Jacking construction control method for frame structure bridge

The invention discloses a frame structure bridge jacking construction control method, solves the problem of how to improve the frame structure bridge jacking construction efficiency, and belongs to the technical field of frame structure bridge jacking precision control. The construction method compr...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: WANG LEI, LIU ZHIGANG, FAN MENGQI, WANG ZITIAN, REN XUEZHI, BAI JIARUI, ZHAO JIAN, WANG SHENGLI, CHENG WEI, HONG WEIXIN
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator WANG LEI
LIU ZHIGANG
FAN MENGQI
WANG ZITIAN
REN XUEZHI
BAI JIARUI
ZHAO JIAN
WANG SHENGLI
CHENG WEI
HONG WEIXIN
description The invention discloses a frame structure bridge jacking construction control method, solves the problem of how to improve the frame structure bridge jacking construction efficiency, and belongs to the technical field of frame structure bridge jacking precision control. The construction method comprises the steps that 1, a plurality of cross beams are arranged in a construction area, the positions of the cross beams are determined, the cross beams divide the construction area into a plurality of blocks and surround the construction area, and foundation trenches are formed in the cross beams in the construction area; 2, steel bars are placed in the foundation trench; 3, concrete is poured at the cross beam; and 4, frame structure bridge jacking construction is carried out, horizontal deviation remeasurement is carried out every time a pickaxe is jacked in the construction process, and the jacking direction is adjusted in time. The cross beam is used for replacing a sliding plate, the operation efficiency and c
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN114808735A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN114808735A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN114808735A3</originalsourceid><addsrcrecordid>eNrjZLDzSkzOzsxLV0jOzysuKSpNLsnMzwNxSorycxRyU0sy8lMU0vKLFNKKEnNTFSBKSotSFZKKMlPSU3kYWNMSc4pTeaE0N4Oim2uIs4duakF-fGpxQWJyal5qSbyzn6GhiYWBhbmxqaMxMWoAnjIxIw</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Jacking construction control method for frame structure bridge</title><source>esp@cenet</source><creator>WANG LEI ; LIU ZHIGANG ; FAN MENGQI ; WANG ZITIAN ; REN XUEZHI ; BAI JIARUI ; ZHAO JIAN ; WANG SHENGLI ; CHENG WEI ; HONG WEIXIN</creator><creatorcontrib>WANG LEI ; LIU ZHIGANG ; FAN MENGQI ; WANG ZITIAN ; REN XUEZHI ; BAI JIARUI ; ZHAO JIAN ; WANG SHENGLI ; CHENG WEI ; HONG WEIXIN</creatorcontrib><description>The invention discloses a frame structure bridge jacking construction control method, solves the problem of how to improve the frame structure bridge jacking construction efficiency, and belongs to the technical field of frame structure bridge jacking precision control. The construction method comprises the steps that 1, a plurality of cross beams are arranged in a construction area, the positions of the cross beams are determined, the cross beams divide the construction area into a plurality of blocks and surround the construction area, and foundation trenches are formed in the cross beams in the construction area; 2, steel bars are placed in the foundation trench; 3, concrete is poured at the cross beam; and 4, frame structure bridge jacking construction is carried out, horizontal deviation remeasurement is carried out every time a pickaxe is jacked in the construction process, and the jacking direction is adjusted in time. The cross beam is used for replacing a sliding plate, the operation efficiency and c</description><language>chi ; eng</language><subject>ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTIONOF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, ORTHE LIKE ; ASSEMBLY OF BRIDGES ; CONSTRUCTION OF BRIDGES ; CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES ; FIXED CONSTRUCTIONS ; OR VIADUCTS</subject><creationdate>2022</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20220729&amp;DB=EPODOC&amp;CC=CN&amp;NR=114808735A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76289</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20220729&amp;DB=EPODOC&amp;CC=CN&amp;NR=114808735A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>WANG LEI</creatorcontrib><creatorcontrib>LIU ZHIGANG</creatorcontrib><creatorcontrib>FAN MENGQI</creatorcontrib><creatorcontrib>WANG ZITIAN</creatorcontrib><creatorcontrib>REN XUEZHI</creatorcontrib><creatorcontrib>BAI JIARUI</creatorcontrib><creatorcontrib>ZHAO JIAN</creatorcontrib><creatorcontrib>WANG SHENGLI</creatorcontrib><creatorcontrib>CHENG WEI</creatorcontrib><creatorcontrib>HONG WEIXIN</creatorcontrib><title>Jacking construction control method for frame structure bridge</title><description>The invention discloses a frame structure bridge jacking construction control method, solves the problem of how to improve the frame structure bridge jacking construction efficiency, and belongs to the technical field of frame structure bridge jacking precision control. The