Pumped storage power station double-inclined-shaft water conveying system and TBM continuous tunneling method

The invention provides a pumped storage power station double-inclined-shaft water conveying system and a TBM continuous tunneling method. The system comprises a first water diversion inclined shaft, a second water diversion inclined shaft, a first water diversion upper adit, a second water diversion...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: MA XIANGTAO, ZHONG WEIBIN, MIAO NING, WANG YONGMING, HUANG LEI, ZHOU XUETAO, ZHOU CHUIYI, WU JIAN, MIAO SHUANGPING, ZHU PENG, ZHONG YUNZHI
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator MA XIANGTAO
ZHONG WEIBIN
MIAO NING
WANG YONGMING
HUANG LEI
ZHOU XUETAO
ZHOU CHUIYI
WU JIAN
MIAO SHUANGPING
ZHU PENG
ZHONG YUNZHI
description The invention provides a pumped storage power station double-inclined-shaft water conveying system and a TBM continuous tunneling method. The system comprises a first water diversion inclined shaft, a second water diversion inclined shaft, a first water diversion upper adit, a second water diversion upper adit, a horizontal arc-shaped connecting hole, a first water diversion lower adit, a second water diversion lower adit, a first water diversion branch pipe, a second water diversion branch pipe, a first tailrace tunnel and a second tailrace tunnel which are arranged side by side, and an empty pushing track is arranged; the first water diversion lower adit and/or the second water diversion lower adit are/is communicated with the construction adit; and the construction adit forms a driving-in/driving-out channel and a slag discharging channel of the TBM tunneling equipment. According to the method, the TBM tunneling equipment is prevented from being disassembled, transferred, assembled and started for many tim
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN115419029A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN115419029A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN115419029A3</originalsourceid><addsrcrecordid>eNqNyj0OgkAQhmEaC6PeYTwAifhTUCrR2Ggs6MnKDrDJ7syGnZVweyHxAFZf3nzPMnGv6DxqCMK9ahE8D9hPpcQwgeb4tpgaqq0h1GnoVCMwKJlMzfTB0VALYQyCDhRpKC-P-RBDkWMAiURoZ-NQOtbrZNEoG3Dz21WyvV3L4p6i5wqDVzUSSlU8s-x0zPLdPj8f_jFf3d5C8A</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Pumped storage power station double-inclined-shaft water conveying system and TBM continuous tunneling method</title><source>esp@cenet</source><creator>MA XIANGTAO ; ZHONG WEIBIN ; MIAO NING ; WANG YONGMING ; HUANG LEI ; ZHOU XUETAO ; ZHOU CHUIYI ; WU JIAN ; MIAO SHUANGPING ; ZHU PENG ; ZHONG YUNZHI</creator><creatorcontrib>MA XIANGTAO ; ZHONG WEIBIN ; MIAO NING ; WANG YONGMING ; HUANG LEI ; ZHOU XUETAO ; ZHOU CHUIYI ; WU JIAN ; MIAO SHUANGPING ; ZHU PENG ; ZHONG YUNZHI</creatorcontrib><description>The invention provides a pumped storage power station double-inclined-shaft water conveying system and a TBM continuous tunneling method. The system comprises a first water diversion inclined shaft, a second water diversion inclined shaft, a first water diversion upper adit, a second water diversion upper adit, a horizontal arc-shaped connecting hole, a first water diversion lower adit, a second water diversion lower adit, a first water diversion branch pipe, a second water diversion branch pipe, a first tailrace tunnel and a second tailrace tunnel which are arranged side by side, and an empty pushing track is arranged; the first water diversion lower adit and/or the second water diversion lower adit are/is communicated with the construction adit; and the construction adit forms a driving-in/driving-out channel and a slag discharging channel of the TBM tunneling equipment. According to the method, the TBM tunneling equipment is prevented from being disassembled, transferred, assembled and started for many tim</description><language>chi ; eng</language><subject>EARTH DRILLING ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; GALLERIES ; HYDRAULIC ENGINEERING ; LARGE UNDERGROUND CHAMBERS ; MINING ; SHAFTS ; SOIL SHIFTING ; TUNNELS</subject><creationdate>2022</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20221202&amp;DB=EPODOC&amp;CC=CN&amp;NR=115419029A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76289</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20221202&amp;DB=EPODOC&amp;CC=CN&amp;NR=115419029A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>MA XIANGTAO</creatorcontrib><creatorcontrib>ZHONG WEIBIN</creatorcontrib><creatorcontrib>MIAO NING</creatorcontrib><creatorcontrib>WANG YONGMING</creatorcontrib><creatorcontrib>HUANG LEI</creatorcontrib><creatorcontrib>ZHOU XUETAO</creatorcontrib><creatorcontrib>ZHOU CHUIYI</creatorcontrib><creatorcontrib>WU JIAN</creatorcontrib><creatorcontrib>MIAO SHUANGPING</creatorcontrib><creatorcontrib>ZHU PENG</creatorcontrib><creatorcontrib>ZHONG YUNZHI</creatorcontrib><title>Pumped storage power station double-inclined-shaft water conveying system and TBM continuous tunneling method</title><description>The invention provides a pumped storage power station double-inclined-shaft water conveying system and a TBM continuous tunneling method. The system comprises a first water diversion inclined shaft, a second water diversion inclined shaft, a first water diversion upper adit, a second water diversion upper adit, a horizontal arc-shaped connecting hole, a first water diversion lower adit, a second water diversion lower adit, a first water diversion branch pipe, a second water diversion branch pipe, a first tailrace tunnel and a second tailrace tunnel which are arranged side by side, and an empty pushing track is arranged; the first water diversion lower adit and/or the second water diversion lower adit are/is communicated with the construction adit; and the construction adit forms a driving-in/driving-out channel and a slag discharging channel of the TBM tunneling equipment. According to the method, the TBM tunneling equipment is prevented from being disassembled, transferred, assembled and started for many tim</description><subject>EARTH DRILLING</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>GALLERIES</subject><subject>HYDRAULIC ENGINEERING</subject><subject>LARGE UNDERGROUND CHAMBERS</subject><subject>MINING</subject><subject>SHAFTS</subject><subject>SOIL SHIFTING</subject><subject>TUNNELS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2022</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNyj0OgkAQhmEaC6PeYTwAifhTUCrR2Ggs6MnKDrDJ7syGnZVweyHxAFZf3nzPMnGv6DxqCMK9ahE8D9hPpcQwgeb4tpgaqq0h1GnoVCMwKJlMzfTB0VALYQyCDhRpKC-P-RBDkWMAiURoZ-NQOtbrZNEoG3Dz21WyvV3L4p6i5wqDVzUSSlU8s-x0zPLdPj8f_jFf3d5C8A</recordid><startdate>20221202</startdate><enddate>20221202</enddate><creator>MA XIANGTAO</creator><creator>ZHONG WEIBIN</creator><creator>MIAO NING</creator><creator>WANG YONGMING</creator><creator>HUANG LEI</creator><creator>ZHOU XUETAO</creator><creator>ZHOU CHUIYI</creator><creator>WU JIAN</creator><creator>MIAO SHUANGPING</creator><creator>ZHU PENG</creator><creator>ZHONG YUNZHI</creator><scope>EVB</scope></search><sort><creationdate>20221202</creationdate><title>Pumped storage power station double-inclined-shaft water conveying system and TBM continuous tunneling method</title><author>MA XIANGTAO ; ZHONG WEIBIN ; MIAO NING ; WANG YONGMING ; HUANG LEI ; ZHOU XUETAO ; ZHOU CHUIYI ; WU JIAN ; MIAO SHUANGPING ; ZHU PENG ; ZHONG YUNZHI</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN115419029A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2022</creationdate><topic>EARTH DRILLING</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>GALLERIES</topic><topic>HYDRAULIC ENGINEERING</topic><topic>LARGE UNDERGROUND CHAMBERS</topic><topic>MINING</topic><topic>SHAFTS</topic><topic>SOIL SHIFTING</topic><topic>TUNNELS</topic><toplevel>online_resources</toplevel><creatorcontrib>MA XIANGTAO</creatorcontrib><creatorcontrib>ZHONG WEIBIN</creatorcontrib><creatorcontrib>MIAO NING</creatorcontrib><creatorcontrib>WANG YONGMING</creatorcontrib><creatorcontrib>HUANG LEI</creatorcontrib><creatorcontrib>ZHOU XUETAO</creatorcontrib><creatorcontrib>ZHOU CHUIYI</creatorcontrib><creatorcontrib>WU JIAN</creatorcontrib><creatorcontrib>MIAO SHUANGPING</creatorcontrib><creatorcontrib>ZHU PENG</creatorcontrib><creatorcontrib>ZHONG YUNZHI</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>MA XIANGTAO</au><au>ZHONG WEIBIN</au><au>MIAO NING</au><au>WANG YONGMING</au><au>HUANG LEI</au><au>ZHOU XUETAO</au><au>ZHOU CHUIYI</au><au>WU JIAN</au><au>MIAO SHUANGPING</au><au>ZHU PENG</au><au>ZHONG YUNZHI</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Pumped storage power station double-inclined-shaft water conveying system and TBM continuous tunneling method</title><date>2022-12-02</date><risdate>2022</risdate><abstract>The invention provides a pumped storage power station double-inclined-shaft water conveying system and a TBM continuous tunneling method. The system comprises a first water diversion inclined shaft, a second water diversion inclined shaft, a first water diversion upper adit, a second water diversion upper adit, a horizontal arc-shaped connecting hole, a first water diversion lower adit, a second water diversion lower adit, a first water diversion branch pipe, a second water diversion branch pipe, a first tailrace tunnel and a second tailrace tunnel which are arranged side by side, and an empty pushing track is arranged; the first water diversion lower adit and/or the second water diversion lower adit are/is communicated with the construction adit; and the construction adit forms a driving-in/driving-out channel and a slag discharging channel of the TBM tunneling equipment. According to the method, the TBM tunneling equipment is prevented from being disassembled, transferred, assembled and started for many tim</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN115419029A
source esp@cenet
subjects EARTH DRILLING
FIXED CONSTRUCTIONS
FOUNDATIONS
GALLERIES
HYDRAULIC ENGINEERING
LARGE UNDERGROUND CHAMBERS
MINING
SHAFTS
SOIL SHIFTING
TUNNELS
title Pumped storage power station double-inclined-shaft water conveying system and TBM continuous tunneling method
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-06T13%3A43%3A35IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=MA%20XIANGTAO&rft.date=2022-12-02&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN115419029A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true