Grouting method for preventing stratum soil loss or ground surface settlement
The invention discloses a grouting method for preventing stratum soil loss or ground surface settlement, and relates to the technical field of buildings. Comprising the following steps that S1, grouting pipes are evenly distributed in the shield tail steel plate of the shield tunneling machine in th...
Gespeichert in:
Hauptverfasser: | , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | DONG CHUANZHOU CHEN ZIWEI WANG TIANJING LIU AILIAN WANG MENG XU ZHEN |
description | The invention discloses a grouting method for preventing stratum soil loss or ground surface settlement, and relates to the technical field of buildings. Comprising the following steps that S1, grouting pipes are evenly distributed in the shield tail steel plate of the shield tunneling machine in the up-down and left-right directions; s2, during shield tunneling, when a gap appears at the shield tail in the tunneling process, synchronous grouting is conducted immediately, and grout is injected into the gap at the shield tail; when the grouting pressure reaches the designed pressure and the grouting amount reaches the designed grouting amount, synchronous grouting is ended; s3, the shield continues to advance, after the lining segment is separated from the shield tail, secondary grouting is carried out behind the wall, one hole is injected into each ring of segment, and a grouting pipe is made to inject into a gap between the segment and the soil body from the grouting hole of the segment; and when the groutin |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN115030733A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN115030733A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN115030733A3</originalsourceid><addsrcrecordid>eNrjZPB1L8ovLcnMS1fITS3JyE9RSMsvUigoSi1LzQOLFpcUJZaU5ioU52fmKOTkFxcrAOXTgXryUhSKS4vSEpNTFYpTS0pyUnOBOngYWNMSc4pTeaE0N4Oim2uIs4duakF-fGpxAVB1XmpJvLOfoaGpgbGBubGxozExagA3rTbh</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Grouting method for preventing stratum soil loss or ground surface settlement</title><source>esp@cenet</source><creator>DONG CHUANZHOU ; CHEN ZIWEI ; WANG TIANJING ; LIU AILIAN ; WANG MENG ; XU ZHEN</creator><creatorcontrib>DONG CHUANZHOU ; CHEN ZIWEI ; WANG TIANJING ; LIU AILIAN ; WANG MENG ; XU ZHEN</creatorcontrib><description>The invention discloses a grouting method for preventing stratum soil loss or ground surface settlement, and relates to the technical field of buildings. Comprising the following steps that S1, grouting pipes are evenly distributed in the shield tail steel plate of the shield tunneling machine in the up-down and left-right directions; s2, during shield tunneling, when a gap appears at the shield tail in the tunneling process, synchronous grouting is conducted immediately, and grout is injected into the gap at the shield tail; when the grouting pressure reaches the designed pressure and the grouting amount reaches the designed grouting amount, synchronous grouting is ended; s3, the shield continues to advance, after the lining segment is separated from the shield tail, secondary grouting is carried out behind the wall, one hole is injected into each ring of segment, and a grouting pipe is made to inject into a gap between the segment and the soil body from the grouting hole of the segment; and when the groutin</description><language>chi ; eng</language><subject>ARTIFICIAL STONE ; CEMENTS ; CERAMICS ; CHEMISTRY ; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDINGMATERIALS ; CONCRETE ; EARTH DRILLING ; FIXED CONSTRUCTIONS ; GALLERIES ; LARGE UNDERGROUND CHAMBERS ; LIME, MAGNESIA ; METALLURGY ; MINING ; REFRACTORIES ; SHAFTS ; SLAG ; TREATMENT OF NATURAL STONE ; TUNNELS</subject><creationdate>2022</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20220909&DB=EPODOC&CC=CN&NR=115030733A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25543,76293</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20220909&DB=EPODOC&CC=CN&NR=115030733A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>DONG CHUANZHOU</creatorcontrib><creatorcontrib>CHEN ZIWEI</creatorcontrib><creatorcontrib>WANG TIANJING</creatorcontrib><creatorcontrib>LIU AILIAN</creatorcontrib><creatorcontrib>WANG MENG</creatorcontrib><creatorcontrib>XU ZHEN</creatorcontrib><title>Grouting method for preventing stratum soil loss or ground surface settlement</title><description>The invention discloses a grouting method for preventing stratum soil loss or ground surface settlement, and relates to the technical field of buildings. Comprising the following steps that S1, grouting pipes are evenly distributed in the shield tail steel plate of the shield tunneling machine in the up-down and left-right directions; s2, during shield tunneling, when a gap appears at the shield tail in the tunneling process, synchronous grouting is conducted immediately, and grout is injected into the gap at the shield tail; when