Method for predicting coke boulder yield
The invention discloses a method for predicting coke boulder yield. The coke boulder yield is predicted according to the following formula: coke boulder yield =-6 * Vdaf-4. 5 * Wn + 50 * Dt + 7.5 * Gn-48 * Kn + 4 * Yn + 0.8 * Tn + 37.5, wherein Vdaf is volatile matter%; wn is moisture%; dt is the ta...
Gespeichert in:
Hauptverfasser: | , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | CHANG YIBAO CHANG YIJUN ZHANG YUAN JIANG WEIMIN WANG SHELONG |
description | The invention discloses a method for predicting coke boulder yield. The coke boulder yield is predicted according to the following formula: coke boulder yield =-6 * Vdaf-4. 5 * Wn + 50 * Dt + 7.5 * Gn-48 * Kn + 4 * Yn + 0.8 * Tn + 37.5, wherein Vdaf is volatile matter%; wn is moisture%; dt is the tamping density, and the unit is g/cm < 3 >; gn is the number of interlayers, and the unit is layer; kn is the thickness of the coal seam, and the unit is m; yn is the thickness% of the gelatinous layer; tn is coking time, and the unit is hour. According to the method, the influence factors of the yield of the boulder yield of more than 80mm are analyzed and confirmed, the prediction model is fitted through a data statistics method, the accuracy is relatively high through actual production verification, technical support is provided for the coking plant of the heat recovery furnace type in the aspects of production method formulation and sales strategy planning, and the enterprise cost control and sales strategy plan |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN115099610A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN115099610A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN115099610A3</originalsourceid><addsrcrecordid>eNrjZNDwTS3JyE9RSMsvUigoSk3JTC7JzEtXSM7PTlVIyi_NSUktUqjMTM1J4WFgTUvMKU7lhdLcDIpuriHOHrqpBfnxqcUFicmpeakl8c5-hoamBpaWZoYGjsbEqAEAv-ooJg</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Method for predicting coke boulder yield</title><source>esp@cenet</source><creator>CHANG YIBAO ; CHANG YIJUN ; ZHANG YUAN ; JIANG WEIMIN ; WANG SHELONG</creator><creatorcontrib>CHANG YIBAO ; CHANG YIJUN ; ZHANG YUAN ; JIANG WEIMIN ; WANG SHELONG</creatorcontrib><description>The invention discloses a method for predicting coke boulder yield. The coke boulder yield is predicted according to the following formula: coke boulder yield =-6 * Vdaf-4. 5 * Wn + 50 * Dt + 7.5 * Gn-48 * Kn + 4 * Yn + 0.8 * Tn + 37.5, wherein Vdaf is volatile matter%; wn is moisture%; dt is the tamping density, and the unit is g/cm < 3 >; gn is the number of interlayers, and the unit is layer; kn is the thickness of the coal seam, and the unit is m; yn is the thickness% of the gelatinous layer; tn is coking time, and the unit is hour. According to the method, the influence factors of the yield of the boulder yield of more than 80mm are analyzed and confirmed, the prediction model is fitted through a data statistics method, the accuracy is relatively high through actual production verification, technical support is provided for the coking plant of the heat recovery furnace type in the aspects of production method formulation and sales strategy planning, and the enterprise cost control and sales strategy plan</description><language>chi ; eng</language><subject>CALCULATING ; COMPUTING ; COUNTING ; DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES ; ELECTRIC DIGITAL DATA PROCESSING ; PHYSICS ; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</subject><creationdate>2022</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20220923&DB=EPODOC&CC=CN&NR=115099610A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,309,781,886,25566,76549</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20220923&DB=EPODOC&CC=CN&NR=115099610A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>CHANG YIBAO</creatorcontrib><creatorcontrib>CHANG YIJUN</creatorcontrib><creatorcontrib>ZHANG YUAN</creatorcontrib><creatorcontrib>JIANG WEIMIN</creatorcontrib><creatorcontrib>WANG SHELONG</creatorcontrib><title>Method for predicting coke boulder yield</title><description>The invention discloses a method for predicting coke boulder yield. The coke boulder yield is predicted according to the following formula: coke boulder yield =-6 * Vdaf-4. 