Slurry shield high-water-pressure uneven-hardness stratum pressure maintaining construction method

The invention relates to a slurry shield high-water-pressure soft and hard uneven stratum pressure maintaining construction method. The method comprises the following steps that modified water glass is injected into the outer side of a shield tunneling machine and the outer side of a first ring pipe...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: LYU SHAOCHAO, LI HAI, CHENG XINMING, ZHANG BOWEI, ZHOU JIE, CHEN SHIGUANG, LI YAZI, YUE CHENGHUAN, FU YANGHONG, HE JUCHUAN
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator LYU SHAOCHAO
LI HAI
CHENG XINMING
ZHANG BOWEI
ZHOU JIE
CHEN SHIGUANG
LI YAZI
YUE CHENGHUAN
FU YANGHONG
HE JUCHUAN
description The invention relates to a slurry shield high-water-pressure soft and hard uneven stratum pressure maintaining construction method. The method comprises the following steps that modified water glass is injected into the outer side of a shield tunneling machine and the outer side of a first ring pipe piece disengaged from a shield tail; cement and water glass double-liquid slurry is injected into the outer sides of the second-ring pipe piece, the third-ring pipe piece, the fifteenth-ring pipe piece and the sixteenth-ring pipe piece which are separated from the shield tail to form a hoop structure; cement paste is injected between the two hoop structures; and advanced reinforcement grouting is conducted on the upper soil layer in front of the shield tunneling machine till the shield tunneling machine conducts tunneling to pass through the soft and hard uneven stratum. According to the construction method, the pipe shed reinforcing area is formed above the to-be-tunneled soil body of the shield through advanced
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN115012967A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN115012967A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN115012967A3</originalsourceid><addsrcrecordid>eNqNijEKAjEQRbexEPUO4wECrqJiKYtiZaP9EpPZTSCZLJOJ4u3dQqwtHh_ef9PqcQuF-Q3ZeQwWnO-demlBVgNjzoURCuETSTnNlkYFWVhLifALovYkI556MInGvxjxiSCiuGTn1aTTIePiu7NqeT7dm4vCIbWYB22QUNrmWtfbVb0-7PbHzT_NByz3P8M</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Slurry shield high-water-pressure uneven-hardness stratum pressure maintaining construction method</title><source>esp@cenet</source><creator>LYU SHAOCHAO ; LI HAI ; CHENG XINMING ; ZHANG BOWEI ; ZHOU JIE ; CHEN SHIGUANG ; LI YAZI ; YUE CHENGHUAN ; FU YANGHONG ; HE JUCHUAN</creator><creatorcontrib>LYU SHAOCHAO ; LI HAI ; CHENG XINMING ; ZHANG BOWEI ; ZHOU JIE ; CHEN SHIGUANG ; LI YAZI ; YUE CHENGHUAN ; FU YANGHONG ; HE JUCHUAN</creatorcontrib><description>The invention relates to a slurry shield high-water-pressure soft and hard uneven stratum pressure maintaining construction method. The method comprises the following steps that modified water glass is injected into the outer side of a shield tunneling machine and the outer side of a first ring pipe piece disengaged from a shield tail; cement and water glass double-liquid slurry is injected into the outer sides of the second-ring pipe piece, the third-ring pipe piece, the fifteenth-ring pipe piece and the sixteenth-ring pipe piece which are separated from the shield tail to form a hoop structure; cement paste is injected between the two hoop structures; and advanced reinforcement grouting is conducted on the upper soil layer in front of the shield tunneling machine till the shield tunneling machine conducts tunneling to pass through the soft and hard uneven stratum. According to the construction method, the pipe shed reinforcing area is formed above the to-be-tunneled soil body of the shield through advanced</description><language>chi ; eng</language><subject>EARTH DRILLING ; FIXED CONSTRUCTIONS ; GALLERIES ; LARGE UNDERGROUND CHAMBERS ; MINING ; SHAFTS ; TUNNELS</subject><creationdate>2022</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20220906&amp;DB=EPODOC&amp;CC=CN&amp;NR=115012967A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20220906&amp;DB=EPODOC&amp;CC=CN&amp;NR=115012967A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>LYU SHAOCHAO</creatorcontrib><creatorcontrib>LI HAI</creatorcontrib><creatorcontrib>CHENG XINMING</creatorcontrib><creatorcontrib>ZHANG BOWEI</creatorcontrib><creatorcontrib>ZHOU JIE</creatorcontrib><creatorcontrib>CHEN SHIGUANG</creatorcontrib><creatorcontrib>LI YAZI</creatorcontrib><creatorcontrib>YUE CHENGHUAN</creatorcontrib><creatorcontrib>FU YANGHONG</creatorcontrib><creatorcontrib>HE JUCHUAN</creatorcontrib><title>Slurry shield high-water-pressure uneven-hardness stratum pressure maintaining construction method</title><description>The invention relates to a slurry shield high-water-pressure soft and hard uneven stratum pressure maintaining construction method. The method comprises the following steps that modified water glass is injected into the outer side of a shield tunneling machine and the outer side of a first ring pipe piece disengaged from a shield tail; cement and water glass double-liquid slurry is injected into the outer sides of the second-ring pipe piece, the third-ring pipe piece, the fifteenth-ring pipe piece and the sixteenth-ring pipe piece which are separated from the shield tail to form a hoop structure; cement paste is injected between the two hoop structures; and advanced reinforcement grouting is conducted on the upper soil layer in front of the shield tunneling machine till the shield tunneling machine conducts tunneling to pass through the soft and hard uneven stratum. According to the construction method, the pipe shed reinforcing area is formed above the to-be-tunneled soil body of the shield through advanced</description><subject>EARTH DRILLING</subject><subject>FIXED CONSTRUCTIONS</subject><subject>GALLERIES</subject><subject>LARGE UNDERGROUND CHAMBERS</subject><subject>MINING</subject><subject>SHAFTS</subject><subject>TUNNELS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2022</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNijEKAjEQRbexEPUO4wECrqJiKYtiZaP9EpPZTSCZLJOJ4u3dQqwtHh_ef9PqcQuF-Q3ZeQwWnO-demlBVgNjzoURCuETSTnNlkYFWVhLifALovYkI556MInGvxjxiSCiuGTn1aTTIePiu7NqeT7dm4vCIbWYB22QUNrmWtfbVb0-7PbHzT_NByz3P8M</recordid><startdate>20220906</startdate><enddate>20220906</enddate><creator>LYU SHAOCHAO</creator><creator>LI HAI</creator><creator>CHENG XINMING</creator><creator>ZHANG BOWEI</creator><creator>ZHOU JIE</creator><creator>CHEN SHIGUANG</creator><creator>LI YAZI</creator><creator>YUE CHENGHUAN</creator><creator>FU YANGHONG</creator><creator>HE JUCHUAN</creator><scope>EVB</scope></search><sort><creationdate>20220906</creationdate><title>Slurry shield high-water-pressure uneven-hardness stratum pressure maintaining construction method</title><author>LYU SHAOCHAO ; LI HAI ; CHENG XINMING ; ZHANG BOWEI ; ZHOU JIE ; CHEN SHIGUANG ; LI YAZI ; YUE CHENGHUAN ; FU YANGHONG ; HE JUCHUAN</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN115012967A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2022</creationdate><topic>EARTH DRILLING</topic><topic>FIXED CONSTRUCTIONS</topic><topic>GALLERIES</topic><topic>LARGE UNDERGROUND CHAMBERS</topic><topic>MINING</topic><topic>SHAFTS</topic><topic>TUNNELS</topic><toplevel>online_resources</toplevel><creatorcontrib>LYU SHAOCHAO</creatorcontrib><creatorcontrib>LI HAI</creatorcontrib><creatorcontrib>CHENG XINMING</creatorcontrib><creatorcontrib>ZHANG BOWEI</creatorcontrib><creatorcontrib>ZHOU JIE</creatorcontrib><creatorcontrib>CHEN SHIGUANG</creatorcontrib><creatorcontrib>LI YAZI</creatorcontrib><creatorcontrib>YUE CHENGHUAN</creatorcontrib><creatorcontrib>FU YANGHONG</creatorcontrib><creatorcontrib>HE JUCHUAN</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>LYU SHAOCHAO</au><au>LI HAI</au><au>CHENG XINMING</au><au>ZHANG BOWEI</au><au>ZHOU JIE</au><au>CHEN SHIGUANG</au><au>LI YAZI</au><au>YUE CHENGHUAN</au><au>FU YANGHONG</au><au>HE JUCHUAN</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Slurry shield high-water-pressure uneven-hardness stratum pressure maintaining construction method</title><date>2022-09-06</date><risdate>2022</risdate><abstract>The invention relates to a slurry shield high-water-pressure soft and hard uneven stratum pressure maintaining construction method. The method comprises the following steps that modified water glass is injected into the outer side of a shield tunneling machine and the outer side of a first ring pipe piece disengaged from a shield tail; cement and water glass double-liquid slurry is injected into the outer sides of the second-ring pipe piece, the third-ring pipe piece, the fifteenth-ring pipe piece and the sixteenth-ring pipe piece which are separated from the shield tail to form a hoop structure; cement paste is injected between the two hoop structures; and advanced reinforcement grouting is conducted on the upper soil layer in front of the shield tunneling machine till the shield tunneling machine conducts tunneling to pass through the soft and hard uneven stratum. According to the construction method, the pipe shed reinforcing area is formed above the to-be-tunneled soil body of the shield through advanced</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN115012967A
source esp@cenet
subjects EARTH DRILLING
FIXED CONSTRUCTIONS
GALLERIES
LARGE UNDERGROUND CHAMBERS
MINING
SHAFTS
TUNNELS
title Slurry shield high-water-pressure uneven-hardness stratum pressure maintaining construction method
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-20T01%3A23%3A16IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=LYU%20SHAOCHAO&rft.date=2022-09-06&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN115012967A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true