Installation method for circular ring steel truss of experimental building

The invention discloses a mounting method for a circular ring steel truss of an experimental building. The mounting method comprises the following steps: step 1, mounting a supporting column; 2, mounting a main truss: firstly hoisting an in-place lower chord truss, hoisting an in-place upper chord t...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: WAN YONGKUAN, SHI JING, JIA JIAMING, SHIRASAWA, LIU CHEN, WU JIACHUAN, GAO ZHIXIAN, SUN PENGFEI, WANG FANG, ZHANG HONGWEI, CAI JINZHI, WANG XIAOQIANG, ZHU CHUNFANG
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator WAN YONGKUAN
SHI JING
JIA JIAMING
SHIRASAWA
LIU CHEN
WU JIACHUAN
GAO ZHIXIAN
SUN PENGFEI
WANG FANG
ZHANG HONGWEI
CAI JINZHI
WANG XIAOQIANG
ZHU CHUNFANG
description The invention discloses a mounting method for a circular ring steel truss of an experimental building. The mounting method comprises the following steps: step 1, mounting a supporting column; 2, mounting a main truss: firstly hoisting an in-place lower chord truss, hoisting an in-place upper chord truss, and then mounting diagonal web members; 3, inner ring truss installation: firstly hoisting the in-place lower inner ring truss, hoisting the in-place upper inner ring truss, and then installing diagonal web members; 4, steel beams are installed; 5, outer ring truss installation, specifically, one hoisting unit of the lower outer ring truss is hoisted in place, then a main beam on the lower outer ring truss is temporarily connected with the main truss, and the other hoisting unit is hoisted; an upper outer ring truss is hoisted, and the upper outer ring truss is temporarily connected with the short columns, the main beams on the upper outer ring truss and the main truss; and finally, diagonal web members betwe
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN115110640A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN115110640A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN115110640A3</originalsourceid><addsrcrecordid>eNqNyz0OwjAMQOEsDKhwB3OASo342VEFAgYm9iqkDkRyk8h2JI5PBw7A9JbvLc3tmkQdkdOYE0yo7zxCyAw-sq_kGDimF4giEihXEcgB8FOQ44RpXuFZI40zWplFcCS4_rUxm_Pp0V9aLHlAKc5jQh36u7V7a7vDrjtu_zFfZGc1hQ</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Installation method for circular ring steel truss of experimental building</title><source>esp@cenet</source><creator>WAN YONGKUAN ; SHI JING ; JIA JIAMING ; SHIRASAWA ; LIU CHEN ; WU JIACHUAN ; GAO ZHIXIAN ; SUN PENGFEI ; WANG FANG ; ZHANG HONGWEI ; CAI JINZHI ; WANG XIAOQIANG ; ZHU CHUNFANG</creator><creatorcontrib>WAN YONGKUAN ; SHI JING ; JIA JIAMING ; SHIRASAWA ; LIU CHEN ; WU JIACHUAN ; GAO ZHIXIAN ; SUN PENGFEI ; WANG FANG ; ZHANG HONGWEI ; CAI JINZHI ; WANG XIAOQIANG ; ZHU CHUNFANG</creatorcontrib><description>The invention discloses a mounting method for a circular ring steel truss of an experimental building. The mounting method comprises the following steps: step 1, mounting a supporting column; 2, mounting a main truss: firstly hoisting an in-place lower chord truss, hoisting an in-place upper chord truss, and then mounting diagonal web members; 3, inner ring truss installation: firstly hoisting the in-place lower inner ring truss, hoisting the in-place upper inner ring truss, and then installing diagonal web members; 4, steel beams are installed; 5, outer ring truss installation, specifically, one hoisting unit of the lower outer ring truss is hoisted in place, then a main beam on the lower outer ring truss is temporarily connected with the main truss, and the other hoisting unit is hoisted; an upper outer ring truss is hoisted, and the upper outer ring truss is temporarily connected with the short columns, the main beams on the upper outer ring truss and the main truss; and finally, diagonal web members betwe</description><language>chi ; eng</language><subject>BUILDING ; CEILINGS ; FIXED CONSTRUCTIONS ; FLOORS ; GENERAL BUILDING CONSTRUCTIONS ; INSULATION OR OTHER PROTECTION OF BUILDINGS ; ROOFS ; WALLS, e.g. PARTITIONS</subject><creationdate>2022</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20220927&amp;DB=EPODOC&amp;CC=CN&amp;NR=115110640A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25555,76308</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20220927&amp;DB=EPODOC&amp;CC=CN&amp;NR=115110640A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>WAN YONGKUAN</creatorcontrib><creatorcontrib>SHI JING</creatorcontrib><creatorcontrib>JIA JIAMING</creatorcontrib><creatorcontrib>SHIRASAWA</creatorcontrib><creatorcontrib>LIU CHEN</creatorcontrib><creatorcontrib>WU JIACHUAN</creatorcontrib><creatorcontrib>GAO ZHIXIAN</creatorcontrib><creatorcontrib>SUN PENGFEI</creatorcontrib><creatorcontrib>WANG FANG</creatorcontrib><creatorcontrib>ZHANG HONGWEI</creatorcontrib><creatorcontrib>CAI JINZHI</creatorcontrib><creatorcontrib>WANG XIAOQIANG</creatorcontrib><creatorcontrib>ZHU CHUNFANG</creatorcontrib><title>Installation method for circular ring steel truss of experimental building</title><description>The invention discloses a mounting method for a circular ring steel truss of an experimental building. The mounting method comprises the following steps: step 1, mounting a supporting column; 2, mounting a main truss: firstly hoisting an in-place lower chord truss, hoisting an in-place upper chord truss, and then mounting diagonal web members; 3, inner ring truss installation: firstly hoisting the in-place lower inner ring truss, hoisting the in-place upper inner ring truss, and then installing diagonal web members; 4, steel beams are installed; 5, outer ring truss installation, specifically, one hoisting unit of the lower outer ring truss is hoisted in place, then a main beam on the lower outer ring truss is temporarily connected with the main truss, and the other hoisting unit is hoisted; an upper outer ring truss is hoisted, and the upper outer ring truss is temporarily connected with the short columns, the main beams on the upper outer ring truss and the main truss; and finally, diagonal web members betwe</description><subject>BUILDING</subject><subject>CEILINGS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FLOORS</subject><subject>GENERAL BUILDING CONSTRUCTIONS</subject><subject>INSULATION OR OTHER PROTECTION OF BUILDINGS</subject><subject>ROOFS</subject><subject>WALLS, e.g. PARTITIONS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2022</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNyz0OwjAMQOEsDKhwB3OASo342VEFAgYm9iqkDkRyk8h2JI5PBw7A9JbvLc3tmkQdkdOYE0yo7zxCyAw-sq_kGDimF4giEihXEcgB8FOQ44RpXuFZI40zWplFcCS4_rUxm_Pp0V9aLHlAKc5jQh36u7V7a7vDrjtu_zFfZGc1hQ</recordid><startdate>20220927</startdate><enddate>20220927</enddate><creator>WAN YONGKUAN</creator><creator>SHI JING</creator><creator>JIA JIAMING</creator><creator>SHIRASAWA</creator><creator>LIU CHEN</creator><creator>WU JIACHUAN</creator><creator>GAO ZHIXIAN</creator><creator>SUN PENGFEI</creator><creator>WANG FANG</creator><creator>ZHANG HONGWEI</creator><creator>CAI JINZHI</creator><creator>WANG XIAOQIANG</creator><creator>ZHU CHUNFANG</creator><scope>EVB</scope></search><sort><creationdate>20220927</creationdate><title>Installation method for circular ring steel truss of experimental building</title><author>WAN YONGKUAN ; SHI JING ; JIA JIAMING ; SHIRASAWA ; LIU CHEN ; WU JIACHUAN ; GAO ZHIXIAN ; SUN PENGFEI ; WANG FANG ; ZHANG HONGWEI ; CAI JINZHI ; WANG XIAOQIANG ; ZHU CHUNFANG</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN115110640A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2022</creationdate><topic>BUILDING</topic><topic>CEILINGS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FLOORS</topic><topic>GENERAL BUILDING CONSTRUCTIONS</topic><topic>INSULATION OR OTHER PROTECTION OF BUILDINGS</topic><topic>ROOFS</topic><topic>WALLS, e.g. PARTITIONS</topic><toplevel>online_resources</toplevel><creatorcontrib>WAN YONGKUAN</creatorcontrib><creatorcontrib>SHI JING</creatorcontrib><creatorcontrib>JIA JIAMING</creatorcontrib><creatorcontrib>SHIRASAWA</creatorcontrib><creatorcontrib>LIU CHEN</creatorcontrib><creatorcontrib>WU JIACHUAN</creatorcontrib><creatorcontrib>GAO ZHIXIAN</creatorcontrib><creatorcontrib>SUN PENGFEI</creatorcontrib><creatorcontrib>WANG FANG</creatorcontrib><creatorcontrib>ZHANG HONGWEI</creatorcontrib><creatorcontrib>CAI JINZHI</creatorcontrib><creatorcontrib>WANG XIAOQIANG</creatorcontrib><creatorcontrib>ZHU CHUNFANG</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>WAN YONGKUAN</au><au>SHI JING</au><au>JIA JIAMING</au><au>SHIRASAWA</au><au>LIU CHEN</au><au>WU JIACHUAN</au><au>GAO ZHIXIAN</au><au>SUN PENGFEI</au><au>WANG FANG</au><au>ZHANG HONGWEI</au><au>CAI JINZHI</au><au>WANG XIAOQIANG</au><au>ZHU CHUNFANG</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Installation method for circular ring steel truss of experimental building</title><date>2022-09-27</date><risdate>2022</risdate><abstract>The invention discloses a mounting method for a circular ring steel truss of an experimental building. The mounting method comprises the following steps: step 1, mounting a supporting column; 2, mounting a main truss: firstly hoisting an in-place lower chord truss, hoisting an in-place upper chord truss, and then mounting diagonal web members; 3, inner ring truss installation: firstly hoisting the in-place lower inner ring truss, hoisting the in-place upper inner ring truss, and then installing diagonal web members; 4, steel beams are installed; 5, outer ring truss installation, specifically, one hoisting unit of the lower outer ring truss is hoisted in place, then a main beam on the lower outer ring truss is temporarily connected with the main truss, and the other hoisting unit is hoisted; an upper outer ring truss is hoisted, and the upper outer ring truss is temporarily connected with the short columns, the main beams on the upper outer ring truss and the main truss; and finally, diagonal web members betwe</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN115110640A
source esp@cenet
subjects BUILDING
CEILINGS
FIXED CONSTRUCTIONS
FLOORS
GENERAL BUILDING CONSTRUCTIONS
INSULATION OR OTHER PROTECTION OF BUILDINGS
ROOFS
WALLS, e.g. PARTITIONS
title Installation method for circular ring steel truss of experimental building
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-14T22%3A14%3A59IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=WAN%20YONGKUAN&rft.date=2022-09-27&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN115110640A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true