Leader cockpit system control method based on BIM intelligent construction site

The invention discloses a leader cockpit system control method based on a BIM intelligent construction site, and the method comprises the following steps: 1, a cockpit system architecture is divided into three layers, namely a terminal layer, an access layer and a wall display system, and the access...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: SHENG QUANGUO, WANG YIAN, XUAN YANG, GAO RONGHUA, ZHANG LONGLIANG, LIU YUJIAN, KONG TAO, JI XINCHAO, DU ZHE, YAO HANBIN
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator SHENG QUANGUO
WANG YIAN
XUAN YANG
GAO RONGHUA
ZHANG LONGLIANG
LIU YUJIAN
KONG TAO
JI XINCHAO
DU ZHE
YAO HANBIN
description The invention discloses a leader cockpit system control method based on a BIM intelligent construction site, and the method comprises the following steps: 1, a cockpit system architecture is divided into three layers, namely a terminal layer, an access layer and a wall display system, and the access layer can be divided into a platform layer and an application layer; the system has the beneficial effects that the signal transmitter laid on the construction site is adopted, so that the system can transmit a 5G signal to an access layer by using a WLAN (Wireless Local Area Network) technology, and the stability and rapidness of data transmission can be ensured; according to the system, the comparison module is arranged in the cockpit system, the existing construction site state can be compared with the standard construction site state through the comparison module, the comparison result is displayed through the wall display system, a user of the cockpit system can further master the construction site convenient
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN114745605A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN114745605A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN114745605A3</originalsourceid><addsrcrecordid>eNqNik0KwjAUBrNxIeodngcQLLZ2rUVR8GfjvsTkU4NpEvKeC29vBQ_gahhmhup8gLbIZKJ5JifEbxZ0vQbJ0VMHeURLV82wFAOt90dyQeC9uyPI92PJLyOuj-wEYzW4ac-Y_DhS0-3m0uxmSLEFJ20QIG1zKoqyLqvlvFot_nk-Xco3DA</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Leader cockpit system control method based on BIM intelligent construction site</title><source>esp@cenet</source><creator>SHENG QUANGUO ; WANG YIAN ; XUAN YANG ; GAO RONGHUA ; ZHANG LONGLIANG ; LIU YUJIAN ; KONG TAO ; JI XINCHAO ; DU ZHE ; YAO HANBIN</creator><creatorcontrib>SHENG QUANGUO ; WANG YIAN ; XUAN YANG ; GAO RONGHUA ; ZHANG LONGLIANG ; LIU YUJIAN ; KONG TAO ; JI XINCHAO ; DU ZHE ; YAO HANBIN</creatorcontrib><description>The invention discloses a leader cockpit system control method based on a BIM intelligent construction site, and the method comprises the following steps: 1, a cockpit system architecture is divided into three layers, namely a terminal layer, an access layer and a wall display system, and the access layer can be divided into a platform layer and an application layer; the system has the beneficial effects that the signal transmitter laid on the construction site is adopted, so that the system can transmit a 5G signal to an access layer by using a WLAN (Wireless Local Area Network) technology, and the stability and rapidness of data transmission can be ensured; according to the system, the comparison module is arranged in the cockpit system, the existing construction site state can be compared with the standard construction site state through the comparison module, the comparison result is displayed through the wall display system, a user of the cockpit system can further master the construction site convenient</description><language>chi ; eng</language><subject>ALARM SYSTEMS ; ELECTRIC COMMUNICATION TECHNIQUE ; ELECTRICITY ; INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTEDFOR SPECIFIC APPLICATION FIELDS ; ORDER TELEGRAPHS ; PHYSICS ; SELECTING ; SIGNALLING ; SIGNALLING OR CALLING SYSTEMS ; WIRELESS COMMUNICATIONS NETWORKS</subject><creationdate>2022</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20220712&amp;DB=EPODOC&amp;CC=CN&amp;NR=114745605A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76289</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20220712&amp;DB=EPODOC&amp;CC=CN&amp;NR=114745605A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>SHENG QUANGUO</creatorcontrib><creatorcontrib>WANG YIAN</creatorcontrib><creatorcontrib>XUAN YANG</creatorcontrib><creatorcontrib>GAO RONGHUA</creatorcontrib><creatorcontrib>ZHANG LONGLIANG</creatorcontrib><creatorcontrib>LIU YUJIAN</creatorcontrib><creatorcontrib>KONG TAO</creatorcontrib><creatorcontrib>JI XINCHAO</creatorcontrib><creatorcontrib>DU ZHE</creatorcontrib><creatorcontrib>YAO HANBIN</creatorcontrib><title>Leader cockpit system control method based on BIM intelligent construction site</title><description>The invention discloses a leader cockpit system control method based on a BIM intelligent construction site, and the method comprises the following steps: 1, a cockpit system architecture is divided into three layers, namely a terminal layer, an access layer and a wall display system, and the access layer can be divided into a platform layer and