Large-span steel bridge factory overall unloading method

The invention relates to an integral unloading method for a large-span steel bridge factory, which specifically comprises the following steps of: 1) cutting off other jig frames corresponding to the two side parts of a box girder in sequence under the condition that the jig frames corresponding to t...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: XU BIN, TIAN SHENGDE, ZHOU WEI, XU JINMING, HE JIHONG
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator XU BIN
TIAN SHENGDE
ZHOU WEI
XU JINMING
HE JIHONG
description The invention relates to an integral unloading method for a large-span steel bridge factory, which specifically comprises the following steps of: 1) cutting off other jig frames corresponding to the two side parts of a box girder in sequence under the condition that the jig frames corresponding to the two ends and the middle part of the box girder are reserved; the jig frames corresponding to the middle of the box girder are all located between the two sliding supports, a plurality of base plates are arranged at the two ends and the middle of the box girder and correspond to the jig frames, and the box girder is supported on the base plates. (2) the box girder is synchronously jacked on the jig frames corresponding to the two ends of the box girder through jacking mechanisms, base plates on the jig frames corresponding to the two ends of the box girder are removed, and then the jacking mechanisms synchronously fall back to enable the box girder to be supported on the sliding supports and the jig frames in the
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN114908689A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN114908689A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN114908689A3</originalsourceid><addsrcrecordid>eNrjZLDwSSxKT9UtLkjMUyguSU3NUUgqykxJT1VIS0wuyS-qVMgvSy1KzMlRKM3LyU9MycxLV8hNLcnIT-FhYE1LzClO5YXS3AyKbq4hzh66qQX58alA85JT81JL4p39DA1NLA0szCwsHY2JUQMAD84ufg</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Large-span steel bridge factory overall unloading method</title><source>esp@cenet</source><creator>XU BIN ; TIAN SHENGDE ; ZHOU WEI ; XU JINMING ; HE JIHONG</creator><creatorcontrib>XU BIN ; TIAN SHENGDE ; ZHOU WEI ; XU JINMING ; HE JIHONG</creatorcontrib><description>The invention relates to an integral unloading method for a large-span steel bridge factory, which specifically comprises the following steps of: 1) cutting off other jig frames corresponding to the two side parts of a box girder in sequence under the condition that the jig frames corresponding to the two ends and the middle part of the box girder are reserved; the jig frames corresponding to the middle of the box girder are all located between the two sliding supports, a plurality of base plates are arranged at the two ends and the middle of the box girder and correspond to the jig frames, and the box girder is supported on the base plates. (2) the box girder is synchronously jacked on the jig frames corresponding to the two ends of the box girder through jacking mechanisms, base plates on the jig frames corresponding to the two ends of the box girder are removed, and then the jacking mechanisms synchronously fall back to enable the box girder to be supported on the sliding supports and the jig frames in the</description><language>chi ; eng</language><subject>ASSEMBLY OF BRIDGES ; CONSTRUCTION OF BRIDGES ; CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES ; FIXED CONSTRUCTIONS ; OR VIADUCTS</subject><creationdate>2022</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20220816&amp;DB=EPODOC&amp;CC=CN&amp;NR=114908689A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76290</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20220816&amp;DB=EPODOC&amp;CC=CN&amp;NR=114908689A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>XU BIN</creatorcontrib><creatorcontrib>TIAN SHENGDE</creatorcontrib><creatorcontrib>ZHOU WEI</creatorcontrib><creatorcontrib>XU JINMING</creatorcontrib><creatorcontrib>HE JIHONG</creatorcontrib><title>Large-span steel bridge factory overall unloading method</title><description>The invention relates to an integral unloading method for a large-span steel bridge factory, which specifically comprises the following steps of: 1) cutting off other jig frames corresponding to the two side parts of a box girder in sequence under the condition that the jig frames corresponding to the two ends and the middle part of the box girder are reserved; the jig frames corresponding to the middle of the box girder are all located between the two sliding supports, a plurality of base plates are arranged at the two ends and the middle of the box girder and correspond to the jig frames, and the box girder is supported on the base plates. (2) the box girder is synchronously jacked on the jig frames corresponding to the two ends of the box girder through jacking mechanisms, base plates on the jig frames corresponding to the two ends of the box girder are removed, and then the jacking mechanisms synchronously fall back to enable the box girder to be supported on the sliding supports and the jig frames in the</description><subject>ASSEMBLY OF BRIDGES</subject><subject>CONSTRUCTION OF BRIDGES</subject><subject>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</subject><subject>FIXED CONSTRUCTIONS</subject><subject>OR VIADUCTS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2022</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZLDwSSxKT9UtLkjMUyguSU3NUUgqykxJT1VIS0wuyS-qVMgvSy1KzMlRKM3LyU9MycxLV8hNLcnIT-FhYE1LzClO5YXS3AyKbq4hzh66qQX58alA85JT81JL4p39DA1NLA0szCwsHY2JUQMAD84ufg</recordid><startdate>20220816</startdate><enddate>20220816</enddate><creator>XU BIN</creator><creator>TIAN SHENGDE</creator><creator>ZHOU WEI</creator><creator>XU JINMING</creator><creator>HE JIHONG</creator><scope>EVB</scope></search><sort><creationdate>20220816</creationdate><title>Large-span steel bridge factory overall unloading method</title><author>XU BIN ; TIAN SHENGDE ; ZHOU WEI ; XU JINMING ; HE JIHONG</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN114908689A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2022</creationdate><topic>ASSEMBLY OF BRIDGES</topic><topic>CONSTRUCTION OF BRIDGES</topic><topic>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</topic><topic>FIXED CONSTRUCTIONS</topic><topic>OR VIADUCTS</topic><toplevel>online_resources</toplevel><creatorcontrib>XU BIN</creatorcontrib><creatorcontrib>TIAN SHENGDE</creatorcontrib><creatorcontrib>ZHOU WEI</creatorcontrib><creatorcontrib>XU JINMING</creatorcontrib><creatorcontrib>HE JIHONG</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>XU BIN</au><au>TIAN SHENGDE</au><au>ZHOU WEI</au><au>XU JINMING</au><au>HE JIHONG</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Large-span steel bridge factory overall unloading method</title><date>2022-08-16</date><risdate>2022</risdate><abstract>The invention relates to an integral unloading method for a large-span steel bridge factory, which specifically comprises the following steps of: 1) cutting off other jig frames corresponding to the two side parts of a box girder in sequence under the condition that the jig frames corresponding to the two ends and the middle part of the box girder are reserved; the jig frames corresponding to the middle of the box girder are all located between the two sliding supports, a plurality of base plates are arranged at the two ends and the middle of the box girder and correspond to the jig frames, and the box girder is supported on the base plates. (2) the box girder is synchronously jacked on the jig frames corresponding to the two ends of the box girder through jacking mechanisms, base plates on the jig frames corresponding to the two ends of the box girder are removed, and then the jacking mechanisms synchronously fall back to enable the box girder to be supported on the sliding supports and the jig frames in the</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN114908689A
source esp@cenet
subjects ASSEMBLY OF BRIDGES
CONSTRUCTION OF BRIDGES
CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
FIXED CONSTRUCTIONS
OR VIADUCTS
title Large-span steel bridge factory overall unloading method
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-01T21%3A17%3A05IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=XU%20BIN&rft.date=2022-08-16&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN114908689A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true