Foundation bolt fixing device

The invention relates to a foundation bolt fixing device, and relates to the technical field of engineering construction. The embedded cylinders are in one-to-one correspondence with the foundation bolts and are in threaded connection with the foundation bolts, the upper ends of the embedded cylinde...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: ZHU TAO, CUI DONGLONG, BIAN FENGLI, ZHANG XIAOLONG, XUE YI, WEI JIANGUO, ZHANG CHUNBAO, LIU JUNNAN, CHEN JINLONG, LU HEPING, CHEN JUNYIN, LIU HAO, DONG JIANWEI, YANG LI, ZHANG PEIDONG, SU LICI, XI LIJUN, PAN YUNPENG, PI NAN, GUO JINGCHI, ZHANG SHUO, YANG JIE
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator ZHU TAO
CUI DONGLONG
BIAN FENGLI
ZHANG XIAOLONG
XUE YI
WEI JIANGUO
ZHANG CHUNBAO
LIU JUNNAN
CHEN JINLONG
LU HEPING
CHEN JUNYIN
LIU HAO
DONG JIANWEI
YANG LI
ZHANG PEIDONG
SU LICI
XI LIJUN
PAN YUNPENG
PI NAN
GUO JINGCHI
ZHANG SHUO
YANG JIE
description The invention relates to a foundation bolt fixing device, and relates to the technical field of engineering construction. The embedded cylinders are in one-to-one correspondence with the foundation bolts and are in threaded connection with the foundation bolts, the upper ends of the embedded cylinders are open, and the upper surfaces of the embedded cylinders are flush with the surface of a concrete foundation. According to the device, directly-buried foundation bolts are replaced with the pre-buried cylinders, then the equipment is clamped and fixed through the foundation bolts and the pre-buried cylinders, and the situation that after a concrete foundation is solidified, the foundation bolts stretch out of the ground, and consequently carrying and placing of the equipment are hindered is reduced. 本申请涉及一种地脚螺栓固定装置,涉及工程施工技术领域。其包括多个地脚螺栓,以及多个与地脚螺栓一一对应且螺纹连接的预埋筒,所述预埋筒上端开口,且预埋筒的上表面与混凝土地基的表面平齐。本申请通过将直接埋设的地脚螺栓更换成预埋筒,再用地脚螺栓和预埋筒对设备进行夹紧固定,减少了混凝土地基凝固后,地脚螺栓伸出地面对设备的搬运和放置造成阻碍的情况。
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN115506395A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN115506395A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN115506395A3</originalsourceid><addsrcrecordid>eNrjZJB1yy_NS0ksyczPU0jKzylRSMusyMxLV0hJLctMTuVhYE1LzClO5YXS3AyKbq4hzh66qQX58anFBYnJqXmpJfHOfoaGpqYGZsaWpo7GxKgBAM8mJCc</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Foundation bolt fixing device</title><source>esp@cenet</source><creator>ZHU TAO ; CUI DONGLONG ; BIAN FENGLI ; ZHANG XIAOLONG ; XUE YI ; WEI JIANGUO ; ZHANG CHUNBAO ; LIU JUNNAN ; CHEN JINLONG ; LU HEPING ; CHEN JUNYIN ; LIU HAO ; DONG JIANWEI ; YANG LI ; ZHANG PEIDONG ; SU LICI ; XI LIJUN ; PAN YUNPENG ; PI NAN ; GUO JINGCHI ; ZHANG SHUO ; YANG JIE</creator><creatorcontrib>ZHU TAO ; CUI DONGLONG ; BIAN FENGLI ; ZHANG XIAOLONG ; XUE YI ; WEI JIANGUO ; ZHANG CHUNBAO ; LIU JUNNAN ; CHEN JINLONG ; LU HEPING ; CHEN JUNYIN ; LIU HAO ; DONG JIANWEI ; YANG LI ; ZHANG PEIDONG ; SU LICI ; XI LIJUN ; PAN YUNPENG ; PI NAN ; GUO JINGCHI ; ZHANG SHUO ; YANG JIE</creatorcontrib><description>The invention relates to a foundation bolt fixing device, and relates to the technical field of engineering construction. The embedded cylinders are in one-to-one correspondence with the foundation bolts and are in threaded connection with the foundation bolts, the upper ends of the embedded cylinders are open, and the upper surfaces of the embedded cylinders are flush with the surface of a concrete foundation. According to the device, directly-buried foundation bolts are replaced with the pre-buried cylinders, then the equipment is clamped and fixed through the foundation bolts and the pre-buried cylinders, and the situation that after a concrete foundation is solidified, the foundation bolts stretch out of the ground, and consequently carrying and placing of the equipment are hindered is reduced. 本申请涉及一种地脚螺栓固定装置,涉及工程施工技术领域。其包括多个地脚螺栓,以及多个与地脚螺栓一一对应且螺纹连接的预埋筒,所述预埋筒上端开口,且预埋筒的上表面与混凝土地基的表面平齐。本申请通过将直接埋设的地脚螺栓更换成预埋筒,再用地脚螺栓和预埋筒对设备进行夹紧固定,减少了混凝土地基凝固后,地脚螺栓伸出地面对设备的搬运和放置造成阻碍的情况。</description><language>chi ; eng</language><subject>EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; SOIL SHIFTING ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>2022</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20221223&amp;DB=EPODOC&amp;CC=CN&amp;NR=115506395A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20221223&amp;DB=EPODOC&amp;CC=CN&amp;NR=115506395A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>ZHU TAO</creatorcontrib><creatorcontrib>CUI DONGLONG</creatorcontrib><creatorcontrib>BIAN FENGLI</creatorcontrib><creatorcontrib>ZHANG XIAOLONG</creatorcontrib><creatorcontrib>XUE YI</creatorcontrib><creatorcontrib>WEI JIANGUO</creatorcontrib><creatorcontrib>ZHANG CHUNBAO</creatorcontrib><creatorcontrib>LIU JUNNAN</creatorcontrib><creatorcontrib>CHEN JINLONG</creatorcontrib><creatorcontrib>LU HEPING</creatorcontrib><creatorcontrib>CHEN JUNYIN</creatorcontrib><creatorcontrib>LIU HAO</creatorcontrib><creatorcontrib>DONG JIANWEI</creatorcontrib><creatorcontrib>YANG LI</creatorcontrib><creatorcontrib>ZHANG PEIDONG</creatorcontrib><creatorcontrib>SU LICI</creatorcontrib><creatorcontrib>XI LIJUN</creatorcontrib><creatorcontrib>PAN YUNPENG</creatorcontrib><creatorcontrib>PI NAN</creatorcontrib><creatorcontrib>GUO JINGCHI</creatorcontrib><creatorcontrib>ZHANG SHUO</creatorcontrib><creatorcontrib>YANG JIE</creatorcontrib><title>Foundation bolt fixing device</title><description>The invention relates to a foundation bolt fixing device, and relates to the technical field of engineering construction. The embedded cylinders are in one-to-one correspondence with the foundation bolts and are in threaded connection with the foundation bolts, the upper ends of the embedded cylinders are open, and the upper surfaces of the embedded cylinders are flush with the surface of a concrete foundation. According to the device, directly-buried foundation bolts are replaced with the pre-buried cylinders, then the equipment is clamped and fixed through the foundation bolts and the pre-buried cylinders, and the situation that after a concrete foundation is solidified, the foundation bolts stretch out of the ground, and consequently carrying and placing of the equipment are hindered is reduced. 本申请涉及一种地脚螺栓固定装置,涉及工程施工技术领域。其包括多个地脚螺栓,以及多个与地脚螺栓一一对应且螺纹连接的预埋筒,所述预埋筒上端开口,且预埋筒的上表面与混凝土地基的表面平齐。本申请通过将直接埋设的地脚螺栓更换成预埋筒,再用地脚螺栓和预埋筒对设备进行夹紧固定,减少了混凝土地基凝固后,地脚螺栓伸出地面对设备的搬运和放置造成阻碍的情况。</description><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>SOIL SHIFTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2022</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZJB1yy_NS0ksyczPU0jKzylRSMusyMxLV0hJLctMTuVhYE1LzClO5YXS3AyKbq4hzh66qQX58anFBYnJqXmpJfHOfoaGpqYGZsaWpo7GxKgBAM8mJCc</recordid><startdate>20221223</startdate><enddate>20221223</enddate><creator>ZHU TAO</creator><creator>CUI DONGLONG</creator><creator>BIAN FENGLI</creator><creator>ZHANG XIAOLONG</creator><creator>XUE YI</creator><creator>WEI JIANGUO</creator><creator>ZHANG CHUNBAO</creator><creator>LIU JUNNAN</creator><creator>CHEN JINLONG</creator><creator>LU HEPING</creator><creator>CHEN JUNYIN</creator><creator>LIU HAO</creator><creator>DONG JIANWEI</creator><creator>YANG LI</creator><creator>ZHANG PEIDONG</creator><creator>SU LICI</creator><creator>XI LIJUN</creator><creator>PAN YUNPENG</creator><creator>PI NAN</creator><creator>GUO JINGCHI</creator><creator>ZHANG SHUO</creator><creator>YANG JIE</creator><scope>EVB</scope></search><sort><creationdate>20221223</creationdate><title>Foundation bolt fixing device</title><author>ZHU TAO ; CUI DONGLONG ; BIAN FENGLI ; ZHANG XIAOLONG ; XUE YI ; WEI JIANGUO ; ZHANG CHUNBAO ; LIU JUNNAN ; CHEN JINLONG ; LU HEPING ; CHEN JUNYIN ; LIU HAO ; DONG JIANWEI ; YANG LI ; ZHANG PEIDONG ; SU LICI ; XI LIJUN ; PAN YUNPENG ; PI NAN ; GUO JINGCHI ; ZHANG SHUO ; YANG JIE</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN115506395A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2022</creationdate><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>SOIL SHIFTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>ZHU TAO</creatorcontrib><creatorcontrib>CUI DONGLONG</creatorcontrib><creatorcontrib>BIAN FENGLI</creatorcontrib><creatorcontrib>ZHANG XIAOLONG</creatorcontrib><creatorcontrib>XUE YI</creatorcontrib><creatorcontrib>WEI JIANGUO</creatorcontrib><creatorcontrib>ZHANG CHUNBAO</creatorcontrib><creatorcontrib>LIU JUNNAN</creatorcontrib><creatorcontrib>CHEN JINLONG</creatorcontrib><creatorcontrib>LU HEPING</creatorcontrib><creatorcontrib>CHEN JUNYIN</creatorcontrib><creatorcontrib>LIU HAO</creatorcontrib><creatorcontrib>DONG JIANWEI</creatorcontrib><creatorcontrib>YANG LI</creatorcontrib><creatorcontrib>ZHANG PEIDONG</creatorcontrib><creatorcontrib>SU LICI</creatorcontrib><creatorcontrib>XI LIJUN</creatorcontrib><creatorcontrib>PAN YUNPENG</creatorcontrib><creatorcontrib>PI NAN</creatorcontrib><creatorcontrib>GUO JINGCHI</creatorcontrib><creatorcontrib>ZHANG SHUO</creatorcontrib><creatorcontrib>YANG JIE</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>ZHU TAO</au><au>CUI DONGLONG</au><au>BIAN FENGLI</au><au>ZHANG XIAOLONG</au><au>XUE YI</au><au>WEI JIANGUO</au><au>ZHANG CHUNBAO</au><au>LIU JUNNAN</au><au>CHEN JINLONG</au><au>LU HEPING</au><au>CHEN JUNYIN</au><au>LIU HAO</au><au>DONG JIANWEI</au><au>YANG LI</au><au>ZHANG PEIDONG</au><au>SU LICI</au><au>XI LIJUN</au><au>PAN YUNPENG</au><au>PI NAN</au><au>GUO JINGCHI</au><au>ZHANG SHUO</au><au>YANG JIE</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Foundation bolt fixing device</title><date>2022-12-23</date><risdate>2022</risdate><abstract>The invention relates to a foundation bolt fixing device, and relates to the technical field of engineering construction. The embedded cylinders are in one-to-one correspondence with the foundation bolts and are in threaded connection with the foundation bolts, the upper ends of the embedded cylinders are open, and the upper surfaces of the embedded cylinders are flush with the surface of a concrete foundation. According to the device, directly-buried foundation bolts are replaced with the pre-buried cylinders, then the equipment is clamped and fixed through the foundation bolts and the pre-buried cylinders, and the situation that after a concrete foundation is solidified, the foundation bolts stretch out of the ground, and consequently carrying and placing of the equipment are hindered is reduced. 本申请涉及一种地脚螺栓固定装置,涉及工程施工技术领域。其包括多个地脚螺栓,以及多个与地脚螺栓一一对应且螺纹连接的预埋筒,所述预埋筒上端开口,且预埋筒的上表面与混凝土地基的表面平齐。本申请通过将直接埋设的地脚螺栓更换成预埋筒,再用地脚螺栓和预埋筒对设备进行夹紧固定,减少了混凝土地基凝固后,地脚螺栓伸出地面对设备的搬运和放置造成阻碍的情况。</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN115506395A
source esp@cenet
subjects EMBANKMENTS
EXCAVATIONS
FIXED CONSTRUCTIONS
FOUNDATIONS
HYDRAULIC ENGINEERING
SOIL SHIFTING
UNDERGROUND OR UNDERWATER STRUCTURES
title Foundation bolt fixing device
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-21T05%3A38%3A46IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=ZHU%20TAO&rft.date=2022-12-23&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN115506395A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true