construction method comprises the steps that 1, a plurality of cross beams are arranged in a construction area, the positions of the cross beams are determined, the cross beams divide the construction area into a plurality of blocks and surround the construction area, and foundation trenches are formed in the cross beams in the construction area; 2, steel bars are placed in the foundation trench; 3, concrete is poured at the cross beam; and 4, frame structure bridge jacking construction is carried out, horizontal deviation remeasurement is carried out every time a pickaxe is jacked in the construction process, and the jacking direction is adjusted in time. The cross beam is used for replacing a sliding plate, the operation efficiency and c</description><subject>ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTIONOF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, ORTHE LIKE</subject><subject>ASSEMBLY OF BRIDGES</subject><subject>CONSTRUCTION OF BRIDGES</subject><subject>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</subject><subject>FIXED CONSTRUCTIONS</subject><subject>OR VIADUCTS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2022</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZLDzSkzOzsxLV0jOzysuKSpNLsnMzwNxSorycxRyU0sy8lMU0vKLFNKKEnNTFSBKSotSFZKKMlPSU3kYWNMSc4pTeaE0N4Oim2uIs4duakF-fGpxQWJyal5qSbyzn6GhiYWBhbmxqaMxMWoAnjIxIw</recordid><startdate>20220729</startdate><enddate>20220729</enddate><creator>WANG LEI</creator><creator>LIU ZHIGANG</creator><creator>FAN MENGQI</creator><creator>WANG ZITIAN</creator><creator>REN XUEZHI</creator><creator>BAI JIARUI</creator><creator>ZHAO JIAN</creator><creator>WANG SHENGLI</creator><creator>CHENG WEI</creator><creator>HONG WEIXIN</creator><scope>EVB</scope></search><sort><creationdate>20220729</creationdate><title>Jacking construction control method for frame structure bridge</title><author>WANG LEI ; LIU ZHIGANG ; FAN MENGQI ; WANG ZITIAN ; REN XUEZHI ; BAI JIARUI ; ZHAO JIAN ; WANG SHENGLI ; CHENG WEI ; HONG WEIXIN</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN114808735A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2022</creationdate><topic>ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTIONOF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, ORTHE LIKE</topic><topic>ASSEMBLY OF BRIDGES</topic><topic>CONSTRUCTION OF BRIDGES</topic><topic>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</topic><topic>FIXED CONSTRUCTIONS</topic><topic>OR VIADUCTS</topic><toplevel>online_resources</toplevel><creatorcontrib>WANG LEI</creatorcontrib><creatorcontrib>LIU ZHIGANG</creatorcontrib><creatorcontrib>FAN MENGQI</creatorcontrib><creatorcontrib>WANG ZITIAN</creatorcontrib><creatorcontrib>REN XUEZHI</creatorcontrib><creatorcontrib>BAI JIARUI</creatorcontrib><creatorcontrib>ZHAO JIAN</creatorcontrib><creatorcontrib>WANG SHENGLI</creatorcontrib><creatorcontrib>CHENG WEI</creatorcontrib><creatorcontrib>HONG WEIXIN</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>WANG LEI</au><au>LIU ZHIGANG</au><au>FAN MENGQI</au><au>WANG ZITIAN</au><au>REN XUEZHI</au><au>BAI JIARUI</au><au>ZHAO JIAN</au><au>WANG SHENGLI</au><au>CHENG WEI</au><au>HONG WEIXIN</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Jacking construction control method for frame structure bridge</title><date>2022-07-29</date><risdate>2022</risdate><abstract>The invention discloses a frame structure bridge jacking construction control method, solves the problem of how to improve the frame structure bridge jacking construction efficiency, and belongs to the technical field of frame structure bridge jacking precision control. The construction method comprises the steps that 1, a plurality of cross beams are arranged in a construction area, the positions of the cross beams are determined, the cross beams divide the construction area into a plurality of blocks and surround the construction area, and foundation trenches are formed in the cross beams in the construction area; 2, steel bars are placed in the foundation trench; 3, concrete is poured at the cross beam; and 4, frame structure bridge jacking construction is carried out, horizontal deviation remeasurement is carried out every time a pickaxe is jacked in the construction process, and the jacking direction is adjusted in time. The cross beam is used for replacing a sliding plate, the operation efficiency and c</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN114808735A
source esp@cenet
subjects ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTIONOF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, ORTHE LIKE
ASSEMBLY OF BRIDGES
CONSTRUCTION OF BRIDGES
CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
FIXED CONSTRUCTIONS
OR VIADUCTS
title Jacking construction control method for frame structure bridge
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-10T03%3A09%3A26IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=WANG%20LEI&rft.date=2022-07-29&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN114808735A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true