Earth excavation method for secondary island building of silt stratum of oversized deep foundation pit

The invention discloses an earth excavation method for secondary island construction of a silt stratum of an oversized deep foundation pit, which comprises the following steps: (1) primary island construction: the primary island construction elevation is the original ground elevation; (2) excavating...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: HOU LIANBIAO, MA XIAODONG, HUA KEQING, LIU YONGLI, YE XIANGJUN, GAO FENG, WO LIUJIE
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator HOU LIANBIAO
MA XIAODONG
HUA KEQING
LIU YONGLI
YE XIANGJUN
GAO FENG
WO LIUJIE
description The invention discloses an earth excavation method for secondary island construction of a silt stratum of an oversized deep foundation pit, which comprises the following steps: (1) primary island construction: the primary island construction elevation is the original ground elevation; (2) excavating earthwork above the bottom elevation of the top beam supporting system, and constructing the top beam supporting system; (3) secondary island building is conducted, the elevation of the secondary island building is the same as the elevation of the top of the supporting beam, and a slope ramp is led from a soil outlet to a secondary built center island; (4) island-type segmentation and layering are conducted, and an excavator transfers the muddy soil layer of the foundation pit below the supporting beam in a stepped mode; (5) a cushion layer is constructed, a pile head is processed, pile foundation detection work is completed, and a waterproof layer is constructed; and (6) sectioning and timely closing the bottom p
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN115387345A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN115387345A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN115387345A3</originalsourceid><addsrcrecordid>eNqNjDEKwkAQRdNYiHqH8QAWIQZtQ4hYWdmHMTtrBja7y84kqKc3igew-jx47y8z22DSHujR4YTKwcNA2gcDNiQQ6oI3mJ7A4tAbuI3sDPs7BAvCTkE0oY7Dh8NESfhFBgxRnPtxTr-PkXWdLSw6oc1vV9n21Fzr845iaEkiduRJ2_qS52VxPBT7sir-cd6o20AJ</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Earth excavation method for secondary island building of silt stratum of oversized deep foundation pit</title><source>esp@cenet</source><creator>HOU LIANBIAO ; MA XIAODONG ; HUA KEQING ; LIU YONGLI ; YE XIANGJUN ; GAO FENG ; WO LIUJIE</creator><creatorcontrib>HOU LIANBIAO ; MA XIAODONG ; HUA KEQING ; LIU YONGLI ; YE XIANGJUN ; GAO FENG ; WO LIUJIE</creatorcontrib><description>The invention discloses an earth excavation method for secondary island construction of a silt stratum of an oversized deep foundation pit, which comprises the following steps: (1) primary island construction: the primary island construction elevation is the original ground elevation; (2) excavating earthwork above the bottom elevation of the top beam supporting system, and constructing the top beam supporting system; (3) secondary island building is conducted, the elevation of the secondary island building is the same as the elevation of the top of the supporting beam, and a slope ramp is led from a soil outlet to a secondary built center island; (4) island-type segmentation and layering are conducted, and an excavator transfers the muddy soil layer of the foundation pit below the supporting beam in a stepped mode; (5) a cushion layer is constructed, a pile head is processed, pile foundation detection work is completed, and a waterproof layer is constructed; and (6) sectioning and timely closing the bottom p</description><language>chi ; eng</language><subject>EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; SOIL SHIFTING ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>2022</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20221125&amp;DB=EPODOC&amp;CC=CN&amp;NR=115387345A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25543,76293</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20221125&amp;DB=EPODOC&amp;CC=CN&amp;NR=115387345A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>HOU LIANBIAO</creatorcontrib><creatorcontrib>MA XIAODONG</creatorcontrib><creatorcontrib>HUA KEQING</creatorcontrib><creatorcontrib>LIU YONGLI</creatorcontrib><creatorcontrib>YE XIANGJUN</creatorcontrib><creatorcontrib>GAO FENG</creatorcontrib><creatorcontrib>WO LIUJIE</creatorcontrib><title>Earth excavation method for secondary island building of silt stratum of oversized deep foundation pit</title><description>The invention discloses an earth excavation method for secondary island construction of a silt stratum of an oversized deep foundation pit, which comprises the following steps: (1) primary island construction: the primary island construction elevation is the original ground elevation; (2) excavating earthwork above the bottom elevation of the top beam supporting system, and constructing the top beam supporting system; (3) secondary island building is conducted, the elevation of the secondary island building is the same as the elevation of the top of the supporting beam, and a slope ramp is led from a soil outlet to a secondary built center island; (4) island-type segmentation and layering are conducted, and an excavator transfers the muddy soil layer of the foundation pit below the supporting beam in a stepped mode; (5) a cushion layer is constructed, a pile head is processed, pile foundation detection work is completed, and a waterproof layer is constructed; and (6) sectioning and timely closing the bottom p</description><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>SOIL SHIFTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2022</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNjDEKwkAQRdNYiHqH8QAWIQZtQ4hYWdmHMTtrBja7y84kqKc3igew-jx47y8z22DSHujR4YTKwcNA2gcDNiQQ6oI3mJ7A4tAbuI3sDPs7BAvCTkE0oY7Dh8NESfhFBgxRnPtxTr-PkXWdLSw6oc1vV9n21Fzr845iaEkiduRJ2_qS52VxPBT7sir-cd6o20AJ</recordid><startdate>20221125</startdate><enddate>20221125</enddate><creator>HOU LIANBIAO</creator><creator>MA XIAODONG</creator><creator>HUA KEQING</creator><creator>LIU YONGLI</creator><creator>YE XIANGJUN</creator><creator>GAO FENG</creator><creator>WO LIUJIE</creator><scope>EVB</scope></search><sort><creationdate>20221125</creationdate><title>Earth excavation method for secondary island building of silt stratum of oversized deep foundation pit</title><author>HOU LIANBIAO ; MA XIAODONG ; HUA KEQING ; LIU YONGLI ; YE XIANGJUN ; GAO FENG ; WO LIUJIE</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN115387345A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2022</creationdate><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>SOIL SHIFTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>HOU LIANBIAO</creatorcontrib><creatorcontrib>MA XIAODONG</creatorcontrib><creatorcontrib>HUA KEQING</creatorcontrib><creatorcontrib>LIU YONGLI</creatorcontrib><creatorcontrib>YE XIANGJUN</creatorcontrib><creatorcontrib>GAO FENG</creatorcontrib><creatorcontrib>WO LIUJIE</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>HOU LIANBIAO</au><au>MA XIAODONG</au><au>HUA KEQING</au><au>LIU YONGLI</au><au>YE XIANGJUN</au><au>GAO FENG</au><au>WO LIUJIE</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Earth excavation method for secondary island building of silt stratum of oversized deep foundation pit</title><date>2022-11-25</date><risdate>2022</risdate><abstract>The invention discloses an earth excavation method for secondary island construction of a silt stratum of an oversized deep foundation pit, which comprises the following steps: (1) primary island construction: the primary island construction elevation is the original ground elevation; (2) excavating earthwork above the bottom elevation of the top beam supporting system, and constructing the top beam supporting system; (3) secondary island building is conducted, the elevation of the secondary island building is the same as the elevation of the top of the supporting beam, and a slope ramp is led from a soil outlet to a secondary built center island; (4) island-type segmentation and layering are conducted, and an excavator transfers the muddy soil layer of the foundation pit below the supporting beam in a stepped mode; (5) a cushion layer is constructed, a pile head is processed, pile foundation detection work is completed, and a waterproof layer is constructed; and (6) sectioning and timely closing the bottom p</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN115387345A
source esp@cenet
subjects EMBANKMENTS
EXCAVATIONS
FIXED CONSTRUCTIONS
FOUNDATIONS
HYDRAULIC ENGINEERING
SOIL SHIFTING
UNDERGROUND OR UNDERWATER STRUCTURES
title Earth excavation method for secondary island building of silt stratum of oversized deep foundation pit
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-24T19%3A57%3A01IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=HOU%20LIANBIAO&rft.date=2022-11-25&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN115387345A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true