Construction method of clay core wall of earth rock cofferdam

The invention discloses a construction method of a clay core wall of an earth rock cofferdam, which comprises the following steps: arranging a plurality of pile positions on the clay core wall, drilling at each pile position to form a blind hole, recording the depth range of a drill bit when the bit...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: LI BIAO, FAN HENGDONG, CHEN KAI, LI RUISHAN, CHANG YONGMING, CAO CHENGLIANG, GAO CHANGHAI
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator LI BIAO
FAN HENGDONG
CHEN KAI
LI RUISHAN
CHANG YONGMING
CAO CHENGLIANG
GAO CHANGHAI
description The invention discloses a construction method of a clay core wall of an earth rock cofferdam, which comprises the following steps: arranging a plurality of pile positions on the clay core wall, drilling at each pile position to form a blind hole, recording the depth range of a drill bit when the bit pressure is abnormal in the drilling process, and marking the depth range as an abnormal section; a sleeve is inserted into the blind hole; the grouting pipe extends into the casing pipe and sinks to a preset position, grout is injected through the grouting pipe, the casing pipe is broken through spraying, the grouting pipe rotatably ascends in the grout spraying process, the difference value between the preset sprayed face elevation and the actual sprayed face elevation is calculated every first preset time in the abnormal section, if the difference value exceeds the preset difference value, grout spraying is paused, and if the difference value does not exceed the preset difference value, grout spraying is stoppe
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN115450237A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN115450237A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN115450237A3</originalsourceid><addsrcrecordid>eNrjZLB1zs8rLikqTS7JzM9TyE0tychPUchPU0jOSaxUSM4vSlUoT8zJAYmkJhaVZCgU5SdnA8XT0lKLUhJzeRhY0xJzilN5oTQ3g6Kba4izh25qQX58anFBYnJqXmpJvLOfoaGpiamBkbG5ozExagAH4C_e</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Construction method of clay core wall of earth rock cofferdam</title><source>esp@cenet</source><creator>LI BIAO ; FAN HENGDONG ; CHEN KAI ; LI RUISHAN ; CHANG YONGMING ; CAO CHENGLIANG ; GAO CHANGHAI</creator><creatorcontrib>LI BIAO ; FAN HENGDONG ; CHEN KAI ; LI RUISHAN ; CHANG YONGMING ; CAO CHENGLIANG ; GAO CHANGHAI</creatorcontrib><description>The invention discloses a construction method of a clay core wall of an earth rock cofferdam, which comprises the following steps: arranging a plurality of pile positions on the clay core wall, drilling at each pile position to form a blind hole, recording the depth range of a drill bit when the bit pressure is abnormal in the drilling process, and marking the depth range as an abnormal section; a sleeve is inserted into the blind hole; the grouting pipe extends into the casing pipe and sinks to a preset position, grout is injected through the grouting pipe, the casing pipe is broken through spraying, the grouting pipe rotatably ascends in the grout spraying process, the difference value between the preset sprayed face elevation and the actual sprayed face elevation is calculated every first preset time in the abnormal section, if the difference value exceeds the preset difference value, grout spraying is paused, and if the difference value does not exceed the preset difference value, grout spraying is stoppe</description><language>chi ; eng</language><subject>ARTIFICIAL STONE ; CEMENTS ; CERAMICS ; CHEMISTRY ; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDINGMATERIALS ; CONCRETE ; EARTH DRILLING ; EARTH DRILLING, e.g. DEEP DRILLING ; EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; LIME, MAGNESIA ; METALLURGY ; MINING ; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS ; REFRACTORIES ; SLAG ; SOIL SHIFTING ; TREATMENT OF NATURAL STONE ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>2022</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20221209&amp;DB=EPODOC&amp;CC=CN&amp;NR=115450237A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25543,76294</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20221209&amp;DB=EPODOC&amp;CC=CN&amp;NR=115450237A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>LI BIAO</creatorcontrib><creatorcontrib>FAN HENGDONG</creatorcontrib><creatorcontrib>CHEN KAI</creatorcontrib><creatorcontrib>LI RUISHAN</creatorcontrib><creatorcontrib>CHANG YONGMING</creatorcontrib><creatorcontrib>CAO CHENGLIANG</creatorcontrib><creatorcontrib>GAO CHANGHAI</creatorcontrib><title>Construction method of clay core wall of earth rock cofferdam</title><description>The invention discloses a construction method of a clay core wall of an earth rock cofferdam, which comprises the following steps: arranging a plurality of pile positions on the clay core wall, drilling at each pile position to form a blind hole, recording the depth range of a drill bit when the bit pressure is abnormal in the drilling process, and marking the depth range as an abnormal section; a sleeve is inserted into the blind hole; the grouting pipe extends into the casing pipe and sinks to a preset position, grout is injected through the grouting pipe, the casing pipe is broken through spraying, the grouting pipe rotatably ascends in the grout spraying process, the difference value between the preset sprayed face elevation and the actual sprayed face elevation is calculated every first preset time in the abnormal section, if the difference value exceeds the preset difference value, grout spraying is paused, and if the difference value does not exceed the preset difference value, grout spraying is stoppe</description><subject>ARTIFICIAL STONE</subject><subject>CEMENTS</subject><subject>CERAMICS</subject><subject>CHEMISTRY</subject><subject>COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDINGMATERIALS</subject><subject>CONCRETE</subject><subject>EARTH DRILLING</subject><subject>EARTH DRILLING, e.g. DEEP DRILLING</subject><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>LIME, MAGNESIA</subject><subject>METALLURGY</subject><subject>MINING</subject><subject>OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS</subject><subject>REFRACTORIES</subject><subject>SLAG</subject><subject>SOIL SHIFTING</subject><subject>TREATMENT OF NATURAL STONE</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2022</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZLB1zs8rLikqTS7JzM9TyE0tychPUchPU0jOSaxUSM4vSlUoT8zJAYmkJhaVZCgU5SdnA8XT0lKLUhJzeRhY0xJzilN5oTQ3g6Kba4izh25qQX58anFBYnJqXmpJvLOfoaGpiamBkbG5ozExagAH4C_e</recordid><startdate>20221209</startdate><enddate>20221209</enddate><creator>LI BIAO</creator><creator>FAN HENGDONG</creator><creator>CHEN KAI</creator><creator>LI RUISHAN</creator><creator>CHANG YONGMING</creator><creator>CAO CHENGLIANG</creator><creator>GAO CHANGHAI</creator><scope>EVB</scope></search><sort><creationdate>20221209</creationdate><title>Construction method of clay core wall of earth rock cofferdam</title><author>LI BIAO ; FAN HENGDONG ; CHEN KAI ; LI RUISHAN ; CHANG YONGMING ; CAO CHENGLIANG ; GAO CHANGHAI</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN115450237A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2022</creationdate><topic>ARTIFICIAL STONE</topic><topic>CEMENTS</topic><topic>CERAMICS</topic><topic>CHEMISTRY</topic><topic>COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDINGMATERIALS</topic><topic>CONCRETE</topic><topic>EARTH DRILLING</topic><topic>EARTH DRILLING, e.g. DEEP DRILLING</topic><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>LIME, MAGNESIA</topic><topic>METALLURGY</topic><topic>MINING</topic><topic>OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS</topic><topic>REFRACTORIES</topic><topic>SLAG</topic><topic>SOIL SHIFTING</topic><topic>TREATMENT OF NATURAL STONE</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>LI BIAO</creatorcontrib><creatorcontrib>FAN HENGDONG</creatorcontrib><creatorcontrib>CHEN KAI</creatorcontrib><creatorcontrib>LI RUISHAN</creatorcontrib><creatorcontrib>CHANG YONGMING</creatorcontrib><creatorcontrib>CAO CHENGLIANG</creatorcontrib><creatorcontrib>GAO CHANGHAI</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>LI BIAO</au><au>FAN HENGDONG</au><au>CHEN KAI</au><au>LI RUISHAN</au><au>CHANG YONGMING</au><au>CAO CHENGLIANG</au><au>GAO CHANGHAI</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Construction method of clay core wall of earth rock cofferdam</title><date>2022-12-09</date><risdate>2022</risdate><abstract>The invention discloses a construction method of a clay core wall of an earth rock cofferdam, which comprises the following steps: arranging a plurality of pile positions on the clay core wall, drilling at each pile position to form a blind hole, recording the depth range of a drill bit when the bit pressure is abnormal in the drilling process, and marking the depth range as an abnormal section; a sleeve is inserted into the blind hole; the grouting pipe extends into the casing pipe and sinks to a preset position, grout is injected through the grouting pipe, the casing pipe is broken through spraying, the grouting pipe rotatably ascends in the grout spraying process, the difference value between the preset sprayed face elevation and the actual sprayed face elevation is calculated every first preset time in the abnormal section, if the difference value exceeds the preset difference value, grout spraying is paused, and if the difference value does not exceed the preset difference value, grout spraying is stoppe</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN115450237A
source esp@cenet
subjects ARTIFICIAL STONE
CEMENTS
CERAMICS
CHEMISTRY
COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDINGMATERIALS
CONCRETE
EARTH DRILLING
EARTH DRILLING, e.g. DEEP DRILLING
EMBANKMENTS
EXCAVATIONS
FIXED CONSTRUCTIONS
FOUNDATIONS
HYDRAULIC ENGINEERING
LIME, MAGNESIA
METALLURGY
MINING
OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS
REFRACTORIES
SLAG
SOIL SHIFTING
TREATMENT OF NATURAL STONE
UNDERGROUND OR UNDERWATER STRUCTURES
title Construction method of clay core wall of earth rock cofferdam
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-23T03%3A46%3A48IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=LI%20BIAO&rft.date=2022-12-09&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN115450237A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true