Construction method of unbonded prestressed cast-in-situ bored pile
The invention discloses a construction method of an unbonded prestressed cast-in-situ bored pile. The construction method comprises the following steps: drilling in a preset area to form a pile hole; preparing a reinforcement cage; the reinforcement cage is lifted to the position above the pile hole...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Schreiben Sie den ersten Kommentar!