Cooperative anchoring structure for enhancing stability of gob-side entry driving coal pillar and construction method

The invention relates to a collaborative anchoring structure for enhancing the stability of a gob-side entry driving coal pillar and a construction method, belongs to the technical field of gob-side entry driving coal pillar retaining mining, and solves the problem that an existing anchoring structu...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: YU WENKAI, DU HENG, JIA BO, TIAN WEIBIAO, XU JUNFENG, ZHANG YOUFEI, AN YUBO, XIAN YANG, CAO ZUOYONG, QI CHAOXIN, LAN HONG, XU WENFA, LONG JINGKUI, TAO XIAO
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator YU WENKAI
DU HENG
JIA BO
TIAN WEIBIAO
XU JUNFENG
ZHANG YOUFEI
AN YUBO
XIAN YANG
CAO ZUOYONG
QI CHAOXIN
LAN HONG
XU WENFA
LONG JINGKUI
TAO XIAO
description The invention relates to a collaborative anchoring structure for enhancing the stability of a gob-side entry driving coal pillar and a construction method, belongs to the technical field of gob-side entry driving coal pillar retaining mining, and solves the problem that an existing anchoring structure cannot meet the safety and stability requirements of a roadway. The construction method of the collaborative anchoring structure for enhancing the stability of the gob-side entry driving coal pillar comprises the steps that after an anchor net on the lower side of a roadway is laid, a first anchor cable is drilled; after drilling of a row of first anchor cables in the height direction of the lower side of the C roadway is completed, a first steel belt is used for interlocking the multiple first anchor cables in the row; in the tunneling process of the B face D roadway, the first anchor cable is installed to be located at the exposed end of the upper side of the D roadway. According to the collaborative anchoring
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN114704267A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN114704267A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN114704267A3</originalsourceid><addsrcrecordid>eNqNjEEOgjAQRdm4MOodxgOQiBJZG6Jx5co9Ke0Ak5ROMy0k3N4aPICrn__fy99mU83sUVSkGUE5PbCQ6yFEmXScBKFjAXRDQuuuWrIUF-AOem7zQAYTj7KAEZq_jmZlwZO1StKjSd2td8QORowDm3226ZQNePjlLjs-7u_6maPnBoNXGh3Gpn4VRVmdyvO1ul3-cT5gv0YU</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Cooperative anchoring structure for enhancing stability of gob-side entry driving coal pillar and construction method</title><source>esp@cenet</source><creator>YU WENKAI ; DU HENG ; JIA BO ; TIAN WEIBIAO ; XU JUNFENG ; ZHANG YOUFEI ; AN YUBO ; XIAN YANG ; CAO ZUOYONG ; QI CHAOXIN ; LAN HONG ; XU WENFA ; LONG JINGKUI ; TAO XIAO</creator><creatorcontrib>YU WENKAI ; DU HENG ; JIA BO ; TIAN WEIBIAO ; XU JUNFENG ; ZHANG YOUFEI ; AN YUBO ; XIAN YANG ; CAO ZUOYONG ; QI CHAOXIN ; LAN HONG ; XU WENFA ; LONG JINGKUI ; TAO XIAO</creatorcontrib><description>The invention relates to a collaborative anchoring structure for enhancing the stability of a gob-side entry driving coal pillar and a construction method, belongs to the technical field of gob-side entry driving coal pillar retaining mining, and solves the problem that an existing anchoring structure cannot meet the safety and stability requirements of a roadway. The construction method of the collaborative anchoring structure for enhancing the stability of the gob-side entry driving coal pillar comprises the steps that after an anchor net on the lower side of a roadway is laid, a first anchor cable is drilled; after drilling of a row of first anchor cables in the height direction of the lower side of the C roadway is completed, a first steel belt is used for interlocking the multiple first anchor cables in the row; in the tunneling process of the B face D roadway, the first anchor cable is installed to be located at the exposed end of the upper side of the D roadway. According to the collaborative anchoring</description><language>chi ; eng</language><subject>EARTH DRILLING ; FIXED CONSTRUCTIONS ; GALLERIES ; LARGE UNDERGROUND CHAMBERS ; MINING ; SHAFTS ; TUNNELS</subject><creationdate>2022</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20220705&amp;DB=EPODOC&amp;CC=CN&amp;NR=114704267A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76290</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20220705&amp;DB=EPODOC&amp;CC=CN&amp;NR=114704267A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>YU WENKAI</creatorcontrib><creatorcontrib>DU HENG</creatorcontrib><creatorcontrib>JIA BO</creatorcontrib><creatorcontrib>TIAN WEIBIAO</creatorcontrib><creatorcontrib>XU JUNFENG</creatorcontrib><creatorcontrib>ZHANG YOUFEI</creatorcontrib><creatorcontrib>AN YUBO</creatorcontrib><creatorcontrib>XIAN YANG</creatorcontrib><creatorcontrib>CAO ZUOYONG</creatorcontrib><creatorcontrib>QI CHAOXIN</creatorcontrib><creatorcontrib>LAN HONG</creatorcontrib><creatorcontrib>XU WENFA</creatorcontrib><creatorcontrib>LONG JINGKUI</creatorcontrib><creatorcontrib>TAO XIAO</creatorcontrib><title>Cooperative anchoring structure for enhancing stability of gob-side entry driving coal pillar and construction method</title><description>The invention relates to a collaborative anchoring structure for enhancing the stability of a gob-side entry driving coal pillar and a construction method, belongs to