5 * Wn + 50 * Dt + 7.5 * Gn-48 * Kn + 4 * Yn + 0.8 * Tn + 37.5, wherein Vdaf is volatile matter%; wn is moisture%; dt is the tamping density, and the unit is g/cm < 3 >; gn is the number of interlayers, and the unit is layer; kn is the thickness of the coal seam, and the unit is m; yn is the thickness% of the gelatinous layer; tn is coking time, and the unit is hour. According to the method, the influence factors of the yield of the boulder yield of more than 80mm are analyzed and confirmed, the prediction model is fitted through a data statistics method, the accuracy is relatively high through actual production verification, technical support is provided for the coking plant of the heat recovery furnace type in the aspects of production method formulation and sales strategy planning, and the enterprise cost control and sales strategy plan</description><subject>CALCULATING</subject><subject>COMPUTING</subject><subject>COUNTING</subject><subject>DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES</subject><subject>ELECTRIC DIGITAL DATA PROCESSING</subject><subject>PHYSICS</subject><subject>SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2022</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZNDwTS3JyE9RSMsvUigoSk3JTC7JzEtXSM7PTlVIyi_NSUktUqjMTM1J4WFgTUvMKU7lhdLcDIpuriHOHrqpBfnxqcUFicmpeakl8c5-hoamBpaWZoYGjsbEqAEAv-ooJg</recordid><startdate>20220923</startdate><enddate>20220923</enddate><creator>CHANG YIBAO</creator><creator>CHANG YIJUN</creator><creator>ZHANG YUAN</creator><creator>JIANG WEIMIN</creator><creator>WANG SHELONG</creator><scope>EVB</scope></search><sort><creationdate>20220923</creationdate><title>Method for predicting coke boulder yield</title><author>CHANG YIBAO ; CHANG YIJUN ; ZHANG YUAN ; JIANG WEIMIN ; WANG SHELONG</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN115099610A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2022</creationdate><topic>CALCULATING</topic><topic>COMPUTING</topic><topic>COUNTING</topic><topic>DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES</topic><topic>ELECTRIC DIGITAL DATA PROCESSING</topic><topic>PHYSICS</topic><topic>SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</topic><toplevel>online_resources</toplevel><creatorcontrib>CHANG YIBAO</creatorcontrib><creatorcontrib>CHANG YIJUN</creatorcontrib><creatorcontrib>ZHANG YUAN</creatorcontrib><creatorcontrib>JIANG WEIMIN</creatorcontrib><creatorcontrib>WANG SHELONG</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>CHANG YIBAO</au><au>CHANG YIJUN</au><au>ZHANG YUAN</au><au>JIANG WEIMIN</au><au>WANG SHELONG</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Method for predicting coke boulder yield</title><date>2022-09-23</date><risdate>2022</risdate><abstract>The invention discloses a method for predicting coke boulder yield. The coke boulder yield is predicted according to the following formula: coke boulder yield =-6 * Vdaf-4. 5 * Wn + 50 * Dt + 7.5 * Gn-48 * Kn + 4 * Yn + 0.8 * Tn + 37.5, wherein Vdaf is volatile matter%; wn is moisture%; dt is the tamping density, and the unit is g/cm < 3 >; gn is the number of interlayers, and the unit is layer; kn is the thickness of the coal seam, and the unit is m; yn is the thickness% of the gelatinous layer; tn is coking time, and the unit is hour. According to the method, the influence factors of the yield of the boulder yield of more than 80mm are analyzed and confirmed, the prediction model is fitted through a data statistics method, the accuracy is relatively high through actual production verification, technical support is provided for the coking plant of the heat recovery furnace type in the aspects of production method formulation and sales strategy planning, and the enterprise cost control and sales strategy plan</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN115099610A |
source | esp@cenet |
subjects | CALCULATING COMPUTING COUNTING DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES ELECTRIC DIGITAL DATA PROCESSING PHYSICS SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR |
title | Method for predicting coke boulder yield |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-18T08%3A48%3A47IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=CHANG%20YIBAO&rft.date=2022-09-23&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN115099610A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |