Protection structure for pier cap construction and installation

According to the pier cap construction installation protection structure, first net bags are arranged on the two sides of a pier cap, and side span angle braces are arranged at the two ends of the pier cap, so that the safety accident rate in the pier cap construction process is lower, smooth constr...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: LIU BIN, WANG GUANGYAO, ZHAO DELIN, HE WEIGUANG, YA JIANTING
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator LIU BIN
WANG GUANGYAO
ZHAO DELIN
HE WEIGUANG
YA JIANTING
description According to the pier cap construction installation protection structure, first net bags are arranged on the two sides of a pier cap, and side span angle braces are arranged at the two ends of the pier cap, so that the safety accident rate in the pier cap construction process is lower, smooth construction is guaranteed, disassembly and installation are convenient under the condition that construction of workers is not affected, and the construction efficiency is improved. Life and property safety of constructors and life safety of ground constructors are ensured, and disasters caused by falling objects from high altitudes are avoided. The bridge pier cap safety rope solves the problem that during bridge pier cap construction, the protective force of a safety rope adopted by a constructor is weak. 本发明公开了一种墩帽施工安装防护结构,在墩帽的两侧设置第一网兜,在墩帽的两端设置边跨角撑,使得墩帽施工过程的安全事故发生率更低,保障了施工的顺利进行,而且在不影响工人施工的情况下拆解安装方便,确保施工人员生命财产安全,地面施工工人的生命安全,避免因高空坠物造成的灾祸。本发明解决了在桥梁墩帽施工时,施工人员采用的安全绳的防护力弱的问题。
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN115506250A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN115506250A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN115506250A3</originalsourceid><addsrcrecordid>eNrjZLAPKMovSU0uyczPUyguKSpNLiktSlVIyy9SKMhMLVJITixQSM7Pg8iA1CTmpShkAvmJOTmJIAEeBta0xJziVF4ozc2g6OYa4uyhm1qQH59aXJCYnJqXWhLv7GdoaGpqYGZkauBoTIwaAPGZMas</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Protection structure for pier cap construction and installation</title><source>esp@cenet</source><creator>LIU BIN ; WANG GUANGYAO ; ZHAO DELIN ; HE WEIGUANG ; YA JIANTING</creator><creatorcontrib>LIU BIN ; WANG GUANGYAO ; ZHAO DELIN ; HE WEIGUANG ; YA JIANTING</creatorcontrib><description>According to the pier cap construction installation protection structure, first net bags are arranged on the two sides of a pier cap, and side span angle braces are arranged at the two ends of the pier cap, so that the safety accident rate in the pier cap construction process is lower, smooth construction is guaranteed, disassembly and installation are convenient under the condition that construction of workers is not affected, and the construction efficiency is improved. Life and property safety of constructors and life safety of ground constructors are ensured, and disasters caused by falling objects from high altitudes are avoided. The bridge pier cap safety rope solves the problem that during bridge pier cap construction, the protective force of a safety rope adopted by a constructor is weak. 本发明公开了一种墩帽施工安装防护结构,在墩帽的两侧设置第一网兜,在墩帽的两端设置边跨角撑,使得墩帽施工过程的安全事故发生率更低,保障了施工的顺利进行,而且在不影响工人施工的情况下拆解安装方便,确保施工人员生命财产安全,地面施工工人的生命安全,避免因高空坠物造成的灾祸。本发明解决了在桥梁墩帽施工时,施工人员采用的安全绳的防护力弱的问题。</description><language>chi ; eng</language><subject>ASSEMBLY OF BRIDGES ; BUILDING ; BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE ; CONSTRUCTION OF BRIDGES ; CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES ; FIXED CONSTRUCTIONS ; FORMS ; HANDLING BUILDING MATERIALS ON THE SITE ; OR VIADUCTS ; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS ; SCAFFOLDING ; SHUTTERING</subject><creationdate>2022</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20221223&amp;DB=EPODOC&amp;CC=CN&amp;NR=115506250A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25544,76293</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20221223&amp;DB=EPODOC&amp;CC=CN&amp;NR=115506250A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>LIU BIN</creatorcontrib><creatorcontrib>WANG GUANGYAO</creatorcontrib><creatorcontrib>ZHAO DELIN</creatorcontrib><creatorcontrib>HE WEIGUANG</creatorcontrib><creatorcontrib>YA JIANTING</creatorcontrib><title>Protection structure for pier cap construction and installation</title><description>According to the pier cap construction installation protection structure, first net bags are arranged on the two sides of a pier cap, and side span angle braces are arranged at the two ends of the pier cap, so that the safety accident rate in the pier cap construction process is lower, smooth construction is guaranteed, disassembly and installation are convenient under the condition that construction of workers is not affected, and the construction efficiency is improved. Life and property safety of constructors and life safety of ground constructors are ensured, and disasters caused by falling objects from high altitudes are avoided. The bridge pier cap safety rope solves the problem that during bridge pier cap construction, the protective force of a safety rope adopted by a constructor is weak. 