the technical field of gob-side entry driving coal pillar retaining mining, and solves the problem that an existing anchoring structure cannot meet the safety and stability requirements of a roadway. The construction method of the collaborative anchoring structure for enhancing the stability of the gob-side entry driving coal pillar comprises the steps that after an anchor net on the lower side of a roadway is laid, a first anchor cable is drilled; after drilling of a row of first anchor cables in the height direction of the lower side of the C roadway is completed, a first steel belt is used for interlocking the multiple first anchor cables in the row; in the tunneling process of the B face D roadway, the first anchor cable is installed to be located at the exposed end of the upper side of the D roadway. According to the collaborative anchoring</description><subject>EARTH DRILLING</subject><subject>FIXED CONSTRUCTIONS</subject><subject>GALLERIES</subject><subject>LARGE UNDERGROUND CHAMBERS</subject><subject>MINING</subject><subject>SHAFTS</subject><subject>TUNNELS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2022</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNjEEOgjAQRdm4MOodxgOQiBJZG6Jx5co9Ke0Ak5ROMy0k3N4aPICrn__fy99mU83sUVSkGUE5PbCQ6yFEmXScBKFjAXRDQuuuWrIUF-AOem7zQAYTj7KAEZq_jmZlwZO1StKjSd2td8QORowDm3226ZQNePjlLjs-7u_6maPnBoNXGh3Gpn4VRVmdyvO1ul3-cT5gv0YU</recordid><startdate>20220705</startdate><enddate>20220705</enddate><creator>YU WENKAI</creator><creator>DU HENG</creator><creator>JIA BO</creator><creator>TIAN WEIBIAO</creator><creator>XU JUNFENG</creator><creator>ZHANG YOUFEI</creator><creator>AN YUBO</creator><creator>XIAN YANG</creator><creator>CAO ZUOYONG</creator><creator>QI CHAOXIN</creator><creator>LAN HONG</creator><creator>XU WENFA</creator><creator>LONG JINGKUI</creator><creator>TAO XIAO</creator><scope>EVB</scope></search><sort><creationdate>20220705</creationdate><title>Cooperative anchoring structure for enhancing stability of gob-side entry driving coal pillar and construction method</title><author>YU WENKAI ; DU HENG ; JIA BO ; TIAN WEIBIAO ; XU JUNFENG ; ZHANG YOUFEI ; AN YUBO ; XIAN YANG ; CAO ZUOYONG ; QI CHAOXIN ; LAN HONG ; XU WENFA ; LONG JINGKUI ; TAO XIAO</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN114704267A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2022</creationdate><topic>EARTH DRILLING</topic><topic>FIXED CONSTRUCTIONS</topic><topic>GALLERIES</topic><topic>LARGE UNDERGROUND CHAMBERS</topic><topic>MINING</topic><topic>SHAFTS</topic><topic>TUNNELS</topic><toplevel>online_resources</toplevel><creatorcontrib>YU WENKAI</creatorcontrib><creatorcontrib>DU HENG</creatorcontrib><creatorcontrib>JIA BO</creatorcontrib><creatorcontrib>TIAN WEIBIAO</creatorcontrib><creatorcontrib>XU JUNFENG</creatorcontrib><creatorcontrib>ZHANG YOUFEI</creatorcontrib><creatorcontrib>AN YUBO</creatorcontrib><creatorcontrib>XIAN YANG</creatorcontrib><creatorcontrib>CAO ZUOYONG</creatorcontrib><creatorcontrib>QI CHAOXIN</creatorcontrib><creatorcontrib>LAN HONG</creatorcontrib><creatorcontrib>XU WENFA</creatorcontrib><creatorcontrib>LONG JINGKUI</creatorcontrib><creatorcontrib>TAO XIAO</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>YU WENKAI</au><au>DU HENG</au><au>JIA BO</au><au>TIAN WEIBIAO</au><au>XU JUNFENG</au><au>ZHANG YOUFEI</au><au>AN YUBO</au><au>XIAN YANG</au><au>CAO ZUOYONG</au><au>QI CHAOXIN</au><au>LAN HONG</au><au>XU WENFA</au><au>LONG JINGKUI</au><au>TAO XIAO</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Cooperative anchoring structure for enhancing stability of gob-side entry driving coal pillar and construction method</title><date>2022-07-05</date><risdate>2022</risdate><abstract>The invention relates to a collaborative anchoring structure for enhancing the stability of a gob-side entry driving coal pillar and a construction method, belongs to the technical field of gob-side entry driving coal pillar retaining mining, and solves the problem that an existing anchoring structure cannot meet the safety and stability requirements of a roadway. The construction method of the collaborative anchoring structure for enhancing the stability of the gob-side entry driving coal pillar comprises the steps that after an anchor net on the lower side of a roadway is laid, a first anchor cable is drilled; after drilling of a row of first anchor cables in the height direction of the lower side of the C roadway is completed, a first steel belt is used for interlocking the multiple first anchor cables in the row; in the tunneling process of the B face D roadway, the first anchor cable is installed to be located at the exposed end of the upper side of the D roadway. According to the collaborative anchoring</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN114704267A
source esp@cenet
subjects EARTH DRILLING
FIXED CONSTRUCTIONS
GALLERIES
LARGE UNDERGROUND CHAMBERS
MINING
SHAFTS
TUNNELS
title Cooperative anchoring structure for enhancing stability of gob-side entry driving coal pillar and construction method
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-30T08%3A31%3A01IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=YU%20WENKAI&rft.date=2022-07-05&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN114704267A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true