Grouting system for tunnel and bridge construction

The invention discloses a grouting system for tunnel bridge construction, which comprises a box body, the top of the box body is fixedly connected with a shell, one side of the box body is provided with a stirring structure, and the stirring structure comprises a motor I, a tooth roller, a toothed p...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
1. Verfasser: HUANG ZHIYOU
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator HUANG ZHIYOU
description The invention discloses a grouting system for tunnel bridge construction, which comprises a box body, the top of the box body is fixedly connected with a shell, one side of the box body is provided with a stirring structure, and the stirring structure comprises a motor I, a tooth roller, a toothed plate I, a toothed plate II, a rotating tooth I, a rotating tooth II and a transverse plate; the bottom of the first motor is fixedly connected with one side of the top of the box body, and the output end of the first motor is fixedly connected with a tooth roller. According to the mud jacking system for tunnel and bridge construction, through cooperation of the box body, the bottom plate, the vertical plate, the hook, the hose, the conveying pump, a baffle, a sliding block, a plate body, a bent plate, an electric push rod, an electric valve, a hopper, a shell, a square box, a shell and a stirring structure, a tooth roller drives a first tooth plate and a second tooth plate to rotate, the first tooth plate drives a
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN115182267A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN115182267A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN115182267A3</originalsourceid><addsrcrecordid>eNrjZDByL8ovLcnMS1coriwuSc1VSMsvUigpzctLzVFIzEtRSCrKTElPVUjOzysuKSpNLsnMz-NhYE1LzClO5YXS3AyKbq4hzh66qQX58anFBYnJqXmpJfHOfoaGpoYWRkZm5o7GxKgBAPVRLHc</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Grouting system for tunnel and bridge construction</title><source>esp@cenet</source><creator>HUANG ZHIYOU</creator><creatorcontrib>HUANG ZHIYOU</creatorcontrib><description>The invention discloses a grouting system for tunnel bridge construction, which comprises a box body, the top of the box body is fixedly connected with a shell, one side of the box body is provided with a stirring structure, and the stirring structure comprises a motor I, a tooth roller, a toothed plate I, a toothed plate II, a rotating tooth I, a rotating tooth II and a transverse plate; the bottom of the first motor is fixedly connected with one side of the top of the box body, and the output end of the first motor is fixedly connected with a tooth roller. According to the mud jacking system for tunnel and bridge construction, through cooperation of the box body, the bottom plate, the vertical plate, the hook, the hose, the conveying pump, a baffle, a sliding block, a plate body, a bent plate, an electric push rod, an electric valve, a hopper, a shell, a square box, a shell and a stirring structure, a tooth roller drives a first tooth plate and a second tooth plate to rotate, the first tooth plate drives a</description><language>chi ; eng</language><subject>ASSEMBLY OF BRIDGES ; CLEANING ; CLEANING IN GENERAL ; CONSTRUCTION OF BRIDGES ; CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES ; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER ; DYNAMO-ELECTRIC MACHINES ; ELECTRICITY ; FIXED CONSTRUCTIONS ; GENERATION ; OR VIADUCTS ; PERFORMING OPERATIONS ; PREPARING CLAY ; PREVENTION OF FOULING IN GENERAL ; PRODUCING MIXTURES CONTAINING CLAY OR CEMENTITIOUS MATERIAL,e.g. PLASTER ; TRANSPORTING ; WORKING CEMENT, CLAY, OR STONE</subject><creationdate>2022</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20221014&amp;DB=EPODOC&amp;CC=CN&amp;NR=115182267A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20221014&amp;DB=EPODOC&amp;CC=CN&amp;NR=115182267A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>HUANG ZHIYOU</creatorcontrib><title>Grouting system for tunnel and bridge construction</title><description>The invention discloses a grouting system for tunnel bridge construction, which comprises a box body, the top of the box body is fixedly connected with a shell, one side of the box body is provided with a stirring structure, and the stirring structure comprises a motor I, a tooth roller, a toothed plate I, a toothed plate II, a rotating tooth I, a rotating tooth II and a transverse plate; the bottom of the first motor is fixedly connected with one side of the top of the box body, and the output end of the first motor is fixedly connected with a tooth roller. According to the mud jacking system for tunnel and bridge construction, through cooperation of the box body, the bottom plate, the vertical plate, the hook, the hose, the conveying pump, a baffle, a sliding block, a plate body, a bent plate, an electric push rod, an electric valve, a hopper, a shell, a square box, a shell and a stirring structure, a tooth roller drives a first tooth plate and a second tooth plate to rotate, the first tooth plate drives a</description><subject>ASSEMBLY OF BRIDGES</subject><subject>CLEANING</subject><subject>CLEANING IN GENERAL</subject><subject>CONSTRUCTION OF BRIDGES</subject><subject>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</subject><subject>CONVERSION OR DISTRIBUTION OF ELECTRIC POWER</subject><subject>DYNAMO-ELECTRIC MACHINES</subject><subject>ELECTRICITY</subject><subject>FIXED CONSTRUCTIONS</subject><subject>GENERATION</subject><subject>OR VIADUCTS</subject><subject>PERFORMING OPERATIONS</subject><subject>PREPARING CLAY</subject><subject>PREVENTION OF FOULING IN GENERAL</subject><subject>PRODUCING MIXTURES CONTAINING CLAY OR CEMENTITIOUS MATERIAL,e.g. PLASTER</subject><subject>TRANSPORTING</subject><subject>WORKING CEMENT, CLAY, OR STONE</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2022</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZDByL8ovLcnMS1coriwuSc1VSMsvUigpzctLzVFIzEtRSCrKTElPVUjOzysuKSpNLsnMz-NhYE1LzClO5YXS3AyKbq4hzh66qQX58anFBYnJqXmpJfHOfoaGpoYWRkZm5o7GxKgBAPVRLHc</recordid><startdate>20221014</startdate><enddate>20221014</enddate><creator>HUANG ZHIYOU</creator><scope>EVB</scope></search><sort><creationdate>20221014</creationdate><title>Grouting system for tunnel and bridge construction</title><author>HUANG ZHIYOU</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN115182267A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2022</creationdate><topic>ASSEMBLY OF BRIDGES</topic><topic>CLEANING</topic><topic>CLEANING IN GENERAL</topic><topic>CONSTRUCTION OF BRIDGES</topic><topic>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</topic><topic>CONVERSION OR DISTRIBUTION OF ELECTRIC POWER</topic><topic>DYNAMO-ELECTRIC MACHINES</topic><topic>ELECTRICITY</topic><topic>FIXED CONSTRUCTIONS</topic><topic>GENERATION</topic><topic>OR VIADUCTS</topic><topic>PERFORMING OPERATIONS</topic><topic>PREPARING CLAY</topic><topic>PREVENTION OF FOULING IN GENERAL</topic><topic>PRODUCING MIXTURES CONTAINING CLAY OR CEMENTITIOUS MATERIAL,e.g. PLASTER</topic><topic>TRANSPORTING</topic><topic>WORKING CEMENT, CLAY, OR STONE</topic><toplevel>online_resources</toplevel><creatorcontrib>HUANG ZHIYOU</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>HUANG ZHIYOU</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Grouting system for tunnel and bridge construction</title><date>2022-10-14</date><risdate>2022</risdate><abstract>The invention discloses a grouting system for tunnel bridge construction, which comprises a box body, the top of the box body is fixedly connected with a shell, one side of the box body is provided with a stirring structure, and the stirring structure comprises a motor I, a tooth roller, a toothed plate I, a toothed plate II, a rotating tooth I, a rotating tooth II and a transverse plate; the bottom of the first motor is fixedly connected with one side of the top of the box body, and the output end of the first motor is fixedly connected with a tooth roller. According to the mud jacking system for tunnel and bridge construction, through cooperation of the box body, the bottom plate, the vertical plate, the hook, the hose, the conveying pump, a baffle, a sliding block, a plate body, a bent plate, an electric push rod, an electric valve, a hopper, a shell, a square box, a shell and a stirring structure, a tooth roller drives a first tooth plate and a second tooth plate to rotate, the first tooth plate drives a</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN115182267A
source esp@cenet
subjects ASSEMBLY OF BRIDGES
CLEANING
CLEANING IN GENERAL
CONSTRUCTION OF BRIDGES
CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
DYNAMO-ELECTRIC MACHINES
ELECTRICITY
FIXED CONSTRUCTIONS
GENERATION
OR VIADUCTS
PERFORMING OPERATIONS
PREPARING CLAY
PREVENTION OF FOULING IN GENERAL
PRODUCING MIXTURES CONTAINING CLAY OR CEMENTITIOUS MATERIAL,e.g. PLASTER
TRANSPORTING
WORKING CEMENT, CLAY, OR STONE
title Grouting system for tunnel and bridge construction
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-26T06%3A05%3A58IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=HUANG%20ZHIYOU&rft.date=2022-10-14&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN115182267A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true