Installation tool for grounding wire of transformer substation
The invention relates to the technical field of ground wire installation, and particularly discloses a transformer substation ground wire installation tool which comprises a shell, a first sleeve, a driven gear, a driving gear and a rocker. Wherein the first sleeve penetrates through the shell and i...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | SUN YONGBIN WANG WENCHAO LIU YANWEI CHEN XIAOPENG ZHONG MING SONG RONGJIAN SHE JIAHONG JI ZIYANG SUN RUI LIU CHUNFENG LI ZHOUYANG ZHENG WENXIN ZOU CHUN WEI CHANGDONG |
description | The invention relates to the technical field of ground wire installation, and particularly discloses a transformer substation ground wire installation tool which comprises a shell, a first sleeve, a driven gear, a driving gear and a rocker. Wherein the first sleeve penetrates through the shell and is rotationally connected with the shell, and an insulating rod of the grounding wire can be fixed in an inner cavity of the first sleeve. The first sleeve is sleeved with the driven gear, and the first sleeve rotates along with the driven gear. The driving gear is arranged on the shell and meshed with the driven gear. The rocker is connected with the driving gear, and the driving gear rotates along with the rocker. The installation tool for the grounding wire of the transformer substation has the advantages of being simple in structure and reliable and rapid in grounding wire installation.
本发明涉及接地线安装技术领域,具体公开了一种变电站接地线的安装工装,该变电站接地线的安装工装包括外壳、第一套筒、从动齿轮、主动齿轮以及摇杆。其中,第一套筒穿设于外壳,且与外壳转动连接,接地线的绝缘杆能够固定在第一套筒的内腔内。从动齿轮套设在第一套筒外,且 |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN115085069A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN115085069A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN115085069A3</originalsourceid><addsrcrecordid>eNrjZLDzzCsuSczJSSzJzM9TKMnPz1FIyy9SSC_KL81LycxLVyjPLEpVyE9TKClKzCsGSuWmFikUlyYBNYF08DCwpiXmFKfyQmluBkU31xBnD93Ugvz41OKCxOTUvNSSeGc_Q0NTAwtTAzNLR2Ni1AAAsa4xWg</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Installation tool for grounding wire of transformer substation</title><source>esp@cenet</source><creator>SUN YONGBIN ; WANG WENCHAO ; LIU YANWEI ; CHEN XIAOPENG ; ZHONG MING ; SONG RONGJIAN ; SHE JIAHONG ; JI ZIYANG ; SUN RUI ; LIU CHUNFENG ; LI ZHOUYANG ; ZHENG WENXIN ; ZOU CHUN ; WEI CHANGDONG</creator><creatorcontrib>SUN YONGBIN ; WANG WENCHAO ; LIU YANWEI ; CHEN XIAOPENG ; ZHONG MING ; SONG RONGJIAN ; SHE JIAHONG ; JI ZIYANG ; SUN RUI ; LIU CHUNFENG ; LI ZHOUYANG ; ZHENG WENXIN ; ZOU CHUN ; WEI CHANGDONG</creatorcontrib><description>The invention relates to the technical field of ground wire installation, and particularly discloses a transformer substation ground wire installation tool which comprises a shell, a first sleeve, a driven gear, a driving gear and a rocker. Wherein the first sleeve penetrates through the shell and is rotationally connected with the shell, and an insulating rod of the grounding wire can be fixed in an inner cavity of the first sleeve. The first sleeve is sleeved with the driven gear, and the first sleeve rotates along with the driven gear. The driving gear is arranged on the shell and meshed with the driven gear. The rocker is connected with the driving gear, and the driving gear rotates along with the rocker. The installation tool for the grounding wire of the transformer substation has the advantages of being simple in structure and reliable and rapid in grounding wire installation.
