Steel hanging box

According to the steel hanging box, the connecting assembly and the pre-tightening assembly are arranged on the steel hanging box formwork, the steel hanging box is fixed through cooperation of the connecting assembly and the pre-tightening assembly, and compared with the prior art, the steel hangin...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: ZHANG ZHONGHE, YUE ZHIGUANG, TAN BITAO, WANG QIAOLI, HE HONGJUAN, HUANG ZONGQUAN
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator ZHANG ZHONGHE
YUE ZHIGUANG
TAN BITAO
WANG QIAOLI
HE HONGJUAN
HUANG ZONGQUAN
description According to the steel hanging box, the connecting assembly and the pre-tightening assembly are arranged on the steel hanging box formwork, the steel hanging box is fixed through cooperation of the connecting assembly and the pre-tightening assembly, and compared with the prior art, the steel hanging box is easy to mount or dismount, the construction efficiency is improved, meanwhile, the working environment is improved, and the construction cost is effectively reduced. 本申请涉及一种钢吊箱,通过在钢吊箱模板上设置连接组件和预紧组件,在连接组件和预紧组件的配合固定钢吊箱,相较于现有技术,该钢吊箱安装或拆除操作简单,提高了施工效率,同时改善了作业环境,有效的降低了施工成本。
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN115162188A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN115162188A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN115162188A3</originalsourceid><addsrcrecordid>eNrjZBAMLklNzVHISMxLz8xLV0jKr-BhYE1LzClO5YXS3AyKbq4hzh66qQX58anFBYnJqXmpJfHOfoaGpoZmRoYWFo7GxKgBALkaH1w</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Steel hanging box</title><source>esp@cenet</source><creator>ZHANG ZHONGHE ; YUE ZHIGUANG ; TAN BITAO ; WANG QIAOLI ; HE HONGJUAN ; HUANG ZONGQUAN</creator><creatorcontrib>ZHANG ZHONGHE ; YUE ZHIGUANG ; TAN BITAO ; WANG QIAOLI ; HE HONGJUAN ; HUANG ZONGQUAN</creatorcontrib><description>According to the steel hanging box, the connecting assembly and the pre-tightening assembly are arranged on the steel hanging box formwork, the steel hanging box is fixed through cooperation of the connecting assembly and the pre-tightening assembly, and compared with the prior art, the steel hanging box is easy to mount or dismount, the construction efficiency is improved, meanwhile, the working environment is improved, and the construction cost is effectively reduced. 本申请涉及一种钢吊箱,通过在钢吊箱模板上设置连接组件和预紧组件,在连接组件和预紧组件的配合固定钢吊箱,相较于现有技术,该钢吊箱安装或拆除操作简单,提高了施工效率,同时改善了作业环境,有效的降低了施工成本。</description><language>chi ; eng</language><subject>ASSEMBLY OF BRIDGES ; CONSTRUCTION OF BRIDGES ; CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES ; FIXED CONSTRUCTIONS ; OR VIADUCTS</subject><creationdate>2022</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20221011&amp;DB=EPODOC&amp;CC=CN&amp;NR=115162188A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76290</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20221011&amp;DB=EPODOC&amp;CC=CN&amp;NR=115162188A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>ZHANG ZHONGHE</creatorcontrib><creatorcontrib>YUE ZHIGUANG</creatorcontrib><creatorcontrib>TAN BITAO</creatorcontrib><creatorcontrib>WANG QIAOLI</creatorcontrib><creatorcontrib>HE HONGJUAN</creatorcontrib><creatorcontrib>HUANG ZONGQUAN</creatorcontrib><title>Steel hanging box</title><description>According to the steel hanging box, the connecting assembly and the pre-tightening assembly are arranged on the steel hanging box formwork, the steel hanging box is fixed through cooperation of the connecting assembly and the pre-tightening assembly, and compared with the prior art, the steel hanging box is easy to mount or dismount, the construction efficiency is improved, meanwhile, the working environment is improved, and the construction cost is effectively reduced. 本申请涉及一种钢吊箱,通过在钢吊箱模板上设置连接组件和预紧组件,在连接组件和预紧组件的配合固定钢吊箱,相较于现有技术,该钢吊箱安装或拆除操作简单,提高了施工效率,同时改善了作业环境,有效的降低了施工成本。</description><subject>ASSEMBLY OF BRIDGES</subject><subject>CONSTRUCTION OF BRIDGES</subject><subject>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</subject><subject>FIXED CONSTRUCTIONS</subject><subject>OR VIADUCTS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2022</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZBAMLklNzVHISMxLz8xLV0jKr-BhYE1LzClO5YXS3AyKbq4hzh66qQX58anFBYnJqXmpJfHOfoaGpoZmRoYWFo7GxKgBALkaH1w</recordid><startdate>20221011</startdate><enddate>20221011</enddate><creator>ZHANG ZHONGHE</creator><creator>YUE ZHIGUANG</creator><creator>TAN BITAO</creator><creator>WANG QIAOLI</creator><creator>HE HONGJUAN</creator><creator>HUANG ZONGQUAN</creator><scope>EVB</scope></search><sort><creationdate>20221011</creationdate><title>Steel hanging box</title><author>ZHANG ZHONGHE ; YUE ZHIGUANG ; TAN BITAO ; WANG QIAOLI ; HE HONGJUAN ; HUANG ZONGQUAN</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN115162188A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2022</creationdate><topic>ASSEMBLY OF BRIDGES</topic><topic>CONSTRUCTION OF BRIDGES</topic><topic>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</topic><topic>FIXED CONSTRUCTIONS</topic><topic>OR VIADUCTS</topic><toplevel>online_resources</toplevel><creatorcontrib>ZHANG ZHONGHE</creatorcontrib><creatorcontrib>YUE ZHIGUANG</creatorcontrib><creatorcontrib>TAN BITAO</creatorcontrib><creatorcontrib>WANG QIAOLI</creatorcontrib><creatorcontrib>HE HONGJUAN</creatorcontrib><creatorcontrib>HUANG ZONGQUAN</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>ZHANG ZHONGHE</au><au>YUE ZHIGUANG</au><au>TAN BITAO</au><au>WANG QIAOLI</au><au>HE HONGJUAN</au><au>HUANG ZONGQUAN</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Steel hanging box</title><date>2022-10-11</date><risdate>2022</risdate><abstract>According to the steel hanging box, the connecting assembly and the pre-tightening assembly are arranged on the steel hanging box formwork, the steel hanging box is fixed through cooperation of the connecting assembly and the pre-tightening assembly, and compared with the prior art, the steel hanging box is easy to mount or dismount, the construction efficiency is improved, meanwhile, the working environment is improved, and the construction cost is effectively reduced. 本申请涉及一种钢吊箱,通过在钢吊箱模板上设置连接组件和预紧组件,在连接组件和预紧组件的配合固定钢吊箱,相较于现有技术,该钢吊箱安装或拆除操作简单,提高了施工效率,同时改善了作业环境,有效的降低了施工成本。</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN115162188A
source esp@cenet
subjects ASSEMBLY OF BRIDGES
CONSTRUCTION OF BRIDGES
CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
FIXED CONSTRUCTIONS
OR VIADUCTS
title Steel hanging box
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-03T12%3A24%3A31IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=ZHANG%20ZHONGHE&rft.date=2022-10-11&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN115162188A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true