Tunnel segment pre-buried orifice pipe for freezing method connection channel

The invention discloses a tunnel segment pre-buried orifice pipe for connecting channels through a freezing method. The tunnel segment pre-buried orifice pipe comprises an orifice pipe pre-buried pipe (1), an orifice pipe external connecting pipe (2) and a choke plug (3). The orifice pipe embedded p...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: LIU YONGXIAO, SU WENDE, ZHANG WENJUN, YUAN HANG, CHEN PEIXIN, HU CHAORONG, ZHAO YUTONG, HUANG RUI, HE GUOJUN, WAN MIN, FAN JIE, CHENG WENZHEN, ZHU YANFEI
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator LIU YONGXIAO
SU WENDE
ZHANG WENJUN
YUAN HANG
CHEN PEIXIN
HU CHAORONG
ZHAO YUTONG
HUANG RUI
HE GUOJUN
WAN MIN
FAN JIE
CHENG WENZHEN
ZHU YANFEI
description The invention discloses a tunnel segment pre-buried orifice pipe for connecting channels through a freezing method. The tunnel segment pre-buried orifice pipe comprises an orifice pipe pre-buried pipe (1), an orifice pipe external connecting pipe (2) and a choke plug (3). The orifice pipe embedded pipe (1) is installed in a pipe piece (4) in an embedded mode, the orifice pipe embedded pipe (1) is connected with a steel bar structure in the pipe piece (4), and the axis of the orifice pipe embedded pipe (1) coincides with the designed axis of a freezing hole (41). The choke plug (3) is detachably connected to the orifice pipe embedded pipe (1), and the choke plug (3) is located in the pipe piece (4); one end of the orifice pipe external pipe (2) can be inserted into the freezing hole (41) and is coaxially connected with the orifice pipe embedded pipe (1), and the other end of the orifice pipe external pipe (2) extends out of the pipe piece (4) to form an orifice pipe structure. According to the method, damage t
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN114575881A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN114575881A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN114575881A3</originalsourceid><addsrcrecordid>eNqNjDEOwjAQBNNQIOAPxwNSWBCRFkUgGqjSR8ZZJycld5btNLwekHgA1TQzsy7u7SKCiRKGGZIpRJTPJTJ60sieHShwAHmN5CPwYhloRh61J6ef1GVWITfa72ZbrLydEnY_bor99dI2txJBO6RgHQS5ax7GHKtTVdfmfPjHeQP0DTZ2</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Tunnel segment pre-buried orifice pipe for freezing method connection channel</title><source>esp@cenet</source><creator>LIU YONGXIAO ; SU WENDE ; ZHANG WENJUN ; YUAN HANG ; CHEN PEIXIN ; HU CHAORONG ; ZHAO YUTONG ; HUANG RUI ; HE GUOJUN ; WAN MIN ; FAN JIE ; CHENG WENZHEN ; ZHU YANFEI</creator><creatorcontrib>LIU YONGXIAO ; SU WENDE ; ZHANG WENJUN ; YUAN HANG ; CHEN PEIXIN ; HU CHAORONG ; ZHAO YUTONG ; HUANG RUI ; HE GUOJUN ; WAN MIN ; FAN JIE ; CHENG WENZHEN ; ZHU YANFEI</creatorcontrib><description>The invention discloses a tunnel segment pre-buried orifice pipe for connecting channels through a freezing method. The tunnel segment pre-buried orifice pipe comprises an orifice pipe pre-buried pipe (1), an orifice pipe external connecting pipe (2) and a choke plug (3). The orifice pipe embedded pipe (1) is installed in a pipe piece (4) in an embedded mode, the orifice pipe embedded pipe (1) is connected with a steel bar structure in the pipe piece (4), and the axis of the orifice pipe embedded pipe (1) coincides with the designed axis of a freezing hole (41). The choke plug (3) is detachably connected to the orifice pipe embedded pipe (1), and the choke plug (3) is located in the pipe piece (4); one end of the orifice pipe external pipe (2) can be inserted into the freezing hole (41) and is coaxially connected with the orifice pipe embedded pipe (1), and the other end of the orifice pipe external pipe (2) extends out of the pipe piece (4) to form an orifice pipe structure. According to the method, damage t</description><language>chi ; eng</language><subject>EARTH DRILLING ; FIXED CONSTRUCTIONS ; GALLERIES ; LARGE UNDERGROUND CHAMBERS ; MINING ; SHAFTS ; TUNNELS</subject><creationdate>2022</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20220603&amp;DB=EPODOC&amp;CC=CN&amp;NR=114575881A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25543,76293</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20220603&amp;DB=EPODOC&amp;CC=CN&amp;NR=114575881A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>LIU YONGXIAO</creatorcontrib><creatorcontrib>SU WENDE</creatorcontrib><creatorcontrib>ZHANG WENJUN</creatorcontrib><creatorcontrib>YUAN