本发明涉及接地线安装技术领域,具体公开了一种变电站接地线的安装工装,该变电站接地线的安装工装包括外壳、第一套筒、从动齿轮、主动齿轮以及摇杆。其中,第一套筒穿设于外壳,且与外壳转动连接,接地线的绝缘杆能够固定在第一套筒的内腔内。从动齿轮套设在第一套筒外,且</description><language>chi ; eng</language><subject>BOARDS, SUBSTATIONS, OR SWITCHING ARRANGEMENTS FOR THE SUPPLYOR DISTRIBUTION OF ELECTRIC POWER ; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER ; ELECTRICITY ; GENERATION</subject><creationdate>2022</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20220920&DB=EPODOC&CC=CN&NR=115085069A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25543,76294</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20220920&DB=EPODOC&CC=CN&NR=115085069A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>SUN YONGBIN</creatorcontrib><creatorcontrib>WANG WENCHAO</creatorcontrib><creatorcontrib>LIU YANWEI</creatorcontrib><creatorcontrib>CHEN XIAOPENG</creatorcontrib><creatorcontrib>ZHONG MING</creatorcontrib><creatorcontrib>SONG RONGJIAN</creatorcontrib><creatorcontrib>SHE JIAHONG</creatorcontrib><creatorcontrib>JI ZIYANG</creatorcontrib><creatorcontrib>SUN RUI</creatorcontrib><creatorcontrib>LIU CHUNFENG</creatorcontrib><creatorcontrib>LI ZHOUYANG</creatorcontrib><creatorcontrib>ZHENG WENXIN</creatorcontrib><creatorcontrib>ZOU CHUN</creatorcontrib><creatorcontrib>WEI CHANGDONG</creatorcontrib><title>Installation tool for grounding wire of transformer substation</title><description>The invention relates to the technical field of ground wire installation, and particularly discloses a transformer substation ground wire installation tool which comprises a shell, a first sleeve, a driven gear, a driving gear and a rocker. Wherein the first sleeve penetrates through the shell and is rotationally connected with the shell, and an insulating rod of the grounding wire can be fixed in an inner cavity of the first sleeve. The first sleeve is sleeved with the driven gear, and the first sleeve rotates along with the driven gear. The driving gear is arranged on the shell and meshed with the driven gear. The rocker is connected with the driving gear, and the driving gear rotates along with the rocker. The installation tool for the grounding wire of the transformer substation has the advantages of being simple in structure and reliable and rapid in grounding wire installation.
本发明涉及接地线安装技术领域,具体公开了一种变电站接地线的安装工装,该变电站接地线的安装工装包括外壳、第一套筒、从动齿轮、主动齿轮以及摇杆。其中,第一套筒穿设于外壳,且与外壳转动连接,接地线的绝缘杆能够固定在第一套筒的内腔内。从动齿轮套设在第一套筒外,且</description><subject>BOARDS, SUBSTATIONS, OR SWITCHING ARRANGEMENTS FOR THE SUPPLYOR DISTRIBUTION OF ELECTRIC POWER</subject><subject>CONVERSION OR DISTRIBUTION OF ELECTRIC POWER</subject><subject>ELECTRICITY</subject><subject>GENERATION</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2022</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZLDzzCsuSczJSSzJzM9TKMnPz1FIyy9SSC_KL81LycxLVyjPLEpVyE9TKClKzCsGSuWmFikUlyYBNYF08DCwpiXmFKfyQmluBkU31xBnD93Ugvz41OKCxOTUvNSSeGc_Q0NTAwtTAzNLR2Ni1AAAsa4xWg</recordid><startdate>20220920</startdate><enddate>20220920</enddate><creator>SUN YONGBIN</creator><creator>WANG WENCHAO</creator><creator>LIU YANWEI</creator><creator>CHEN XIAOPENG</creator><creator>ZHONG MING</creator><creator>SONG RONGJIAN</creator><creator>SHE JIAHONG</creator><creator>JI ZIYANG</creator><creator>SUN RUI</creator><creator>LIU CHUNFENG</creator><creator>LI ZHOUYANG</creator><creator>ZHENG WENXIN</creator><creator>ZOU CHUN</creator><creator>WEI CHANGDONG</creator><scope>EVB</scope></search><sort><creationdate>20220920</creationdate><title>Installation tool for grounding wire of transformer substation</title><author>SUN YONGBIN ; WANG WENCHAO ; LIU YANWEI ; CHEN XIAOPENG ; ZHONG MING ; SONG RONGJIAN ; SHE JIAHONG ; JI ZIYANG ; SUN RUI ; LIU CHUNFENG ; LI ZHOUYANG ; ZHENG WENXIN ; ZOU CHUN ; WEI CHANGDONG</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN115085069A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2022</creationdate><topic>BOARDS, SUBSTATIONS, OR SWITCHING ARRANGEMENTS FOR THE SUPPLYOR DISTRIBUTION OF ELECTRIC POWER</topic><topic>CONVERSION OR DISTRIBUTION OF ELECTRIC POWER</topic><topic>ELECTRICITY</topic><topic>GENERATION</topic><toplevel>online_resources</toplevel><creatorcontrib>SUN YONGBIN</creatorcontrib><creatorcontrib>WANG WENCHAO</creatorcontrib><creatorcontrib>LIU YANWEI</creatorcontrib><creatorcontrib>CHEN XIAOPENG</creatorcontrib><creatorcontrib>ZHONG MING</creatorcontrib><creatorcontrib>SONG RONGJIAN</creatorcontrib><creatorcontrib>SHE JIAHONG</creatorcontrib><creatorcontrib>JI ZIYANG</creatorcontrib><creatorcontrib>SUN RUI</creatorcontrib><creatorcontrib>LIU CHUNFENG</creatorcontrib><creatorcontrib>LI ZHOUYANG</creatorcontrib><creatorcontrib>ZHENG WENXIN</creatorcontrib><creatorcontrib>ZOU CHUN</creatorcontrib><creatorcontrib>WEI CHANGDONG</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>SUN YONGBIN</au><au>WANG WENCHAO</au><au>LIU YANWEI</au><au>CHEN XIAOPENG</au><au>ZHONG MING</au><au>SONG RONGJIAN</au><au>SHE JIAHONG</au><au>JI ZIYANG</au><au>SUN RUI</au><au>LIU CHUNFENG</au><au>LI ZHOUYANG</au><au>ZHENG WENXIN</au><au>ZOU CHUN</au><au>WEI CHANGDONG</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Installation tool for grounding wire of transformer substation</title><date>2022-09-20</date><risdate>2022</risdate><abstract>The invention relates to the technical field of ground wire installation, and particularly discloses a transformer substation ground wire installation tool which comprises a shell, a first sleeve, a driven gear, a driving gear and a rocker. Wherein the first sleeve penetrates through the shell and is rotationally connected with the shell, and an insulating rod of the grounding wire can be fixed in an inner cavity of the first sleeve. The first sleeve is sleeved with the driven gear, and the first sleeve rotates along with the driven gear. The driving gear is arranged on the shell and meshed with the driven gear. The rocker is connected with the driving gear, and the driving gear rotates along with the rocker. The installation tool for the grounding wire of the transformer substation has the advantages of being simple in structure and reliable and rapid in grounding wire installation.
本发明涉及接地线安装技术领域,具体公开了一种变电站接地线的安装工装,该变电站接地线的安装工装包括外壳、第一套筒、从动齿轮、主动齿轮以及摇杆。其中,第一套筒穿设于外壳,且与外壳转动连接,接地线的绝缘杆能够固定在第一套筒的内腔内。从动齿轮套设在第一套筒外,且</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN115085069A |
source | esp@cenet |
subjects | BOARDS, SUBSTATIONS, OR SWITCHING ARRANGEMENTS FOR THE SUPPLYOR DISTRIBUTION OF ELECTRIC POWER CONVERSION OR DISTRIBUTION OF ELECTRIC POWER ELECTRICITY GENERATION |
title | Installation tool for grounding wire of transformer substation |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-21T11%3A14%3A13IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=SUN%20YONGBIN&rft.date=2022-09-20&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN115085069A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |