Dry dock arrangement method based on immersed tunnel crossing river

The invention provides a dry dock arrangement method based on an immersed tunnel crossing a centerline, which comprises the following steps of: taking a foundation trench excavated in the middle line of a tunnel line on the upper edge of the centerline as a dry dock prefabricated pipe joint, draggin...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: DA WUQIANG, SUN CHAO, FEI MANLI, ZHANG GUANGWEI, HE WEIGUO, YU YONG, YU ZUFENG, YE DONGMING, WANG ZHIXIN, XING YONGHUI, HU BIN
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator DA WUQIANG
SUN CHAO
FEI MANLI
ZHANG GUANGWEI
HE WEIGUO
YU YONG
YU ZUFENG
YE DONGMING
WANG ZHIXIN
XING YONGHUI
HU BIN
description The invention provides a dry dock arrangement method based on an immersed tunnel crossing a centerline, which comprises the following steps of: taking a foundation trench excavated in the middle line of a tunnel line on the upper edge of the centerline as a dry dock prefabricated pipe joint, dragging a first batch of pipe joints out of the dock through dock gate hinges arranged at two ends of the foundation trench to carry out sinking butt joint, and prefabricating subsequent batches of pipe joints after a dock gate is recovered; and the last batch of pipe joints are foundation trench inner pipe joints, sinking butt joint is carried out through ground anchor hinge dragging, final joints are poured in an underwater joint mode, and finally construction of the immersed tunnel is completed. According to the method, a dry dock does not need to be independently built, the problem that the site selection difficulty of a different-place dry dock is large is solved, long-distance floating transportation is not needed,
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN114837226A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN114837226A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN114837226A3</originalsourceid><addsrcrecordid>eNrjZHB2KapUSMlPzlZILCpKzEtPzU3NK1HITS3JyE9RSEosTk1RyM9TyMzNTS0CsUtK8_JScxSSi_KLizPz0hWKMstSi3gYWNMSc4pTeaE0N4Oim2uIs4duakF-fGpxQWJyal5qSbyzn6GhiYWxuZGRmaMxMWoAfP0yiw</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Dry dock arrangement method based on immersed tunnel crossing river</title><source>esp@cenet</source><creator>DA WUQIANG ; SUN CHAO ; FEI MANLI ; ZHANG GUANGWEI ; HE WEIGUO ; YU YONG ; YU ZUFENG ; YE DONGMING ; WANG ZHIXIN ; XING YONGHUI ; HU BIN</creator><creatorcontrib>DA WUQIANG ; SUN CHAO ; FEI MANLI ; ZHANG GUANGWEI ; HE WEIGUO ; YU YONG ; YU ZUFENG ; YE DONGMING ; WANG ZHIXIN ; XING YONGHUI ; HU BIN</creatorcontrib><description>The invention provides a dry dock arrangement method based on an immersed tunnel crossing a centerline, which comprises the following steps of: taking a foundation trench excavated in the middle line of a tunnel line on the upper edge of the centerline as a dry dock prefabricated pipe joint, dragging a first batch of pipe joints out of the dock through dock gate hinges arranged at two ends of the foundation trench to carry out sinking butt joint, and prefabricating subsequent batches of pipe joints after a dock gate is recovered; and the last batch of pipe joints are foundation trench inner pipe joints, sinking butt joint is carried out through ground anchor hinge dragging, final joints are poured in an underwater joint mode, and finally construction of the immersed tunnel is completed. According to the method, a dry dock does not need to be independently built, the problem that the site selection difficulty of a different-place dry dock is large is solved, long-distance floating transportation is not needed,</description><language>chi ; eng</language><subject>EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; SOIL SHIFTING ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>2022</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20220802&amp;DB=EPODOC&amp;CC=CN&amp;NR=114837226A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,309,781,886,25569,76552</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20220802&amp;DB=EPODOC&amp;CC=CN&amp;NR=114837226A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>DA WUQIANG</creatorcontrib><creatorcontrib>SUN CHAO</creatorcontrib><creatorcontrib>FEI MANLI</creatorcontrib><creatorcontrib>ZHANG GUANGWEI</creatorcontrib><creatorcontrib>HE WEIGUO</creatorcontrib><creatorcontrib>YU YONG</creatorcontrib><creatorcontrib>YU ZUFENG</creatorcontrib><creatorcontrib>YE DONGMING</creatorcontrib><creatorcontrib>WANG ZHIXIN</creatorcontrib><creatorcontrib>XING YONGHUI</creatorcontrib><creatorcontrib>HU BIN</creatorcontrib><title>Dry dock arrangement method based on immersed tunnel crossing river</title><description>The invention provides a dry dock arrangement method based on an immersed tunnel crossing a centerline, which comprises the following steps of: taking a foundation trench excavated in the middle line of a tunnel line on the upper edge of the centerline as a dry dock prefabricated pipe joint, dragging a first batch of pipe joints out of the dock through dock gate hinges arranged at two ends of the foundation trench to carry out sinking butt joint, and prefabricating subsequent batches of pipe joints after a dock gate is recovered; and the last batch of pipe joints are foundation trench inner pipe joints, sinking butt joint is carried out through ground anchor hinge dragging, final joints are poured in an underwater joint mode, and finally construction of the immersed tunnel is completed. According to the method, a dry dock does not need to be independently built, the problem that the site selection difficulty of a different-place dry dock is large is solved, long-distance floating transportation is not needed,</description><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>SOIL SHIFTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2022</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZHB2KapUSMlPzlZILCpKzEtPzU3NK1HITS3JyE9RSEosTk1RyM9TyMzNTS0CsUtK8_JScxSSi_KLizPz0hWKMstSi3gYWNMSc4pTeaE0N4Oim2uIs4duakF-fGpxQWJyal5qSbyzn6GhiYWxuZGRmaMxMWoAfP0yiw</recordid><startdate>20220802</startdate><enddate>20220802</enddate><creator>DA WUQIANG</creator><creator>SUN CHAO</creator><creator>FEI MANLI</creator><creator>ZHANG GUANGWEI</creator><creator>HE WEIGUO</creator><creator>YU YONG</creator><creator>YU ZUFENG</creator><creator>YE DONGMING</creator><creator>WANG ZHIXIN</creator><creator>XING YONGHUI</creator><creator>HU BIN</creator><scope>EVB</scope></search><sort><creationdate>20220802</creationdate><title>Dry dock arrangement method based on immersed tunnel crossing river</title><author>DA WUQIANG ; SUN CHAO ; FEI MANLI ; ZHANG GUANGWEI ; HE WEIGUO ; YU YONG ; YU ZUFENG ; YE DONGMING ; WANG ZHIXIN ; XING YONGHUI ; HU BIN</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN114837226A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2022</creationdate><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>SOIL SHIFTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>DA WUQIANG</creatorcontrib><creatorcontrib>SUN CHAO</creatorcontrib><creatorcontrib>FEI MANLI</creatorcontrib><creatorcontrib>ZHANG GUANGWEI</creatorcontrib><creatorcontrib>HE WEIGUO</creatorcontrib><creatorcontrib>YU YONG</creatorcontrib><creatorcontrib>YU ZUFENG</creatorcontrib><creatorcontrib>YE DONGMING</creatorcontrib><creatorcontrib>WANG ZHIXIN</creatorcontrib><creatorcontrib>XING YONGHUI</creatorcontrib><creatorcontrib>HU BIN</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>DA WUQIANG</au><au>SUN CHAO</au><au>FEI MANLI</au><au>ZHANG GUANGWEI</au><au>HE WEIGUO</au><au>YU YONG</au><au>YU ZUFENG</au><au>YE DONGMING</au><au>WANG ZHIXIN</au><au>XING YONGHUI</au><au>HU BIN</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Dry dock arrangement method based on immersed tunnel crossing river</title><date>2022-08-02</date><risdate>2022</risdate><abstract>The invention provides a dry dock arrangement method based on an immersed tunnel crossing a centerline, which comprises the following steps of: taking a foundation trench excavated in the middle line of a tunnel line on the upper edge of the centerline as a dry dock prefabricated pipe joint, dragging a first batch of pipe joints out of the dock through dock gate hinges arranged at two ends of the foundation trench to carry out sinking butt joint, and prefabricating subsequent batches of pipe joints after a dock gate is recovered; and the last batch of pipe joints are foundation trench inner pipe joints, sinking butt joint is carried out through ground anchor hinge dragging, final joints are poured in an underwater joint mode, and finally construction of the immersed tunnel is completed. According to the method, a dry dock does not need to be independently built, the problem that the site selection difficulty of a different-place dry dock is large is solved, long-distance floating transportation is not needed,</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN114837226A
source esp@cenet
subjects EMBANKMENTS
EXCAVATIONS
FIXED CONSTRUCTIONS
FOUNDATIONS
HYDRAULIC ENGINEERING
SOIL SHIFTING
UNDERGROUND OR UNDERWATER STRUCTURES
title Dry dock arrangement method based on immersed tunnel crossing river
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-15T04%3A07%3A30IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=DA%20WUQIANG&rft.date=2022-08-02&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN114837226A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true