Construction method of upside-down type construction joint

The invention relates to the field of building construction, in particular to a construction method of an inverted hanging type construction joint. Comprising the steps that earth excavation is carried out, earth on the lower portion of a wall is lowered to the position 35 d below a foundation plane...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: XIE YANGYANG, WANG MIN, WU AICHENG, LEE YOUNG-GUN, GUAN CONGCONG, ZENG BIN
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator XIE YANGYANG
WANG MIN
WU AICHENG
LEE YOUNG-GUN
GUAN CONGCONG
ZENG BIN
description The invention relates to the field of building construction, in particular to a construction method of an inverted hanging type construction joint. Comprising the steps that earth excavation is carried out, earth on the lower portion of a wall is lowered to the position 35 d below a foundation plane to be constructed, and d is the diameter of the wall; river sand backfilling is conducted, specifically, the over-excavation part in the first step is backfilled with river sand, and the position, 120 mm away from the bottom face of the foundation to be poured, of the top face of the river sand is backfilled; the construction method comprises the following steps: mounting a water stop steel plate, mounting a PVC sleeve, pouring a cushion layer, mounting reinforcing steel bars, mounting a template, pouring concrete, removing the template from the concrete, chiseling a construction joint, excavating earth, removing the cushion layer, an extruded sheet and the PVC sleeve at the construction joint after the earth is e
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN115341582A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN115341582A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN115341582A3</originalsourceid><addsrcrecordid>eNrjZLByzs8rLikqTS7JzM9TyE0tychPUchPUygtKM5MSdVNyS_PUyipLEhVSEZWl5WfmVfCw8CalphTnMoLpbkZFN1cQ5w9dFML8uNTiwsSk1PzUkvinf0MDU2NTQxNLYwcjYlRAwDKsy--</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Construction method of upside-down type construction joint</title><source>esp@cenet</source><creator>XIE YANGYANG ; WANG MIN ; WU AICHENG ; LEE YOUNG-GUN ; GUAN CONGCONG ; ZENG BIN</creator><creatorcontrib>XIE YANGYANG ; WANG MIN ; WU AICHENG ; LEE YOUNG-GUN ; GUAN CONGCONG ; ZENG BIN</creatorcontrib><description>The invention relates to the field of building construction, in particular to a construction method of an inverted hanging type construction joint. Comprising the steps that earth excavation is carried out, earth on the lower portion of a wall is lowered to the position 35 d below a foundation plane to be constructed, and d is the diameter of the wall; river sand backfilling is conducted, specifically, the over-excavation part in the first step is backfilled with river sand, and the position, 120 mm away from the bottom face of the foundation to be poured, of the top face of the river sand is backfilled; the construction method comprises the following steps: mounting a water stop steel plate, mounting a PVC sleeve, pouring a cushion layer, mounting reinforcing steel bars, mounting a template, pouring concrete, removing the template from the concrete, chiseling a construction joint, excavating earth, removing the cushion layer, an extruded sheet and the PVC sleeve at the construction joint after the earth is e</description><language>chi ; eng</language><subject>EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; SOIL SHIFTING ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>2022</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20221115&amp;DB=EPODOC&amp;CC=CN&amp;NR=115341582A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76290</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20221115&amp;DB=EPODOC&amp;CC=CN&amp;NR=115341582A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>XIE YANGYANG</creatorcontrib><creatorcontrib>WANG MIN</creatorcontrib><creatorcontrib>WU AICHENG</creatorcontrib><creatorcontrib>LEE YOUNG-GUN</creatorcontrib><creatorcontrib>GUAN CONGCONG</creatorcontrib><creatorcontrib>ZENG BIN</creatorcontrib><title>Construction method of upside-down type construction joint</title><description>The invention relates to the field of building construction, in particular to a construction method of an inverted hanging type construction joint. Comprising the steps that earth excavation is carried out, earth on the lower portion of a wall is lowered to the position 35 d below a foundation plane to be constructed, and d is the diameter of the wall; river sand backfilling is conducted, specifically, the over-excavation part in the first step is backfilled with river sand, and the position, 120 mm away from the bottom face of the foundation to be poured, of the top face of the river sand is backfilled; the construction method comprises the following steps: mounting a water stop steel plate, mounting a PVC sleeve, pouring a cushion layer, mounting reinforcing steel bars, mounting a template, pouring concrete, removing the template from the concrete, chiseling a construction joint, excavating earth, removing the cushion layer, an extruded sheet and the PVC sleeve at the construction joint after the earth is e</description><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>SOIL SHIFTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2022</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZLByzs8rLikqTS7JzM9TyE0tychPUchPUygtKM5MSdVNyS_PUyipLEhVSEZWl5WfmVfCw8CalphTnMoLpbkZFN1cQ5w9dFML8uNTiwsSk1PzUkvinf0MDU2NTQxNLYwcjYlRAwDKsy--</recordid><startdate>20221115</startdate><enddate>20221115</enddate><creator>XIE YANGYANG</creator><creator>WANG MIN</creator><creator>WU AICHENG</creator><creator>LEE YOUNG-GUN</creator><creator>GUAN CONGCONG</creator><creator>ZENG BIN</creator><scope>EVB</scope></search><sort><creationdate>20221115</creationdate><title>Construction method of upside-down type construction joint</title><author>XIE YANGYANG ; WANG MIN ; WU AICHENG ; LEE YOUNG-GUN ; GUAN CONGCONG ; ZENG BIN</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN115341582A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2022</creationdate><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>SOIL SHIFTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>XIE YANGYANG</creatorcontrib><creatorcontrib>WANG MIN</creatorcontrib><creatorcontrib>WU AICHENG</creatorcontrib><creatorcontrib>LEE YOUNG-GUN</creatorcontrib><creatorcontrib>GUAN CONGCONG</creatorcontrib><creatorcontrib>ZENG BIN</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>XIE YANGYANG</au><au>WANG MIN</au><au>WU AICHENG</au><au>LEE YOUNG-GUN</au><au>GUAN CONGCONG</au><au>ZENG BIN</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Construction method of upside-down type construction joint</title><date>2022-11-15</date><risdate>2022</risdate><abstract>The invention relates to the field of building construction, in particular to a construction method of an inverted hanging type construction joint. Comprising the steps that earth excavation is carried out, earth on the lower portion of a wall is lowered to the position 35 d below a foundation plane to be constructed, and d is the diameter of the wall; river sand backfilling is conducted, specifically, the over-excavation part in the first step is backfilled with river sand, and the position, 120 mm away from the bottom face of the foundation to be poured, of the top face of the river sand is backfilled; the construction method comprises the following steps: mounting a water stop steel plate, mounting a PVC sleeve, pouring a cushion layer, mounting reinforcing steel bars, mounting a template, pouring concrete, removing the template from the concrete, chiseling a construction joint, excavating earth, removing the cushion layer, an extruded sheet and the PVC sleeve at the construction joint after the earth is e</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN115341582A
source esp@cenet
subjects EMBANKMENTS
EXCAVATIONS
FIXED CONSTRUCTIONS
FOUNDATIONS
HYDRAULIC ENGINEERING
SOIL SHIFTING
UNDERGROUND OR UNDERWATER STRUCTURES
title Construction method of upside-down type construction joint
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-31T08%3A36%3A29IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=XIE%20YANGYANG&rft.date=2022-11-15&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN115341582A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true