Leader cockpit system control method based on BIM intelligent construction site
The invention discloses a leader cockpit system control method based on a BIM intelligent construction site, and the method comprises the following steps: 1, a cockpit system architecture is divided into three layers, namely a terminal layer, an access layer and a wall display system, and the access...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | SHENG QUANGUO WANG YIAN XUAN YANG GAO RONGHUA ZHANG LONGLIANG LIU YUJIAN KONG TAO JI XINCHAO DU ZHE YAO HANBIN |
description | The invention discloses a leader cockpit system control method based on a BIM intelligent construction site, and the method comprises the following steps: 1, a cockpit system architecture is divided into three layers, namely a terminal layer, an access layer and a wall display system, and the access layer can be divided into a platform layer and an application layer; the system has the beneficial effects that the signal transmitter laid on the construction site is adopted, so that the system can transmit a 5G signal to an access layer by using a WLAN (Wireless Local Area Network) technology, and the stability and rapidness of data transmission can be ensured; according to the system, the comparison module is arranged in the cockpit system, the existing construction site state can be compared with the standard construction site state through the comparison module, the comparison result is displayed through the wall display system, a user of the cockpit system can further master the construction site convenient |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN114745605A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN114745605A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN114745605A3</originalsourceid><addsrcrecordid>eNqNik0KwjAUBrNxIeodngcQLLZ2rUVR8GfjvsTkU4NpEvKeC29vBQ_gahhmhup8gLbIZKJ5JifEbxZ0vQbJ0VMHeURLV82wFAOt90dyQeC9uyPI92PJLyOuj-wEYzW4ac-Y_DhS0-3m0uxmSLEFJ20QIG1zKoqyLqvlvFot_nk-Xco3DA</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Leader cockpit system control method based on BIM intelligent construction site</title><source>esp@cenet</source><creator>SHENG QUANGUO ; WANG YIAN ; XUAN YANG ; GAO RONGHUA ; ZHANG LONGLIANG ; LIU YUJIAN ; KONG TAO ; JI XINCHAO ; DU ZHE ; YAO HANBIN</creator><creatorcontrib>SHENG QUANGUO ; WANG YIAN ; XUAN YANG ; GAO RONGHUA ; ZHANG LONGLIANG ; LIU YUJIAN ; KONG TAO ; JI XINCHAO ; DU ZHE ; YAO HANBIN</creatorcontrib><description>The invention discloses a leader cockpit system control method based on a BIM intelligent construction site, and the method comprises the following steps: 1, a cockpit system architecture is divided into three layers, namely a terminal layer, an access layer and a wall display system, and the access layer can be divided into a platform layer and an application layer; the system has the beneficial effects that the signal transmitter laid on the construction site is adopted, so that the system can transmit a 5G signal to an access layer by using a WLAN (Wireless Local Area Network) technology, and the stability and rapidness of data transmission can be ensured; according to the system, the comparison module is arranged in the cockpit system, the existing construction site state can be compared with the standard construction site state through the comparison module, the comparison result is displayed through the wall display system, a user of the cockpit system can further master the construction site convenient</description><language>chi ; eng</language><subject>ALARM SYSTEMS ; ELECTRIC COMMUNICATION TECHNIQUE ; ELECTRICITY ; INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTEDFOR SPECIFIC APPLICATION FIELDS ; ORDER TELEGRAPHS ; PHYSICS ; SELECTING ; SIGNALLING ; SIGNALLING OR CALLING SYSTEMS ; WIRELESS COMMUNICATIONS NETWORKS</subject><creationdate>2022</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20220712&DB=EPODOC&CC=CN&NR=114745605A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76289</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20220712&DB=EPODOC&CC=CN&NR=114745605A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>SHENG QUANGUO</creatorcontrib><creatorcontrib>WANG YIAN</creatorcontrib><creatorcontrib>XUAN YANG</creatorcontrib><creatorcontrib>GAO RONGHUA</creatorcontrib><creatorcontrib>ZHANG LONGLIANG</creatorcontrib><creatorcontrib>LIU YUJIAN</creatorcontrib><creatorcontrib>KONG TAO</creatorcontrib><creatorcontrib>JI XINCHAO</creatorcontrib><creatorcontrib>DU ZHE</creatorcontrib><creatorcontrib>YAO HANBIN</creatorcontrib><title>Leader cockpit system control method based on BIM intelligent construction site</title><description>The invention discloses a leader cockpit system control method based on a BIM intelligent construction site, and the method comprises the following steps: 1, a cockpit system architecture is divided into three layers, namely a terminal layer, an access layer and a wall display system, and the access layer can be divided into a platform layer and an application layer; the system has the beneficial effects that the signal transmitter laid on the construction site is adopted, so that the system can transmit a 5G signal to an access layer by using a WLAN (Wireless Local Area Network) technology, and the stability and rapidness of data transmission can be ensured; according to the system, the comparison module is arranged in the cockpit system, the existing construction site state can be compared with the standard construction site state through the comparison module, the comparison result is displayed through the wall display system, a user of the cockpit system can further master the construction site convenient</description><subject>ALARM SYSTEMS</subject><subject>ELECTRIC COMMUNICATION TECHNIQUE</subject><subject>ELECTRICITY</subject><subject>INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTEDFOR SPECIFIC APPLICATION FIELDS</subject><subject>ORDER TELEGRAPHS</subject><subject>PHYSICS</subject><subject>SELECTING</subject><subject>SIGNALLING</subject><subject>SIGNALLING OR CALLING SYSTEMS</subject><subject>WIRELESS COMMUNICATIONS NETWORKS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2022</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNik0KwjAUBrNxIeodngcQLLZ2rUVR8GfjvsTkU4NpEvKeC29vBQ_gahhmhup8gLbIZKJ5JifEbxZ0vQbJ0VMHeURLV82wFAOt90dyQeC9uyPI92PJLyOuj-wEYzW4ac-Y_DhS0-3m0uxmSLEFJ20QIG1zKoqyLqvlvFot_nk-Xco3DA</recordid><startdate>20220712</startdate><enddate>20220712</enddate><creator>SHENG QUANGUO</creator><creator>WANG YIAN</creator><creator>XUAN YANG</creator><creator>GAO RONGHUA</creator><creator>ZHANG LONGLIANG</creator><creator>LIU YUJIAN</creator><creator>KONG TAO</creator><creator>JI XINCHAO</creator><creator>DU ZHE</creator><creator>YAO HANBIN</creator><scope>EVB</scope></search><sort><creationdate>20220712</creationdate><title>Leader cockpit system control method based on BIM intelligent construction site</title><author>SHENG QUANGUO ; WANG YIAN ; XUAN YANG ; GAO RONGHUA ; ZHANG LONGLIANG ; LIU YUJIAN ; KONG TAO ; JI XINCHAO ; DU ZHE ; YAO HANBIN</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN114745605A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2022</creationdate><topic>ALARM SYSTEMS</topic><topic>ELECTRIC COMMUNICATION TECHNIQUE</topic><topic>ELECTRICITY</topic><topic>INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTEDFOR SPECIFIC APPLICATION FIELDS</topic><topic>ORDER TELEGRAPHS</topic><topic>PHYSICS</topic><topic>SELECTING</topic><topic>SIGNALLING</topic><topic>SIGNALLING OR CALLING SYSTEMS</topic><topic>WIRELESS COMMUNICATIONS NETWORKS</topic><toplevel>online_resources</toplevel><creatorcontrib>SHENG QUANGUO</creatorcontrib><creatorcontrib>WANG YIAN</creatorcontrib><creatorcontrib>XUAN YANG</creatorcontrib><creatorcontrib>GAO RONGHUA</creatorcontrib><creatorcontrib>ZHANG LONGLIANG</creatorcontrib><creatorcontrib>LIU YUJIAN</creatorcontrib><creatorcontrib>KONG TAO</creatorcontrib><creatorcontrib>JI XINCHAO</creatorcontrib><creatorcontrib>DU ZHE</creatorcontrib><creatorcontrib>YAO HANBIN</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>SHENG QUANGUO</au><au>WANG YIAN</au><au>XUAN YANG</au><au>GAO RONGHUA</au><au>ZHANG LONGLIANG</au><au>LIU YUJIAN</au><au>KONG TAO</au><au>JI XINCHAO</au><au>DU ZHE</au><au>YAO HANBIN</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Leader cockpit system control method based on BIM intelligent construction site</title><date>2022-07-12</date><risdate>2022</risdate><abstract>The invention discloses a leader cockpit system control method based on a BIM intelligent construction site, and the method comprises the following steps: 1, a cockpit system architecture is divided into three layers, namely a terminal layer, an access layer and a wall display system, and the access layer can be divided into a platform layer and an application layer; the system has the beneficial effects that the signal transmitter laid on the construction site is adopted, so that the system can transmit a 5G signal to an access layer by using a WLAN (Wireless Local Area Network) technology, and the stability and rapidness of data transmission can be ensured; according to the system, the comparison module is arranged in the cockpit system, the existing construction site state can be compared with the standard construction site state through the comparison module, the comparison result is displayed through the wall display system, a user of the cockpit system can further master the construction site convenient</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN114745605A |
source | esp@cenet |
subjects | ALARM SYSTEMS ELECTRIC COMMUNICATION TECHNIQUE ELECTRICITY INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTEDFOR SPECIFIC APPLICATION FIELDS ORDER TELEGRAPHS PHYSICS SELECTING SIGNALLING SIGNALLING OR CALLING SYSTEMS WIRELESS COMMUNICATIONS NETWORKS |
title | Leader cockpit system control method based on BIM intelligent construction site |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-04T11%3A03%3A22IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=SHENG%20QUANGUO&rft.date=2022-07-12&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN114745605A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |