Cofferdam structure with cement mixing piles combined with steel sheet piles and construction method

The invention provides a cofferdam structure combining cement-soil mixing piles with steel sheet piles and a construction method. The cofferdam structure comprises a plurality of drill holes formed in an island, the cement-soil mixing piles are poured in the drill holes, the steel sheet piles are in...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: ZHANG CHENGLIN, DENG WEN, ZHOU JIE, ZHANG XINGCHENG, LI BO, WU YINBAO, QIAN WEIPING, WAN MENG, ZHANG LIWEI, SUN YANBO, CHEN DAN, LIU QUANWEN, LIU KANG, TU YOULIANG, ZHANG JIA, WEN JINGHUA
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator ZHANG CHENGLIN
DENG WEN
ZHOU JIE
ZHANG XINGCHENG
LI BO
WU YINBAO
QIAN WEIPING
WAN MENG
ZHANG LIWEI
SUN YANBO
CHEN DAN
LIU QUANWEN
LIU KANG
TU YOULIANG
ZHANG JIA
WEN JINGHUA
description The invention provides a cofferdam structure combining cement-soil mixing piles with steel sheet piles and a construction method. The cofferdam structure comprises a plurality of drill holes formed in an island, the cement-soil mixing piles are poured in the drill holes, the steel sheet piles are inserted in the cement-soil mixing piles, the multiple steel sheet piles are connected to form a closed space, and a supporting system used for stabilizing is arranged in the closed space; the drill holes comprise a plurality of first hole sites and second hole sites which are arranged at intervals, and overlapping areas are arranged between the first hole sites and the second hole sites. The structure is compact, the problem that pile sinking is difficult during hard geological construction can be solved, the overall construction efficiency is greatly improved, the construction safety risk is reduced, water and soil are effectively prevented in the construction process, and the construction quality is better. 本发明提供一
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN115369899A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN115369899A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN115369899A3</originalsourceid><addsrcrecordid>eNqNzLEKwjAUheEuDqK-w_UBHEpR7FiC4uTkXmJyagPJTUhu0cdXaB_A6Qz_x1lXVsVhQLY6UJE8GZky6O1kJIMAFgru4_hFyXkUMjE8HcPOogjgqYyALF2z_Rmen1xkCpAx2m21GrQv2C27qfbXy0PdDkixR0nagCG9utf1sTm157btmn_MFzpOP5k</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Cofferdam structure with cement mixing piles combined with steel sheet piles and construction method</title><source>esp@cenet</source><creator>ZHANG CHENGLIN ; DENG WEN ; ZHOU JIE ; ZHANG XINGCHENG ; LI BO ; WU YINBAO ; QIAN WEIPING ; WAN MENG ; ZHANG LIWEI ; SUN YANBO ; CHEN DAN ; LIU QUANWEN ; LIU KANG ; TU YOULIANG ; ZHANG JIA ; WEN JINGHUA</creator><creatorcontrib>ZHANG CHENGLIN ; DENG WEN ; ZHOU JIE ; ZHANG XINGCHENG ; LI BO ; WU YINBAO ; QIAN WEIPING ; WAN MENG ; ZHANG LIWEI ; SUN YANBO ; CHEN DAN ; LIU QUANWEN ; LIU KANG ; TU YOULIANG ; ZHANG JIA ; WEN JINGHUA</creatorcontrib><description>The invention provides a cofferdam structure combining cement-soil mixing piles with steel sheet piles and a construction method. The cofferdam structure comprises a plurality of drill holes formed in an island, the cement-soil mixing piles are poured in the drill holes, the steel sheet piles are inserted in the cement-soil mixing piles, the multiple steel sheet piles are connected to form a closed space, and a supporting system used for stabilizing is arranged in the closed space; the drill holes comprise a plurality of first hole sites and second hole sites which are arranged at intervals, and overlapping areas are arranged between the first hole sites and the second hole sites. The structure is compact, the problem that pile sinking is difficult during hard geological construction can be solved, the overall construction efficiency is greatly improved, the construction safety risk is reduced, water and soil are effectively prevented in the construction process, and the construction quality is better. 本发明提供一</description><language>chi ; eng</language><subject>EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; SOIL SHIFTING ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>2022</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20221122&amp;DB=EPODOC&amp;CC=CN&amp;NR=115369899A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25543,76294</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20221122&amp;DB=EPODOC&amp;CC=CN&amp;NR=115369899A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>ZHANG CHENGLIN</creatorcontrib><creatorcontrib>DENG WEN</creatorcontrib><creatorcontrib>ZHOU JIE</creatorcontrib><creatorcontrib>ZHANG XINGCHENG</creatorcontrib><creatorcontrib>LI BO</creatorcontrib><creatorcontrib>WU YINBAO</creatorcontrib><creatorcontrib>QIAN WEIPING</creatorcontrib><creatorcontrib>WAN MENG</creatorcontrib><creatorcontrib>ZHANG LIWEI</creatorcontrib><creatorcontrib>SUN YANBO</creatorcontrib><creatorcontrib>CHEN DAN</creatorcontrib><creatorcontrib>LIU QUANWEN</creatorcontrib><creatorcontrib>LIU KANG</creatorcontrib><creatorcontrib>TU YOULIANG</creatorcontrib><creatorcontrib>ZHANG JIA</creatorcontrib><creatorcontrib>WEN JINGHUA</creatorcontrib><title>Cofferdam structure with cement mixing piles combined with steel sheet piles and construction method</title><description>The invention provides a cofferdam structure combining cement-soil mixing piles with steel sheet piles and a construction method. The cofferdam structure comprises a plurality of drill holes formed in an island, the cement-soil mixing piles are poured in the drill holes, the steel sheet piles are inserted in the cement-soil mixing piles, the multiple steel sheet piles are connected to form a closed space, and a supporting system used for stabilizing is arranged in the closed space; the drill holes comprise a plurality of first hole sites and second hole sites which are arranged at intervals, and overlapping areas are arranged between the first hole sites and the second hole sites. The structure is compact, the problem that pile sinking is difficult during hard geological construction can be solved, the overall construction efficiency is greatly improved, the construction safety risk is reduced, water and soil are effectively prevented in the construction process, and the construction quality is better. 本发明提供一</description><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>SOIL SHIFTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2022</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNzLEKwjAUheEuDqK-w_UBHEpR7FiC4uTkXmJyagPJTUhu0cdXaB_A6Qz_x1lXVsVhQLY6UJE8GZky6O1kJIMAFgru4_hFyXkUMjE8HcPOogjgqYyALF2z_Rmen1xkCpAx2m21GrQv2C27qfbXy0PdDkixR0nagCG9utf1sTm157btmn_MFzpOP5k</recordid><startdate>20221122</startdate><enddate>20221122</enddate><creator>ZHANG CHENGLIN</creator><creator>DENG WEN</creator><creator>ZHOU JIE</creator><creator>ZHANG XINGCHENG</creator><creator>LI BO</creator><creator>WU YINBAO</creator><creator>QIAN WEIPING</creator><creator>WAN MENG</creator><creator>ZHANG LIWEI</creator><creator>SUN YANBO</creator><creator>CHEN DAN</creator><creator>LIU QUANWEN</creator><creator>LIU KANG</creator><creator>TU YOULIANG</creator><creator>ZHANG JIA</creator><creator>WEN JINGHUA</creator><scope>EVB</scope></search><sort><creationdate>20221122</creationdate><title>Cofferdam structure with cement mixing piles combined with steel sheet piles and construction method</title><author>ZHANG CHENGLIN ; DENG WEN ; ZHOU JIE ; ZHANG XINGCHENG ; LI BO ; WU YINBAO ; QIAN WEIPING ; WAN MENG ; ZHANG LIWEI ; SUN YANBO ; CHEN DAN ; LIU QUANWEN ; LIU KANG ; TU YOULIANG ; ZHANG JIA ; WEN JINGHUA</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN115369899A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2022</creationdate><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>SOIL SHIFTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>ZHANG CHENGLIN</creatorcontrib><creatorcontrib>DENG WEN</creatorcontrib><creatorcontrib>ZHOU JIE</creatorcontrib><creatorcontrib>ZHANG XINGCHENG</creatorcontrib><creatorcontrib>LI BO</creatorcontrib><creatorcontrib>WU YINBAO</creatorcontrib><creatorcontrib>QIAN WEIPING</creatorcontrib><creatorcontrib>WAN MENG</creatorcontrib><creatorcontrib>ZHANG LIWEI</creatorcontrib><creatorcontrib>SUN YANBO</creatorcontrib><creatorcontrib>CHEN DAN</creatorcontrib><creatorcontrib>LIU QUANWEN</creatorcontrib><creatorcontrib>LIU KANG</creatorcontrib><creatorcontrib>TU YOULIANG</creatorcontrib><creatorcontrib>ZHANG JIA</creatorcontrib><creatorcontrib>WEN JINGHUA</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>ZHANG CHENGLIN</au><au>DENG WEN</au><au>ZHOU JIE</au><au>ZHANG XINGCHENG</au><au>LI BO</au><au>WU YINBAO</au><au>QIAN WEIPING</au><au>WAN MENG</au><au>ZHANG LIWEI</au><au>SUN YANBO</au><au>CHEN DAN</au><au>LIU QUANWEN</au><au>LIU KANG</au><au>TU YOULIANG</au><au>ZHANG JIA</au><au>WEN JINGHUA</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Cofferdam structure with cement mixing piles combined with steel sheet piles and construction method</title><date>2022-11-22</date><risdate>2022</risdate><abstract>The invention provides a cofferdam structure combining cement-soil mixing piles with steel sheet piles and a construction method. The cofferdam structure comprises a plurality of drill holes formed in an island, the cement-soil mixing piles are poured in the drill holes, the steel sheet piles are inserted in the cement-soil mixing piles, the multiple steel sheet piles are connected to form a closed space, and a supporting system used for stabilizing is arranged in the closed space; the drill holes comprise a plurality of first hole sites and second hole sites which are arranged at intervals, and overlapping areas are arranged between the first hole sites and the second hole sites. The structure is compact, the problem that pile sinking is difficult during hard geological construction can be solved, the overall construction efficiency is greatly improved, the construction safety risk is reduced, water and soil are effectively prevented in the construction process, and the construction quality is better. 本发明提供一</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN115369899A
source esp@cenet
subjects EMBANKMENTS
EXCAVATIONS
FIXED CONSTRUCTIONS
FOUNDATIONS
HYDRAULIC ENGINEERING
SOIL SHIFTING
UNDERGROUND OR UNDERWATER STRUCTURES
title Cofferdam structure with cement mixing piles combined with steel sheet piles and construction method
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-22T00%3A27%3A06IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=ZHANG%20CHENGLIN&rft.date=2022-11-22&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN115369899A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true