the grouting pressure reaches the designed pressure and the grouting amount reaches the designed grouting amount, synchronous grouting is ended; s3, the shield continues to advance, after the lining segment is separated from the shield tail, secondary grouting is carried out behind the wall, one hole is injected into each ring of segment, and a grouting pipe is made to inject into a gap between the segment and the soil body from the grouting hole of the segment; and when the groutin</description><subject>ARTIFICIAL STONE</subject><subject>CEMENTS</subject><subject>CERAMICS</subject><subject>CHEMISTRY</subject><subject>COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDINGMATERIALS</subject><subject>CONCRETE</subject><subject>EARTH DRILLING</subject><subject>FIXED CONSTRUCTIONS</subject><subject>GALLERIES</subject><subject>LARGE UNDERGROUND CHAMBERS</subject><subject>LIME, MAGNESIA</subject><subject>METALLURGY</subject><subject>MINING</subject><subject>REFRACTORIES</subject><subject>SHAFTS</subject><subject>SLAG</subject><subject>TREATMENT OF NATURAL STONE</subject><subject>TUNNELS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2022</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZPB1L8ovLcnMS1fITS3JyE9RSMsvUigoSi1LzQOLFpcUJZaU5ioU52fmKOTkFxcrAOXTgXryUhSKS4vSEpNTFYpTS0pyUnOBOngYWNMSc4pTeaE0N4Oim2uIs4duakF-fGpxAVB1XmpJvLOfoaGpgbGBubGxozExagA3rTbh</recordid><startdate>20220909</startdate><enddate>20220909</enddate><creator>DONG CHUANZHOU</creator><creator>CHEN ZIWEI</creator><creator>WANG TIANJING</creator><creator>LIU AILIAN</creator><creator>WANG MENG</creator><creator>XU ZHEN</creator><scope>EVB</scope></search><sort><creationdate>20220909</creationdate><title>Grouting method for preventing stratum soil loss or ground surface settlement</title><author>DONG CHUANZHOU ; CHEN ZIWEI ; WANG TIANJING ; LIU AILIAN ; WANG MENG ; XU ZHEN</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN115030733A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2022</creationdate><topic>ARTIFICIAL STONE</topic><topic>CEMENTS</topic><topic>CERAMICS</topic><topic>CHEMISTRY</topic><topic>COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDINGMATERIALS</topic><topic>CONCRETE</topic><topic>EARTH DRILLING</topic><topic>FIXED CONSTRUCTIONS</topic><topic>GALLERIES</topic><topic>LARGE UNDERGROUND CHAMBERS</topic><topic>LIME, MAGNESIA</topic><topic>METALLURGY</topic><topic>MINING</topic><topic>REFRACTORIES</topic><topic>SHAFTS</topic><topic>SLAG</topic><topic>TREATMENT OF NATURAL STONE</topic><topic>TUNNELS</topic><toplevel>online_resources</toplevel><creatorcontrib>DONG CHUANZHOU</creatorcontrib><creatorcontrib>CHEN ZIWEI</creatorcontrib><creatorcontrib>WANG TIANJING</creatorcontrib><creatorcontrib>LIU AILIAN</creatorcontrib><creatorcontrib>WANG MENG</creatorcontrib><creatorcontrib>XU ZHEN</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>DONG CHUANZHOU</au><au>CHEN ZIWEI</au><au>WANG TIANJING</au><au>LIU AILIAN</au><au>WANG MENG</au><au>XU ZHEN</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Grouting method for preventing stratum soil loss or ground surface settlement</title><date>2022-09-09</date><risdate>2022</risdate><abstract>The invention discloses a grouting method for preventing stratum soil loss or ground surface settlement, and relates to the technical field of buildings. Comprising the following steps that S1, grouting pipes are evenly distributed in the shield tail steel plate of the shield tunneling machine in the up-down and left-right directions; s2, during shield tunneling, when a gap appears at the shield tail in the tunneling process, synchronous grouting is conducted immediately, and grout is injected into the gap at the shield tail; when the grouting pressure reaches the designed pressure and the grouting amount reaches the designed grouting amount, synchronous grouting is ended; s3, the shield continues to advance, after the lining segment is separated from the shield tail, secondary grouting is carried out behind the wall, one hole is injected into each ring of segment, and a grouting pipe is made to inject into a gap between the segment and the soil body from the grouting hole of the segment; and when the groutin</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN115030733A |
source | esp@cenet |
subjects | ARTIFICIAL STONE CEMENTS CERAMICS CHEMISTRY COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDINGMATERIALS CONCRETE EARTH DRILLING FIXED CONSTRUCTIONS GALLERIES LARGE UNDERGROUND CHAMBERS LIME, MAGNESIA METALLURGY MINING REFRACTORIES SHAFTS SLAG TREATMENT OF NATURAL STONE TUNNELS |
title | Grouting method for preventing stratum soil loss or ground surface settlement |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-23T20%3A01%3A10IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=DONG%20CHUANZHOU&rft.date=2022-09-09&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN115030733A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |