Permanent and temporary combined roundabout tunnel structure for tunnel to pass through karst cave and construction method
The invention provides a permanent and temporary combined roundabout tunnel structure for a tunnel to pass through a karst cave and a construction method, and belongs to the technical field of tunnel engineering. One end of the roundabout tunnel is communicated with a starting section, the other end...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | LIU BAOLIN CAI ZHIYAN ZHU XIAOBING WANG QIU TIAN PAN CAO LINWEI LIU LECHUAN YU MAOCHUN KUANG WENTAO LI LAOSAN |
description | The invention provides a permanent and temporary combined roundabout tunnel structure for a tunnel to pass through a karst cave and a construction method, and belongs to the technical field of tunnel engineering. One end of the roundabout tunnel is communicated with a starting section, the other end of the roundabout tunnel penetrates through the upstream of the karst cave and then extends to a terminal section, a tunnel bottom box culvert communicated with the roundabout tunnel is arranged in the terminal section, the other end of the tunnel bottom box culvert is communicated with the downstream of the karst cave, and a water passing hole is formed in the side, facing the upstream of the karst cave, of the roundabout tunnel in the karst cave. And a plug is arranged in the part, between the upstream and the starting section of the karst cave, of the roundabout tunnel. A roundabout tunnel is arranged on the outer side of the karst cave to serve as a temporary construction channel, a front tunnel construction w |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN115163108A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN115163108A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN115163108A3</originalsourceid><addsrcrecordid>eNqNjLsKwkAQRdNYiPoP4wcILkGxlaBYiYV9mOxOTDA7s-zOCvr1io_e6sLhnDsuHieKHplYAdmBkg8SMd7Bim96JgdRMjtsJCtoZqYBksZsNUeCVuIPqkDAlEC7V3Dp4IoxKVi80fvYCn-yXhg8aSduWoxaHBLNvjsp5vvduTosKEhNKaAlJq2rozErsy7NcrMt_3GeFlFIOw</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Permanent and temporary combined roundabout tunnel structure for tunnel to pass through karst cave and construction method</title><source>esp@cenet</source><creator>LIU BAOLIN ; CAI ZHIYAN ; ZHU XIAOBING ; WANG QIU ; TIAN PAN ; CAO LINWEI ; LIU LECHUAN ; YU MAOCHUN ; KUANG WENTAO ; LI LAOSAN</creator><creatorcontrib>LIU BAOLIN ; CAI ZHIYAN ; ZHU XIAOBING ; WANG QIU ; TIAN PAN ; CAO LINWEI ; LIU LECHUAN ; YU MAOCHUN ; KUANG WENTAO ; LI LAOSAN</creatorcontrib><description>The invention provides a permanent and temporary combined roundabout tunnel structure for a tunnel to pass through a karst cave and a construction method, and belongs to the technical field of tunnel engineering. One end of the roundabout tunnel is communicated with a starting section, the other end of the roundabout tunnel penetrates through the upstream of the karst cave and then extends to a terminal section, a tunnel bottom box culvert communicated with the roundabout tunnel is arranged in the terminal section, the other end of the tunnel bottom box culvert is communicated with the downstream of the karst cave, and a water passing hole is formed in the side, facing the upstream of the karst cave, of the roundabout tunnel in the karst cave. And a plug is arranged in the part, between the upstream and the starting section of the karst cave, of the roundabout tunnel. A roundabout tunnel is arranged on the outer side of the karst cave to serve as a temporary construction channel, a front tunnel construction w</description><language>chi ; eng</language><subject>EARTH DRILLING ; FIXED CONSTRUCTIONS ; GALLERIES ; LARGE UNDERGROUND CHAMBERS ; MINING ; SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, ORDRAINING IN OR OF MINES OR TUNNELS ; SHAFTS ; TUNNELS</subject><creationdate>2022</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20221011&DB=EPODOC&CC=CN&NR=115163108A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76289</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20221011&DB=EPODOC&CC=CN&NR=115163108A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>LIU BAOLIN</creatorcontrib><creatorcontrib>CAI ZHIYAN</creatorcontrib><creatorcontrib>ZHU XIAOBING</creatorcontrib><creatorcontrib>WANG QIU</creatorcontrib><creatorcontrib>TIAN PAN</creatorcontrib><creatorcontrib>CAO LINWEI</creatorcontrib><creatorcontrib>LIU LECHUAN</creatorcontrib><creatorcontrib>YU MAOCHUN</creatorcontrib><creatorcontrib>KUANG WENTAO</creatorcontrib><creatorcontrib>LI LAOSAN</creatorcontrib><title>Permanent and temporary combined roundabout tunnel structure for tunnel to pass through karst cave and construction method</title><description>The invention provides a permanent and temporary combined roundabout tunnel structure for a tunnel to pass through a karst cave and a construction method, and belongs to the technical field of tunnel engineering. One end of the roundabout tunnel is communicated with a starting section, the other end of the roundabout tunnel penetrates through the upstream of the karst cave and then extends to a terminal section, a tunnel bottom box culvert communicated with the roundabout tunnel is arranged in the terminal section, the other end of the tunnel bottom box culvert is communicated with the downstream of the karst cave, and a water passing hole is formed in the side, facing the upstream of the karst cave, of the roundabout tunnel in the karst cave. And a plug is arranged in the part, between the upstream and the starting section of the karst cave, of the roundabout tunnel. A roundabout tunnel is arranged on the outer side of the karst cave to serve as a temporary construction channel, a front tunnel construction w</description><subject>EARTH DRILLING</subject><subject>FIXED CONSTRUCTIONS</subject><subject>GALLERIES</subject><subject>LARGE UNDERGROUND CHAMBERS</subject><subject>MINING</subject><subject>SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, ORDRAINING IN OR OF MINES OR TUNNELS</subject><subject>SHAFTS</subject><subject>TUNNELS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2022</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNjLsKwkAQRdNYiPoP4wcILkGxlaBYiYV9mOxOTDA7s-zOCvr1io_e6sLhnDsuHieKHplYAdmBkg8SMd7Bim96JgdRMjtsJCtoZqYBksZsNUeCVuIPqkDAlEC7V3Dp4IoxKVi80fvYCn-yXhg8aSduWoxaHBLNvjsp5vvduTosKEhNKaAlJq2rozErsy7NcrMt_3GeFlFIOw</recordid><startdate>20221011</startdate><enddate>20221011</enddate><creator>LIU BAOLIN</creator><creator>CAI ZHIYAN</creator><creator>ZHU XIAOBING</creator><creator>WANG QIU</creator><creator>TIAN PAN</creator><creator>CAO LINWEI</creator><creator>LIU LECHUAN</creator><creator>YU MAOCHUN</creator><creator>KUANG WENTAO</creator><creator>LI LAOSAN</creator><scope>EVB</scope></search><sort><creationdate>20221011</creationdate><title>Permanent and temporary combined roundabout tunnel structure for tunnel to pass through karst cave and construction method</title><author>LIU BAOLIN ; CAI ZHIYAN ; ZHU XIAOBING ; WANG QIU ; TIAN PAN ; CAO LINWEI ; LIU LECHUAN ; YU MAOCHUN ; KUANG WENTAO ; LI LAOSAN</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN115163108A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2022</creationdate><topic>EARTH DRILLING</topic><topic>FIXED CONSTRUCTIONS</topic><topic>GALLERIES</topic><topic>LARGE UNDERGROUND CHAMBERS</topic><topic>MINING</topic><topic>SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, ORDRAINING IN OR OF MINES OR TUNNELS</topic><topic>SHAFTS</topic><topic>TUNNELS</topic><toplevel>online_resources</toplevel><creatorcontrib>LIU BAOLIN</creatorcontrib><creatorcontrib>CAI ZHIYAN</creatorcontrib><creatorcontrib>ZHU XIAOBING</creatorcontrib><creatorcontrib>WANG QIU</creatorcontrib><creatorcontrib>TIAN PAN</creatorcontrib><creatorcontrib>CAO LINWEI</creatorcontrib><creatorcontrib>LIU LECHUAN</creatorcontrib><creatorcontrib>YU MAOCHUN</creatorcontrib><creatorcontrib>KUANG WENTAO</creatorcontrib><creatorcontrib>LI LAOSAN</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>LIU BAOLIN</au><au>CAI ZHIYAN</au><au>ZHU XIAOBING</au><au>WANG QIU</au><au>TIAN PAN</au><au>CAO LINWEI</au><au>LIU LECHUAN</au><au>YU MAOCHUN</au><au>KUANG WENTAO</au><au>LI LAOSAN</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Permanent and temporary combined roundabout tunnel structure for tunnel to pass through karst cave and construction method</title><date>2022-10-11</date><risdate>2022</risdate><abstract>The invention provides a permanent and temporary combined roundabout tunnel structure for a tunnel to pass through a karst cave and a construction method, and belongs to the technical field of tunnel engineering. One end of the roundabout tunnel is communicated with a starting section, the other end of the roundabout tunnel penetrates through the upstream of the karst cave and then extends to a terminal section, a tunnel bottom box culvert communicated with the roundabout tunnel is arranged in the terminal section, the other end of the tunnel bottom box culvert is communicated with the downstream of the karst cave, and a water passing hole is formed in the side, facing the upstream of the karst cave, of the roundabout tunnel in the karst cave. And a plug is arranged in the part, between the upstream and the starting section of the karst cave, of the roundabout tunnel. A roundabout tunnel is arranged on the outer side of the karst cave to serve as a temporary construction channel, a front tunnel construction w</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN115163108A |
source | esp@cenet |
subjects | EARTH DRILLING FIXED CONSTRUCTIONS GALLERIES LARGE UNDERGROUND CHAMBERS MINING SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, ORDRAINING IN OR OF MINES OR TUNNELS SHAFTS TUNNELS |
title | Permanent and temporary combined roundabout tunnel structure for tunnel to pass through karst cave and construction method |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-08T23%3A47%3A48IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=LIU%20BAOLIN&rft.date=2022-10-11&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN115163108A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |