Safe and rapid construction method for direct conversion from step normal to CRD method
A safe and rapid construction method for direct conversion from a step method to a CRD method is characterized in that in shallow-buried excavation tunnel construction, pre-reinforcement, advance support measures and informatization construction measures are combined, and conversion from an upper st...
Gespeichert in:
Hauptverfasser: | , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Schreiben Sie den ersten Kommentar!