Cofferdam structure with cement mixing piles combined with steel sheet piles and construction method
The invention provides a cofferdam structure combining cement-soil mixing piles with steel sheet piles and a construction method. The cofferdam structure comprises a plurality of drill holes formed in an island, the cement-soil mixing piles are poured in the drill holes, the steel sheet piles are in...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | ZHANG CHENGLIN DENG WEN ZHOU JIE ZHANG XINGCHENG LI BO WU YINBAO QIAN WEIPING WAN MENG ZHANG LIWEI SUN YANBO CHEN DAN LIU QUANWEN LIU KANG TU YOULIANG ZHANG JIA WEN JINGHUA |
description | The invention provides a cofferdam structure combining cement-soil mixing piles with steel sheet piles and a construction method. The cofferdam structure comprises a plurality of drill holes formed in an island, the cement-soil mixing piles are poured in the drill holes, the steel sheet piles are inserted in the cement-soil mixing piles, the multiple steel sheet piles are connected to form a closed space, and a supporting system used for stabilizing is arranged in the closed space; the drill holes comprise a plurality of first hole sites and second hole sites which are arranged at intervals, and overlapping areas are arranged between the first hole sites and the second hole sites. The structure is compact, the problem that pile sinking is difficult during hard geological construction can be solved, the overall construction efficiency is greatly improved, the construction safety risk is reduced, water and soil are effectively prevented in the construction process, and the construction quality is better.
本发明提供一 |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN115369899A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN115369899A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN115369899A3</originalsourceid><addsrcrecordid>eNqNzLEKwjAUheEuDqK-w_UBHEpR7FiC4uTkXmJyagPJTUhu0cdXaB_A6Qz_x1lXVsVhQLY6UJE8GZky6O1kJIMAFgru4_hFyXkUMjE8HcPOogjgqYyALF2z_Rmen1xkCpAx2m21GrQv2C27qfbXy0PdDkixR0nagCG9utf1sTm157btmn_MFzpOP5k</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Cofferdam structure with cement mixing piles combined with steel sheet piles and construction method</title><source>esp@cenet</source><creator>ZHANG CHENGLIN ; DENG WEN ; ZHOU JIE ; ZHANG XINGCHENG ; LI BO ; WU YINBAO ; QIAN WEIPING ; WAN MENG ; ZHANG LIWEI ; SUN YANBO ; CHEN DAN ; LIU QUANWEN ; LIU KANG ; TU YOULIANG ; ZHANG JIA ; WEN JINGHUA</creator><creatorcontrib>ZHANG CHENGLIN ; DENG WEN ; ZHOU JIE ; ZHANG XINGCHENG ; LI BO ; WU YINBAO ; QIAN WEIPING ; WAN MENG ; ZHANG LIWEI ; SUN YANBO ; CHEN DAN ; LIU QUANWEN ; LIU KANG ; TU YOULIANG ; ZHANG JIA ; WEN JINGHUA</creatorcontrib><description>The invention provides a cofferdam structure combining cement-soil mixing piles with steel sheet piles and a construction method. The cofferdam structure comprises a plurality of drill holes formed in an island, the cement-soil mixing piles are poured in the drill holes, the steel sheet piles are inserted in the cement-soil mixing piles, the multiple steel sheet piles are connected to form a closed space, and a supporting system used for stabilizing is arranged in the closed space; the drill holes comprise a plurality of first hole sites and second hole sites which are arranged at intervals, and overlapping areas are arranged between the first hole sites and the second hole sites. The structure is compact, the problem that pile sinking is difficult during hard geological construction can be solved, the overall construction efficiency is greatly improved, the construction safety risk is reduced, water and soil are effectively prevented in the construction process, and the construction quality is better.
本发明提供一</description><language>chi ; eng</language><subject>EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; SOIL SHIFTING ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>2022</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20221122&DB=EPODOC&CC=CN&NR=115369899A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25543,76294</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20221122&DB=EPODOC&CC=CN&NR=115369899A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>ZHANG CHENGLIN</creatorcontrib><creatorcontrib>DENG WEN</creatorcontrib><creatorcontrib>ZHOU JIE</creatorcontrib><creatorcontrib>ZHANG XINGCHENG</creatorcontrib><creatorcontrib>LI BO</creatorcontrib><creatorcontrib>WU YINBAO</creatorcontrib><creatorcontrib>QIAN WEIPING</creatorcontrib><creatorcontrib>WAN MENG</creatorcontrib><creatorcontrib>ZHANG LIWEI</creatorcontrib><creatorcontrib>SUN YANBO</creatorcontrib><creatorcontrib>CHEN DAN</creatorcontrib><creatorcontrib>LIU QUANWEN</creatorcontrib><creatorcontrib>LIU KANG</creatorcontrib><creatorcontrib>TU YOULIANG</creatorcontrib><creatorcontrib>ZHANG JIA</creatorcontrib><creatorcontrib>WEN JINGHUA</creatorcontrib><title>Cofferdam structure with cement mixing piles combined with steel sheet piles and construction method</title><description>The invention provides a cofferdam structure combining cement-soil mixing piles with steel sheet piles and a construction method. The cofferdam structure comprises a plurality of drill holes formed in an island, the cement-soil mixing piles are poured in the drill holes, the steel sheet piles are inserted in the cement-soil mixing piles, the multiple steel sheet piles are connected to form a closed space, and a supporting system used for stabilizing is arranged in the closed space; the drill holes comprise a plurality of first hole sites and second hole sites which are arranged at intervals, and overlapping areas are arranged between the first hole sites and the second hole sites. The structure is compact, the problem that pile sinking is difficult during hard geological construction can be solved, the overall construction efficiency is greatly improved, the construction safety risk is reduced, water and soil are effectively prevented in the construction process, and the construction quality is better.
本发明提供一</description><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>SOIL SHIFTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2022</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNzLEKwjAUheEuDqK-w_UBHEpR7FiC4uTkXmJyagPJTUhu0cdXaB_A6Qz_x1lXVsVhQLY6UJE8GZky6O1kJIMAFgru4_hFyXkUMjE8HcPOogjgqYyALF2z_Rmen1xkCpAx2m21GrQv2C27qfbXy0PdDkixR0nagCG9utf1sTm157btmn_MFzpOP5k</recordid><startdate>20221122</startdate><enddate>20221122</enddate><creator>ZHANG CHENGLIN</creator><creator>DENG WEN</creator><creator>ZHOU JIE</creator><creator>ZHANG XINGCHENG</creator><creator>LI BO</creator><creator>WU YINBAO</creator><creator>QIAN WEIPING</creator><creator>WAN MENG</creator><creator>ZHANG LIWEI</creator><creator>SUN YANBO</creator><creator>CHEN DAN</creator><creator>LIU QUANWEN</creator><creator>LIU KANG</creator><creator>TU YOULIANG</creator><creator>ZHANG JIA</creator><creator>WEN JINGHUA</creator><scope>EVB</scope></search><sort><creationdate>20221122</creationdate><title>Cofferdam structure with cement mixing piles combined with steel sheet piles and construction method</title><author>ZHANG CHENGLIN ; DENG WEN ; ZHOU JIE ; ZHANG XINGCHENG ; LI BO ; WU YINBAO ; QIAN WEIPING ; WAN MENG ; ZHANG LIWEI ; SUN YANBO ; CHEN DAN ; LIU QUANWEN ; LIU KANG ; TU YOULIANG ; ZHANG JIA ; WEN JINGHUA</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN115369899A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2022</creationdate><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>SOIL SHIFTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>ZHANG CHENGLIN</creatorcontrib><creatorcontrib>DENG WEN</creatorcontrib><creatorcontrib>ZHOU JIE</creatorcontrib><creatorcontrib>ZHANG XINGCHENG</creatorcontrib><creatorcontrib>LI BO</creatorcontrib><creatorcontrib>WU YINBAO</creatorcontrib><creatorcontrib>QIAN WEIPING</creatorcontrib><creatorcontrib>WAN MENG</creatorcontrib><creatorcontrib>ZHANG LIWEI</creatorcontrib><creatorcontrib>SUN YANBO</creatorcontrib><creatorcontrib>CHEN DAN</creatorcontrib><creatorcontrib>LIU QUANWEN</creatorcontrib><creatorcontrib>LIU KANG</creatorcontrib><creatorcontrib>TU YOULIANG</creatorcontrib><creatorcontrib>ZHANG JIA</creatorcontrib><creatorcontrib>WEN JINGHUA</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>ZHANG CHENGLIN</au><au>DENG WEN</au><au>ZHOU JIE</au><au>ZHANG XINGCHENG</au><au>LI BO</au><au>WU YINBAO</au><au>QIAN WEIPING</au><au>WAN MENG</au><au>ZHANG LIWEI</au><au>SUN YANBO</au><au>CHEN DAN</au><au>LIU QUANWEN</au><au>LIU KANG</au><au>TU YOULIANG</au><au>ZHANG JIA</au><au>WEN JINGHUA</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Cofferdam structure with cement mixing piles combined with steel sheet piles and construction method</title><date>2022-11-22</date><risdate>2022</risdate><abstract>The invention provides a cofferdam structure combining cement-soil mixing piles with steel sheet piles and a construction method. The cofferdam structure comprises a plurality of drill holes formed in an island, the cement-soil mixing piles are poured in the drill holes, the steel sheet piles are inserted in the cement-soil mixing piles, the multiple steel sheet piles are connected to form a closed space, and a supporting system used for stabilizing is arranged in the closed space; the drill holes comprise a plurality of first hole sites and second hole sites which are arranged at intervals, and overlapping areas are arranged between the first hole sites and the second hole sites. The structure is compact, the problem that pile sinking is difficult during hard geological construction can be solved, the overall construction efficiency is greatly improved, the construction safety risk is reduced, water and soil are effectively prevented in the construction process, and the construction quality is better.
本发明提供一</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN115369899A |
source | esp@cenet |
subjects | EMBANKMENTS EXCAVATIONS FIXED CONSTRUCTIONS FOUNDATIONS HYDRAULIC ENGINEERING SOIL SHIFTING UNDERGROUND OR UNDERWATER STRUCTURES |
title | Cofferdam structure with cement mixing piles combined with steel sheet piles and construction method |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-22T00%3A27%3A06IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=ZHANG%20CHENGLIN&rft.date=2022-11-22&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN115369899A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |