Construction method for reinforcing foundation pit of overpass rail transit
The invention relates to the technical field of upper-span rail transit foundation pit reinforcement construction, in particular to an upper-span rail transit foundation pit reinforcement construction method, which adopts a mode of combining MJS construction method piles and three-shaft mixing piles...
Gespeichert in:
Hauptverfasser: | , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | ZHOU GUO ZHAO SHUAIPEI WANG ZHONGSHENG CHENG FANGCHENG SUN SIXIN |
description | The invention relates to the technical field of upper-span rail transit foundation pit reinforcement construction, in particular to an upper-span rail transit foundation pit reinforcement construction method, which adopts a mode of combining MJS construction method piles and three-shaft mixing piles to greatly improve the construction speed and control the deformation of an existing subway tunnel within an allowable range. After construction parameters of the three-axis stirring piles and the MJS construction method piles are determined through experiments, foundation pit reinforcement construction is started, the three-axis stirring piles are constructed firstly for foundation pit reinforcement of the overpass rail transit, and then the MJS construction method piles are constructed after the three-axis stirring piles reach certain strength.
本发明涉及上跨轨道交通基坑加固施工的技术领域,特别是涉及一种上跨轨道交通基坑加固施工方法,其采用MJS工法桩和三轴搅拌桩相结合的方式能大大提高施工速度,同时控制既有地铁隧道变形在允许范围内;通过实验确定三轴搅拌桩及MJS工法桩施工参数后,开始基坑加固施工,上跨轨道交通基坑加固先施工三轴搅拌桩,待三轴搅拌桩达到一定强度后,再施工MJS工法桩 |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN114753378A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN114753378A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN114753378A3</originalsourceid><addsrcrecordid>eNqNykEKwjAQQNFsXIh6h_EALkqUui1BEQRX7suQTjRQZ8Jk6vkt4gFcPT78pbsG4Wo6RcvC8CJ7ygBJFJQyz8bMj7knHvB7lGwgCeRNWrBWUMwjmCLXbGu3SDhW2vxcue35dA-XHRXpqRaMxGR9uDXNvj143x47_8_zAcdsNkI</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Construction method for reinforcing foundation pit of overpass rail transit</title><source>esp@cenet</source><creator>ZHOU GUO ; ZHAO SHUAIPEI ; WANG ZHONGSHENG ; CHENG FANGCHENG ; SUN SIXIN</creator><creatorcontrib>ZHOU GUO ; ZHAO SHUAIPEI ; WANG ZHONGSHENG ; CHENG FANGCHENG ; SUN SIXIN</creatorcontrib><description>The invention relates to the technical field of upper-span rail transit foundation pit reinforcement construction, in particular to an upper-span rail transit foundation pit reinforcement construction method, which adopts a mode of combining MJS construction method piles and three-shaft mixing piles to greatly improve the construction speed and control the deformation of an existing subway tunnel within an allowable range. After construction parameters of the three-axis stirring piles and the MJS construction method piles are determined through experiments, foundation pit reinforcement construction is started, the three-axis stirring piles are constructed firstly for foundation pit reinforcement of the overpass rail transit, and then the MJS construction method piles are constructed after the three-axis stirring piles reach certain strength.
本发明涉及上跨轨道交通基坑加固施工的技术领域,特别是涉及一种上跨轨道交通基坑加固施工方法,其采用MJS工法桩和三轴搅拌桩相结合的方式能大大提高施工速度,同时控制既有地铁隧道变形在允许范围内;通过实验确定三轴搅拌桩及MJS工法桩施工参数后,开始基坑加固施工,上跨轨道交通基坑加固先施工三轴搅拌桩,待三轴搅拌桩达到一定强度后,再施工MJS工法桩</description><language>chi ; eng</language><subject>EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; SOIL SHIFTING ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>2022</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20220715&DB=EPODOC&CC=CN&NR=114753378A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20220715&DB=EPODOC&CC=CN&NR=114753378A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>ZHOU GUO</creatorcontrib><creatorcontrib>ZHAO SHUAIPEI</creatorcontrib><creatorcontrib>WANG ZHONGSHENG</creatorcontrib><creatorcontrib>CHENG FANGCHENG</creatorcontrib><creatorcontrib>SUN SIXIN</creatorcontrib><title>Construction method for reinforcing foundation pit of overpass rail transit</title><description>The invention relates to the technical field of upper-span rail transit foundation pit reinforcement construction, in particular to an upper-span rail transit foundation pit reinforcement construction method, which adopts a mode of combining MJS construction method piles and three-shaft mixing piles to greatly improve the construction speed and control the deformation of an existing subway tunnel within an allowable range. After construction parameters of the three-axis stirring piles and the MJS construction method piles are determined through experiments, foundation pit reinforcement construction is started, the three-axis stirring piles are constructed firstly for foundation pit reinforcement of the overpass rail transit, and then the MJS construction method piles are constructed after the three-axis stirring piles reach certain strength.
本发明涉及上跨轨道交通基坑加固施工的技术领域,特别是涉及一种上跨轨道交通基坑加固施工方法,其采用MJS工法桩和三轴搅拌桩相结合的方式能大大提高施工速度,同时控制既有地铁隧道变形在允许范围内;通过实验确定三轴搅拌桩及MJS工法桩施工参数后,开始基坑加固施工,上跨轨道交通基坑加固先施工三轴搅拌桩,待三轴搅拌桩达到一定强度后,再施工MJS工法桩</description><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>SOIL SHIFTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2022</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNykEKwjAQQNFsXIh6h_EALkqUui1BEQRX7suQTjRQZ8Jk6vkt4gFcPT78pbsG4Wo6RcvC8CJ7ygBJFJQyz8bMj7knHvB7lGwgCeRNWrBWUMwjmCLXbGu3SDhW2vxcue35dA-XHRXpqRaMxGR9uDXNvj143x47_8_zAcdsNkI</recordid><startdate>20220715</startdate><enddate>20220715</enddate><creator>ZHOU GUO</creator><creator>ZHAO SHUAIPEI</creator><creator>WANG ZHONGSHENG</creator><creator>CHENG FANGCHENG</creator><creator>SUN SIXIN</creator><scope>EVB</scope></search><sort><creationdate>20220715</creationdate><title>Construction method for reinforcing foundation pit of overpass rail transit</title><author>ZHOU GUO ; ZHAO SHUAIPEI ; WANG ZHONGSHENG ; CHENG FANGCHENG ; SUN SIXIN</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN114753378A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2022</creationdate><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>SOIL SHIFTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>ZHOU GUO</creatorcontrib><creatorcontrib>ZHAO SHUAIPEI</creatorcontrib><creatorcontrib>WANG ZHONGSHENG</creatorcontrib><creatorcontrib>CHENG FANGCHENG</creatorcontrib><creatorcontrib>SUN SIXIN</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>ZHOU GUO</au><au>ZHAO SHUAIPEI</au><au>WANG ZHONGSHENG</au><au>CHENG FANGCHENG</au><au>SUN SIXIN</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Construction method for reinforcing foundation pit of overpass rail transit</title><date>2022-07-15</date><risdate>2022</risdate><abstract>The invention relates to the technical field of upper-span rail transit foundation pit reinforcement construction, in particular to an upper-span rail transit foundation pit reinforcement construction method, which adopts a mode of combining MJS construction method piles and three-shaft mixing piles to greatly improve the construction speed and control the deformation of an existing subway tunnel within an allowable range. After construction parameters of the three-axis stirring piles and the MJS construction method piles are determined through experiments, foundation pit reinforcement construction is started, the three-axis stirring piles are constructed firstly for foundation pit reinforcement of the overpass rail transit, and then the MJS construction method piles are constructed after the three-axis stirring piles reach certain strength.
本发明涉及上跨轨道交通基坑加固施工的技术领域,特别是涉及一种上跨轨道交通基坑加固施工方法,其采用MJS工法桩和三轴搅拌桩相结合的方式能大大提高施工速度,同时控制既有地铁隧道变形在允许范围内;通过实验确定三轴搅拌桩及MJS工法桩施工参数后,开始基坑加固施工,上跨轨道交通基坑加固先施工三轴搅拌桩,待三轴搅拌桩达到一定强度后,再施工MJS工法桩</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN114753378A |
source | esp@cenet |
subjects | EMBANKMENTS EXCAVATIONS FIXED CONSTRUCTIONS FOUNDATIONS HYDRAULIC ENGINEERING SOIL SHIFTING UNDERGROUND OR UNDERWATER STRUCTURES |
title | Construction method for reinforcing foundation pit of overpass rail transit |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-03T10%3A55%3A07IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=ZHOU%20GUO&rft.date=2022-07-15&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN114753378A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |