Construction method of cement-soil continuous wall and mixed slurrying system
A construction method of a cement-soil continuous wall comprises the following steps that firstly, a guide wall is manufactured, specifically, according to a control point and a control axis, the center line of the guide wall is measured and placed, and guide wall construction is conducted; step 2,...
Gespeichert in:
Hauptverfasser: | , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Schreiben Sie den ersten Kommentar!