an application layer; the system has the beneficial effects that the signal transmitter laid on the construction site is adopted, so that the system can transmit a 5G signal to an access layer by using a WLAN (Wireless Local Area Network) technology, and the stability and rapidness of data transmission can be ensured; according to the system, the comparison module is arranged in the cockpit system, the existing construction site state can be compared with the standard construction site state through the comparison module, the comparison result is displayed through the wall display system, a user of the cockpit system can further master the construction site convenient</description><subject>ALARM SYSTEMS</subject><subject>ELECTRIC COMMUNICATION TECHNIQUE</subject><subject>ELECTRICITY</subject><subject>INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTEDFOR SPECIFIC APPLICATION FIELDS</subject><subject>ORDER TELEGRAPHS</subject><subject>PHYSICS</subject><subject>SELECTING</subject><subject>SIGNALLING</subject><subject>SIGNALLING OR CALLING SYSTEMS</subject><subject>WIRELESS COMMUNICATIONS NETWORKS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2022</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNik0KwjAUBrNxIeodngcQLLZ2rUVR8GfjvsTkU4NpEvKeC29vBQ_gahhmhup8gLbIZKJ5JifEbxZ0vQbJ0VMHeURLV82wFAOt90dyQeC9uyPI92PJLyOuj-wEYzW4ac-Y_DhS0-3m0uxmSLEFJ20QIG1zKoqyLqvlvFot_nk-Xco3DA</recordid><startdate>20220712</startdate><enddate>20220712</enddate><creator>SHENG QUANGUO</creator><creator>WANG YIAN</creator><creator>XUAN YANG</creator><creator>GAO RONGHUA</creator><creator>ZHANG LONGLIANG</creator><creator>LIU YUJIAN</creator><creator>KONG TAO</creator><creator>JI XINCHAO</creator><creator>DU ZHE</creator><creator>YAO HANBIN</creator><scope>EVB</scope></search><sort><creationdate>20220712</creationdate><title>Leader cockpit system control method based on BIM intelligent construction site</title><author>SHENG QUANGUO ; WANG YIAN ; XUAN YANG ; GAO RONGHUA ; ZHANG LONGLIANG ; LIU YUJIAN ; KONG TAO ; JI XINCHAO ; DU ZHE ; YAO HANBIN</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN114745605A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2022</creationdate><topic>ALARM SYSTEMS</topic><topic>ELECTRIC COMMUNICATION TECHNIQUE</topic><topic>ELECTRICITY</topic><topic>INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTEDFOR SPECIFIC APPLICATION FIELDS</topic><topic>ORDER TELEGRAPHS</topic><topic>PHYSICS</topic><topic>SELECTING</topic><topic>SIGNALLING</topic><topic>SIGNALLING OR CALLING SYSTEMS</topic><topic>WIRELESS COMMUNICATIONS NETWORKS</topic><toplevel>online_resources</toplevel><creatorcontrib>SHENG QUANGUO</creatorcontrib><creatorcontrib>WANG YIAN</creatorcontrib><creatorcontrib>XUAN YANG</creatorcontrib><creatorcontrib>GAO RONGHUA</creatorcontrib><creatorcontrib>ZHANG LONGLIANG</creatorcontrib><creatorcontrib>LIU YUJIAN</creatorcontrib><creatorcontrib>KONG TAO</creatorcontrib><creatorcontrib>JI XINCHAO</creatorcontrib><creatorcontrib>DU ZHE</creatorcontrib><creatorcontrib>YAO HANBIN</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>SHENG QUANGUO</au><au>WANG YIAN</au><au>XUAN YANG</au><au>GAO RONGHUA</au><au>ZHANG LONGLIANG</au><au>LIU YUJIAN</au><au>KONG TAO</au><au>JI XINCHAO</au><au>DU ZHE</au><au>YAO HANBIN</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Leader cockpit system control method based on BIM intelligent construction site</title><date>2022-07-12</date><risdate>2022</risdate><abstract>The invention discloses a leader cockpit system control method based on a BIM intelligent construction site, and the method comprises the following steps: 1, a cockpit system architecture is divided into three layers, namely a terminal layer, an access layer and a wall display system, and the access layer can be divided into a platform layer and an application layer; the system has the beneficial effects that the signal transmitter laid on the construction site is adopted, so that the system can transmit a 5G signal to an access layer by using a WLAN (Wireless Local Area Network) technology, and the stability and rapidness of data transmission can be ensured; according to the system, the comparison module is arranged in the cockpit system, the existing construction site state can be compared with the standard construction site state through the comparison module, the comparison result is displayed through the wall display system, a user of the cockpit system can further master the construction site convenient</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN114745605A
source esp@cenet
subjects ALARM SYSTEMS
ELECTRIC COMMUNICATION TECHNIQUE
ELECTRICITY
INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTEDFOR SPECIFIC APPLICATION FIELDS
ORDER TELEGRAPHS
PHYSICS
SELECTING
SIGNALLING
SIGNALLING OR CALLING SYSTEMS
WIRELESS COMMUNICATIONS NETWORKS
title Leader cockpit system control method based on BIM intelligent construction site
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-04T11%3A03%3A22IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=SHENG%20QUANGUO&rft.date=2022-07-12&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN114745605A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true