本发明公开了一种墩帽施工安装防护结构,在墩帽的两侧设置第一网兜,在墩帽的两端设置边跨角撑,使得墩帽施工过程的安全事故发生率更低,保障了施工的顺利进行,而且在不影响工人施工的情况下拆解安装方便,确保施工人员生命财产安全,地面施工工人的生命安全,避免因高空坠物造成的灾祸。本发明解决了在桥梁墩帽施工时,施工人员采用的安全绳的防护力弱的问题。</description><subject>ASSEMBLY OF BRIDGES</subject><subject>BUILDING</subject><subject>BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE</subject><subject>CONSTRUCTION OF BRIDGES</subject><subject>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FORMS</subject><subject>HANDLING BUILDING MATERIALS ON THE SITE</subject><subject>OR VIADUCTS</subject><subject>REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS</subject><subject>SCAFFOLDING</subject><subject>SHUTTERING</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2022</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZLAPKMovSU0uyczPUyguKSpNLiktSlVIyy9SKMhMLVJITixQSM7Pg8iA1CTmpShkAvmJOTmJIAEeBta0xJziVF4ozc2g6OYa4uyhm1qQH59aXJCYnJqXWhLv7GdoaGpqYGZkauBoTIwaAPGZMas</recordid><startdate>20221223</startdate><enddate>20221223</enddate><creator>LIU BIN</creator><creator>WANG GUANGYAO</creator><creator>ZHAO DELIN</creator><creator>HE WEIGUANG</creator><creator>YA JIANTING</creator><scope>EVB</scope></search><sort><creationdate>20221223</creationdate><title>Protection structure for pier cap construction and installation</title><author>LIU BIN ; WANG GUANGYAO ; ZHAO DELIN ; HE WEIGUANG ; YA JIANTING</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN115506250A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2022</creationdate><topic>ASSEMBLY OF BRIDGES</topic><topic>BUILDING</topic><topic>BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE</topic><topic>CONSTRUCTION OF BRIDGES</topic><topic>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FORMS</topic><topic>HANDLING BUILDING MATERIALS ON THE SITE</topic><topic>OR VIADUCTS</topic><topic>REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS</topic><topic>SCAFFOLDING</topic><topic>SHUTTERING</topic><toplevel>online_resources</toplevel><creatorcontrib>LIU BIN</creatorcontrib><creatorcontrib>WANG GUANGYAO</creatorcontrib><creatorcontrib>ZHAO DELIN</creatorcontrib><creatorcontrib>HE WEIGUANG</creatorcontrib><creatorcontrib>YA JIANTING</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>LIU BIN</au><au>WANG GUANGYAO</au><au>ZHAO DELIN</au><au>HE WEIGUANG</au><au>YA JIANTING</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Protection structure for pier cap construction and installation</title><date>2022-12-23</date><risdate>2022</risdate><abstract>According to the pier cap construction installation protection structure, first net bags are arranged on the two sides of a pier cap, and side span angle braces are arranged at the two ends of the pier cap, so that the safety accident rate in the pier cap construction process is lower, smooth construction is guaranteed, disassembly and installation are convenient under the condition that construction of workers is not affected, and the construction efficiency is improved. Life and property safety of constructors and life safety of ground constructors are ensured, and disasters caused by falling objects from high altitudes are avoided. The bridge pier cap safety rope solves the problem that during bridge pier cap construction, the protective force of a safety rope adopted by a constructor is weak. 本发明公开了一种墩帽施工安装防护结构,在墩帽的两侧设置第一网兜,在墩帽的两端设置边跨角撑,使得墩帽施工过程的安全事故发生率更低,保障了施工的顺利进行,而且在不影响工人施工的情况下拆解安装方便,确保施工人员生命财产安全,地面施工工人的生命安全,避免因高空坠物造成的灾祸。本发明解决了在桥梁墩帽施工时,施工人员采用的安全绳的防护力弱的问题。</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN115506250A
source esp@cenet
subjects ASSEMBLY OF BRIDGES
BUILDING
BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE
CONSTRUCTION OF BRIDGES
CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
FIXED CONSTRUCTIONS
FORMS
HANDLING BUILDING MATERIALS ON THE SITE
OR VIADUCTS
REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS
SCAFFOLDING
SHUTTERING
title Protection structure for pier cap construction and installation
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-27T18%3A50%3A19IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=LIU%20BIN&rft.date=2022-12-23&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN115506250A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true