Offshore pile foundation anti-scouring device and mounting method thereof

The offshore pile foundation anti-scour device comprises a pile foundation, a turbulent flow energy dissipation mechanism and a riprap mechanism, the pile foundation is of a vertically-arranged rod-shaped structure, the lower end of the pile foundation is used for being fixedly connected with a seab...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: GAN JIN, ZHONG WEITAO, YE YUNLING
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator GAN JIN
ZHONG WEITAO
YE YUNLING
description The offshore pile foundation anti-scour device comprises a pile foundation, a turbulent flow energy dissipation mechanism and a riprap mechanism, the pile foundation is of a vertically-arranged rod-shaped structure, the lower end of the pile foundation is used for being fixedly connected with a seabed, the turbulent flow energy dissipation mechanism comprises an energy dissipation slope, and the energy dissipation slope is provided with a filling hole; the energy dissipation slope body is fixedly arranged on the seabed and arranged on the pile foundation in a sleeving mode through the filling hole, a filling space is formed between the filling hole and the pile foundation, and the side face of the energy dissipation slope body is a slope face. The riprapping mechanism comprises a buoyancy part, a connecting rod and a riprapping part, the buoyancy part is slidably connected with the pile foundation and can drive the riprapping mechanism to float upwards under the buoyancy effect, one end of the connecting rod
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN115419118A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN115419118A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN115419118A3</originalsourceid><addsrcrecordid>eNrjZPD0T0srzsgvSlUoyMxJVUjLL81LSSzJzM9TSMwrydQtTs4vLcrMS1dISS3LTE4FCqYo5ALVlIDEclNLMvJTFEoyUotS89N4GFjTEnOKU3mhNDeDoptriLOHbmpBfnxqcUFicmpeakm8s5-hoamJoaWhoYWjMTFqABO9NRA</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Offshore pile foundation anti-scouring device and mounting method thereof</title><source>esp@cenet</source><creator>GAN JIN ; ZHONG WEITAO ; YE YUNLING</creator><creatorcontrib>GAN JIN ; ZHONG WEITAO ; YE YUNLING</creatorcontrib><description>The offshore pile foundation anti-scour device comprises a pile foundation, a turbulent flow energy dissipation mechanism and a riprap mechanism, the pile foundation is of a vertically-arranged rod-shaped structure, the lower end of the pile foundation is used for being fixedly connected with a seabed, the turbulent flow energy dissipation mechanism comprises an energy dissipation slope, and the energy dissipation slope is provided with a filling hole; the energy dissipation slope body is fixedly arranged on the seabed and arranged on the pile foundation in a sleeving mode through the filling hole, a filling space is formed between the filling hole and the pile foundation, and the side face of the energy dissipation slope body is a slope face. The riprapping mechanism comprises a buoyancy part, a connecting rod and a riprapping part, the buoyancy part is slidably connected with the pile foundation and can drive the riprapping mechanism to float upwards under the buoyancy effect, one end of the connecting rod</description><language>chi ; eng</language><subject>EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; SOIL SHIFTING ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>2022</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20221202&amp;DB=EPODOC&amp;CC=CN&amp;NR=115419118A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20221202&amp;DB=EPODOC&amp;CC=CN&amp;NR=115419118A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>GAN JIN</creatorcontrib><creatorcontrib>ZHONG WEITAO</creatorcontrib><creatorcontrib>YE YUNLING</creatorcontrib><title>Offshore pile foundation anti-scouring device and mounting method thereof</title><description>The offshore pile foundation anti-scour device comprises a pile foundation, a turbulent flow energy dissipation mechanism and a riprap mechanism, the pile foundation is of a vertically-arranged rod-shaped structure, the lower end of the pile foundation is used for being fixedly connected with a seabed, the turbulent flow energy dissipation mechanism comprises an energy dissipation slope, and the energy dissipation slope is provided with a filling hole; the energy dissipation slope body is fixedly arranged on the seabed and arranged on the pile foundation in a sleeving mode through the filling hole, a filling space is formed between the filling hole and the pile foundation, and the side face of the energy dissipation slope body is a slope face. The riprapping mechanism comprises a buoyancy part, a connecting rod and a riprapping part, the buoyancy part is slidably connected with the pile foundation and can drive the riprapping mechanism to float upwards under the buoyancy effect, one end of the connecting rod</description><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>SOIL SHIFTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2022</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZPD0T0srzsgvSlUoyMxJVUjLL81LSSzJzM9TSMwrydQtTs4vLcrMS1dISS3LTE4FCqYo5ALVlIDEclNLMvJTFEoyUotS89N4GFjTEnOKU3mhNDeDoptriLOHbmpBfnxqcUFicmpeakm8s5-hoamJoaWhoYWjMTFqABO9NRA</recordid><startdate>20221202</startdate><enddate>20221202</enddate><creator>GAN JIN</creator><creator>ZHONG WEITAO</creator><creator>YE YUNLING</creator><scope>EVB</scope></search><sort><creationdate>20221202</creationdate><title>Offshore pile foundation anti-scouring device and mounting method thereof</title><author>GAN JIN ; ZHONG WEITAO ; YE YUNLING</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN115419118A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2022</creationdate><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>SOIL SHIFTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>GAN JIN</creatorcontrib><creatorcontrib>ZHONG WEITAO</creatorcontrib><creatorcontrib>YE YUNLING</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>GAN JIN</au><au>ZHONG WEITAO</au><au>YE YUNLING</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Offshore pile foundation anti-scouring device and mounting method thereof</title><date>2022-12-02</date><risdate>2022</risdate><abstract>The offshore pile foundation anti-scour device comprises a pile foundation, a turbulent flow energy dissipation mechanism and a riprap mechanism, the pile foundation is of a vertically-arranged rod-shaped structure, the lower end of the pile foundation is used for being fixedly connected with a seabed, the turbulent flow energy dissipation mechanism comprises an energy dissipation slope, and the energy dissipation slope is provided with a filling hole; the energy dissipation slope body is fixedly arranged on the seabed and arranged on the pile foundation in a sleeving mode through the filling hole, a filling space is formed between the filling hole and the pile foundation, and the side face of the energy dissipation slope body is a slope face. The riprapping mechanism comprises a buoyancy part, a connecting rod and a riprapping part, the buoyancy part is slidably connected with the pile foundation and can drive the riprapping mechanism to float upwards under the buoyancy effect, one end of the connecting rod</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN115419118A
source esp@cenet
subjects EMBANKMENTS
EXCAVATIONS
FIXED CONSTRUCTIONS
FOUNDATIONS
HYDRAULIC ENGINEERING
SOIL SHIFTING
UNDERGROUND OR UNDERWATER STRUCTURES
title Offshore pile foundation anti-scouring device and mounting method thereof
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-02T21%3A14%3A04IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=GAN%20JIN&rft.date=2022-12-02&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN115419118A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true