfPbVbW9Xp7NbYdJWtTke2S0tnk4V9fH-rR358M_nw9r2T5m</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Method and system for monitoring internal force of leg diagonal member of power transmission tower</title><source>esp@cenet</source><creator>ZHANG LIJUAN ; LEI QIANG ; FU JIANMING ; CHO KWANG-TAE ; XU ZAIGEN ; LANG XUJUN</creator><creatorcontrib>ZHANG LIJUAN ; LEI QIANG ; FU JIANMING ; CHO KWANG-TAE ; XU ZAIGEN ; LANG XUJUN</creatorcontrib><description>The invention provides a method and system for monitoring the internal force of a leg diagonal member of a power transmission tower, and belongs to the technical field of overhead power transmission lines, and the method comprises the steps: taking the grounding positions of a long leg and a short leg of the power transmission tower with the ground as the moment center, and obtaining the force arms of a long leg diagonal member and a short leg diagonal member; acquiring a first wind load at an intersection point position of the main material of the iron tower and a tower body diagonal member and a second wind load at an intersection point position of the main material of the iron tower and a leg diagonal member; based on the first wind load and the second wind load, horizontal force acting on the tower leg partition surface is obtained; based on a force balance principle, diagonal member internal force of a long leg and a short leg of the power transmission tower is obtained, and monitoring of the diagonal me</description><language>chi ; eng</language><subject>MEASURING ; MEASURING FORCE, STRESS, TORQUE, WORK, MECHANICAL POWER,MECHANICAL EFFICIENCY, OR FLUID PRESSURE ; PHYSICS ; TESTING</subject><creationdate>2023</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20230110&DB=EPODOC&CC=CN&NR=115585921A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76290</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20230110&DB=EPODOC&CC=CN&NR=115585921A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>ZHANG LIJUAN</creatorcontrib><creatorcontrib>LEI QIANG</creatorcontrib><creatorcontrib>FU JIANMING</creatorcontrib><creatorcontrib>CHO KWANG-TAE</creatorcontrib><creatorcontrib>XU ZAIGEN</creatorcontrib><creatorcontrib>LANG XUJUN</creatorcontrib><title>Method and system for monitoring internal force of leg diagonal member of power transmission tower</title><description>The invention provides a method and system for monitoring the internal force of a leg diagonal member of a power transmission tower, and belongs to the technical field of overhead power transmission lines, and the method comprises the steps: taking the grounding positions of a long leg and a short leg of the power transmission tower with the ground as the moment center, and obtaining the force arms of a long leg diagonal member and a short leg diagonal member; acquiring a first wind load at an intersection point position of the main material of the iron tower and a tower body diagonal member and a second wind load at an intersection point position of the main material of the iron tower and a leg diagonal member; based on the first wind load and the second wind load, horizontal force acting on the tower leg partition surface is obtained; based on a force balance principle, diagonal member internal force of a long leg and a short leg of the power transmission tower is obtained, and monitoring of the diagonal me</description><subject>MEASURING</subject><subject>MEASURING FORCE, STRESS, TORQUE, WORK, MECHANICAL POWER,MECHANICAL EFFICIENCY, OR FLUID PRESSURE</subject><subject>PHYSICS</subject><subject>TESTING</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2023</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNyjEKwkAQheE0FqLeYTyAxSoBLSUoNlrZh00ySQZ2Z5adAfH2uuABrN7Px1tW3R1tlgE8D6BvNYwwSoYoTCaZeAJiw8w-FO8RZISAEwzkJykaMXaYCyd5fcOyZ42kSsJghdbVYvRBcfPbVbW9Xp7NbYdJWtTke2S0tnk4V9fH-rR358M_nw9r2T5m</recordid><startdate>20230110</startdate><enddate>20230110</enddate><creator>ZHANG LIJUAN</creator><creator>LEI QIANG</creator><creator>FU JIANMING</creator><creator>CHO KWANG-TAE</creator><creator>XU ZAIGEN</creator><creator>LANG XUJUN</creator><scope>EVB</scope></search><sort><creationdate>20230110</creationdate><title>Method and system for monitoring internal force of leg diagonal member of power transmission tower</title><author>ZHANG LIJUAN ; LEI QIANG ; FU JIANMING ; CHO KWANG-TAE ; XU ZAIGEN ; LANG XUJUN</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN115585921A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2023</creationdate><topic>MEASURING</topic><topic>MEASURING FORCE, STRESS, TORQUE, WORK, MECHANICAL POWER,MECHANICAL EFFICIENCY, OR FLUID PRESSURE</topic><topic>PHYSICS</topic><topic>TESTING</topic><toplevel>online_resources</toplevel><creatorcontrib>ZHANG LIJUAN</creatorcontrib><creatorcontrib>LEI QIANG</creatorcontrib><creatorcontrib>FU JIANMING</creatorcontrib><creatorcontrib>CHO KWANG-TAE</creatorcontrib><creatorcontrib>XU ZAIGEN</creatorcontrib><creatorcontrib>LANG XUJUN</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>ZHANG LIJUAN</au><au>LEI QIANG</au><au>FU JIANMING</au><au>CHO KWANG-TAE</au><au>XU ZAIGEN</au><au>LANG XUJUN</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Method and system for monitoring internal force of leg diagonal member of power transmission tower</title><date>2023-01-10</date><risdate>2023</risdate><abstract>The invention provides a method and system for monitoring the internal force of a leg diagonal member of a power transmission tower, and belongs to the technical field of overhead power transmission lines, and the method comprises the steps: taking the grounding positions of a long leg and a short leg of the power transmission tower with the ground as the moment center, and obtaining the force arms of a long leg diagonal member and a short leg diagonal member; acquiring a first wind load at an intersection point position of the main material of the iron tower and a tower body diagonal member and a second wind load at an intersection point position of the main material of the iron tower and a leg diagonal member; based on the first wind load and the second wind load, horizontal force acting on the tower leg partition surface is obtained; based on a force balance principle, diagonal member internal force of a long leg and a short leg of the power transmission tower is obtained, and monitoring of the diagonal me</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN115585921A |
source | esp@cenet |
subjects | MEASURING MEASURING FORCE, STRESS, TORQUE, WORK, MECHANICAL POWER,MECHANICAL EFFICIENCY, OR FLUID PRESSURE PHYSICS TESTING |
title | Method and system for monitoring internal force of leg diagonal member of power transmission tower |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-02T00%3A44%3A40IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=ZHANG%20LIJUAN&rft.date=2023-01-10&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN115585921A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |