Excavation construction method for subsurface tunnel in discontinuous lithologic stratum
The invention provides an excavation construction method for a subsurface tunnel in discontinuous lithologic stratums, which comprises the following steps: step 1, when lithologic grades of upper and lower stratums of the same section are different during construction, completing advance support, an...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Schreiben Sie den ersten Kommentar!