Construction method of unbonded prestressed cast-in-situ bored pile

The invention discloses a construction method of an unbonded prestressed cast-in-situ bored pile. The construction method comprises the following steps: drilling in a preset area to form a pile hole; preparing a reinforcement cage; the reinforcement cage is lifted to the position above the pile hole...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: WANG LEI, LIU JUN, SHI XUE, ZHU DONGMING, ZHANG SHIWEI, LIN ZUNHU, NIE NAN, CHEN HAOJUN, CHEN JUTAO, YANG FENG
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!