Cantilever structure construction suspension pulling method early-dismantling formwork system and construction method

The invention relates to the technical field of constructional engineering, in particular to a cantilever structure construction suspension pulling method early-dismantling formwork system and a construction method.The early-dismantling formwork system comprises latticed column embedded parts which...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: ZHAO TONG, SONG JIARUN, YAN KAI, ZHANG SONGFU, ZHANG WENXUE, LV LIANG, SONG BAOCANG, SHI YARUI, MAO MINGCHAO, WANG YUNLEI, PEI YANJUN, ZHANG HAOSU
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator ZHAO TONG
SONG JIARUN
YAN KAI
ZHANG SONGFU
ZHANG WENXUE
LV LIANG
SONG BAOCANG
SHI YARUI
MAO MINGCHAO
WANG YUNLEI
PEI YANJUN
ZHANG HAOSU
description The invention relates to the technical field of constructional engineering, in particular to a cantilever structure construction suspension pulling method early-dismantling formwork system and a construction method.The early-dismantling formwork system comprises latticed column embedded parts which are arranged in top concrete of a cross beam and a cantilever side by side at intervals and located on the central axis of a platform beam; the cantilever embedded parts are arranged in the top concrete of the cross beams and the cantilevers and on the two sides of each latticed column embedded part; the bottoms of the latticed columns are connected with the latticed column embedded parts, the two sides of the latticed columns are connected with the steel inhaul cable embedded parts through steel inhaul cables, and every two adjacent latticed columns are connected through a connecting piece and used for dispersing and transmitting the overhanging weight to the cross beams and the stand columns. By means of the latt
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN115522731A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN115522731A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN115522731A3</originalsourceid><addsrcrecordid>eNqNjL0OwjAQg7swIOAdjgfokFYVM4qKmJjYqyi5QkRyiXIJqG_PT1nYmGzL9resilSUrcM7JuCcis4lIehAc7CBgAtHJH7bWJyzdAGP-RoMoEpuqo1l_4J8ijEk_wjpBjxxRg-KzC9sfq6rxagc4-arq2p76M_yWGMMA3JUGgnzIE9CdF3T7Fqxb__ZPAFA9UeN</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Cantilever structure construction suspension pulling method early-dismantling formwork system and construction method</title><source>esp@cenet</source><creator>ZHAO TONG ; SONG JIARUN ; YAN KAI ; ZHANG SONGFU ; ZHANG WENXUE ; LV LIANG ; SONG BAOCANG ; SHI YARUI ; MAO MINGCHAO ; WANG YUNLEI ; PEI YANJUN ; ZHANG HAOSU</creator><creatorcontrib>ZHAO TONG ; SONG JIARUN ; YAN KAI ; ZHANG SONGFU ; ZHANG WENXUE ; LV LIANG ; SONG BAOCANG ; SHI YARUI ; MAO MINGCHAO ; WANG YUNLEI ; PEI YANJUN ; ZHANG HAOSU</creatorcontrib><description>The invention relates to the technical field of constructional engineering, in particular to a cantilever structure construction suspension pulling method early-dismantling formwork system and a construction method.The early-dismantling formwork system comprises latticed column embedded parts which are arranged in top concrete of a cross beam and a cantilever side by side at intervals and located on the central axis of a platform beam; the cantilever embedded parts are arranged in the top concrete of the cross beams and the cantilevers and on the two sides of each latticed column embedded part; the bottoms of the latticed columns are connected with the latticed column embedded parts, the two sides of the latticed columns are connected with the steel inhaul cable embedded parts through steel inhaul cables, and every two adjacent latticed columns are connected through a connecting piece and used for dispersing and transmitting the overhanging weight to the cross beams and the stand columns. By means of the latt</description><language>chi ; eng</language><subject>BUILDING ; BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE ; FIXED CONSTRUCTIONS ; FORMS ; HANDLING BUILDING MATERIALS ON THE SITE ; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS ; SCAFFOLDING ; SHUTTERING</subject><creationdate>2022</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20221227&amp;DB=EPODOC&amp;CC=CN&amp;NR=115522731A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,777,882,25545,76296</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20221227&amp;DB=EPODOC&amp;CC=CN&amp;NR=115522731A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>ZHAO TONG</creatorcontrib><creatorcontrib>SONG JIARUN</creatorcontrib><creatorcontrib>YAN KAI</creatorcontrib><creatorcontrib>ZHANG SONGFU</creatorcontrib><creatorcontrib>ZHANG WENXUE</creatorcontrib><creatorcontrib>LV LIANG</creatorcontrib><creatorcontrib>SONG BAOCANG</creatorcontrib><creatorcontrib>SHI YARUI</creatorcontrib><creatorcontrib>MAO MINGCHAO</creatorcontrib><creatorcontrib>WANG YUNLEI</creatorcontrib><creatorcontrib>PEI YANJUN</creatorcontrib><creatorcontrib>ZHANG HAOSU</creatorcontrib><title>Cantilever structure construction suspension pulling method early-dismantling formwork system and construction method</title><description>The invention relates to the technical field of constructional engineering, in particular to a cantilever structure construction suspension pulling method early-dismantling formwork system and a construction method.The early-dismantling formwork system comprises latticed column embedded parts which are arranged in top concrete of a cross beam and a cantilever side by side at intervals and located on the central axis of a platform beam; the cantilever embedded parts are arranged in the top concrete of the cross beams and the cantilevers and on the two sides of each latticed column embedded part; the bottoms of the latticed columns are connected with the latticed column embedded parts, the two sides of the latticed columns are connected with the steel inhaul cable embedded parts through steel inhaul cables, and every two adjacent latticed columns are connected through a connecting piece and used for dispersing and transmitting the overhanging weight to the cross beams and the stand columns. By means of the latt</description><subject>BUILDING</subject><subject>BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FORMS</subject><subject>HANDLING BUILDING MATERIALS ON THE SITE</subject><subject>REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS</subject><subject>SCAFFOLDING</subject><subject>SHUTTERING</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2022</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNjL0OwjAQg7swIOAdjgfokFYVM4qKmJjYqyi5QkRyiXIJqG_PT1nYmGzL9resilSUrcM7JuCcis4lIehAc7CBgAtHJH7bWJyzdAGP-RoMoEpuqo1l_4J8ijEk_wjpBjxxRg-KzC9sfq6rxagc4-arq2p76M_yWGMMA3JUGgnzIE9CdF3T7Fqxb__ZPAFA9UeN</recordid><startdate>20221227</startdate><enddate>20221227</enddate><creator>ZHAO TONG</creator><creator>SONG JIARUN</creator><creator>YAN KAI</creator><creator>ZHANG SONGFU</creator><creator>ZHANG WENXUE</creator><creator>LV LIANG</creator><creator>SONG BAOCANG</creator><creator>SHI YARUI</creator><creator>MAO MINGCHAO</creator><creator>WANG YUNLEI</creator><creator>PEI YANJUN</creator><creator>ZHANG HAOSU</creator><scope>EVB</scope></search><sort><creationdate>20221227</creationdate><title>Cantilever structure construction suspension pulling method early-dismantling formwork system and construction method</title><author>ZHAO TONG ; SONG JIARUN ; YAN KAI ; ZHANG SONGFU ; ZHANG WENXUE ; LV LIANG ; SONG BAOCANG ; SHI YARUI ; MAO MINGCHAO ; WANG YUNLEI ; PEI YANJUN ; ZHANG HAOSU</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN115522731A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2022</creationdate><topic>BUILDING</topic><topic>BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FORMS</topic><topic>HANDLING BUILDING MATERIALS ON THE SITE</topic><topic>REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS</topic><topic>SCAFFOLDING</topic><topic>SHUTTERING</topic><toplevel>online_resources</toplevel><creatorcontrib>ZHAO TONG</creatorcontrib><creatorcontrib>SONG JIARUN</creatorcontrib><creatorcontrib>YAN KAI</creatorcontrib><creatorcontrib>ZHANG SONGFU</creatorcontrib><creatorcontrib>ZHANG WENXUE</creatorcontrib><creatorcontrib>LV LIANG</creatorcontrib><creatorcontrib>SONG BAOCANG</creatorcontrib><creatorcontrib>SHI YARUI</creatorcontrib><creatorcontrib>MAO MINGCHAO</creatorcontrib><creatorcontrib>WANG YUNLEI</creatorcontrib><creatorcontrib>PEI YANJUN</creatorcontrib><creatorcontrib>ZHANG HAOSU</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>ZHAO TONG</au><au>SONG JIARUN</au><au>YAN KAI</au><au>ZHANG SONGFU</au><au>ZHANG WENXUE</au><au>LV LIANG</au><au>SONG BAOCANG</au><au>SHI YARUI</au><au>MAO MINGCHAO</au><au>WANG YUNLEI</au><au>PEI YANJUN</au><au>ZHANG HAOSU</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Cantilever structure construction suspension pulling method early-dismantling formwork system and construction method</title><date>2022-12-27</date><risdate>2022</risdate><abstract>The invention relates to the technical field of constructional engineering, in particular to a cantilever structure construction suspension pulling method early-dismantling formwork system and a construction method.The early-dismantling formwork system comprises latticed column embedded parts which are arranged in top concrete of a cross beam and a cantilever side by side at intervals and located on the central axis of a platform beam; the cantilever embedded parts are arranged in the top concrete of the cross beams and the cantilevers and on the two sides of each latticed column embedded part; the bottoms of the latticed columns are connected with the latticed column embedded parts, the two sides of the latticed columns are connected with the steel inhaul cable embedded parts through steel inhaul cables, and every two adjacent latticed columns are connected through a connecting piece and used for dispersing and transmitting the overhanging weight to the cross beams and the stand columns. By means of the latt</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN115522731A
source esp@cenet
subjects BUILDING
BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE
FIXED CONSTRUCTIONS
FORMS
HANDLING BUILDING MATERIALS ON THE SITE
REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS
SCAFFOLDING
SHUTTERING
title Cantilever structure construction suspension pulling method early-dismantling formwork system and construction method
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-18T08%3A40%3A15IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=ZHAO%20TONG&rft.date=2022-12-27&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN115522731A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true