HANG</creatorcontrib><creatorcontrib>CHEN PEIXIN</creatorcontrib><creatorcontrib>HU CHAORONG</creatorcontrib><creatorcontrib>ZHAO YUTONG</creatorcontrib><creatorcontrib>HUANG RUI</creatorcontrib><creatorcontrib>HE GUOJUN</creatorcontrib><creatorcontrib>WAN MIN</creatorcontrib><creatorcontrib>FAN JIE</creatorcontrib><creatorcontrib>CHENG WENZHEN</creatorcontrib><creatorcontrib>ZHU YANFEI</creatorcontrib><title>Tunnel segment pre-buried orifice pipe for freezing method connection channel</title><description>The invention discloses a tunnel segment pre-buried orifice pipe for connecting channels through a freezing method. The tunnel segment pre-buried orifice pipe comprises an orifice pipe pre-buried pipe (1), an orifice pipe external connecting pipe (2) and a choke plug (3). The orifice pipe embedded pipe (1) is installed in a pipe piece (4) in an embedded mode, the orifice pipe embedded pipe (1) is connected with a steel bar structure in the pipe piece (4), and the axis of the orifice pipe embedded pipe (1) coincides with the designed axis of a freezing hole (41). The choke plug (3) is detachably connected to the orifice pipe embedded pipe (1), and the choke plug (3) is located in the pipe piece (4); one end of the orifice pipe external pipe (2) can be inserted into the freezing hole (41) and is coaxially connected with the orifice pipe embedded pipe (1), and the other end of the orifice pipe external pipe (2) extends out of the pipe piece (4) to form an orifice pipe structure. According to the method, damage t</description><subject>EARTH DRILLING</subject><subject>FIXED CONSTRUCTIONS</subject><subject>GALLERIES</subject><subject>LARGE UNDERGROUND CHAMBERS</subject><subject>MINING</subject><subject>SHAFTS</subject><subject>TUNNELS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2022</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNjDEOwjAQBNNQIOAPxwNSWBCRFkUgGqjSR8ZZJycld5btNLwekHgA1TQzsy7u7SKCiRKGGZIpRJTPJTJ60sieHShwAHmN5CPwYhloRh61J6ef1GVWITfa72ZbrLydEnY_bor99dI2txJBO6RgHQS5ax7GHKtTVdfmfPjHeQP0DTZ2</recordid><startdate>20220603</startdate><enddate>20220603</enddate><creator>LIU YONGXIAO</creator><creator>SU WENDE</creator><creator>ZHANG WENJUN</creator><creator>YUAN HANG</creator><creator>CHEN PEIXIN</creator><creator>HU CHAORONG</creator><creator>ZHAO YUTONG</creator><creator>HUANG RUI</creator><creator>HE GUOJUN</creator><creator>WAN MIN</creator><creator>FAN JIE</creator><creator>CHENG WENZHEN</creator><creator>ZHU YANFEI</creator><scope>EVB</scope></search><sort><creationdate>20220603</creationdate><title>Tunnel segment pre-buried orifice pipe for freezing method connection channel</title><author>LIU YONGXIAO ; SU WENDE ; ZHANG WENJUN ; YUAN HANG ; CHEN PEIXIN ; HU CHAORONG ; ZHAO YUTONG ; HUANG RUI ; HE GUOJUN ; WAN MIN ; FAN JIE ; CHENG WENZHEN ; ZHU YANFEI</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN114575881A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2022</creationdate><topic>EARTH DRILLING</topic><topic>FIXED CONSTRUCTIONS</topic><topic>GALLERIES</topic><topic>LARGE UNDERGROUND CHAMBERS</topic><topic>MINING</topic><topic>SHAFTS</topic><topic>TUNNELS</topic><toplevel>online_resources</toplevel><creatorcontrib>LIU YONGXIAO</creatorcontrib><creatorcontrib>SU WENDE</creatorcontrib><creatorcontrib>ZHANG WENJUN</creatorcontrib><creatorcontrib>YUAN HANG</creatorcontrib><creatorcontrib>CHEN PEIXIN</creatorcontrib><creatorcontrib>HU CHAORONG</creatorcontrib><creatorcontrib>ZHAO YUTONG</creatorcontrib><creatorcontrib>HUANG RUI</creatorcontrib><creatorcontrib>HE GUOJUN</creatorcontrib><creatorcontrib>WAN MIN</creatorcontrib><creatorcontrib>FAN JIE</creatorcontrib><creatorcontrib>CHENG WENZHEN</creatorcontrib><creatorcontrib>ZHU YANFEI</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>LIU YONGXIAO</au><au>SU WENDE</au><au>ZHANG WENJUN</au><au>YUAN HANG</au><au>CHEN PEIXIN</au><au>HU CHAORONG</au><au>ZHAO YUTONG</au><au>HUANG RUI</au><au>HE GUOJUN</au><au>WAN MIN</au><au>FAN JIE</au><au>CHENG WENZHEN</au><au>ZHU YANFEI</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Tunnel segment pre-buried orifice pipe for freezing method connection channel</title><date>2022-06-03</date><risdate>2022</risdate><abstract>The invention discloses a tunnel segment pre-buried orifice pipe for connecting channels through a freezing method. The tunnel segment pre-buried orifice pipe comprises an orifice pipe pre-buried pipe (1), an orifice pipe external connecting pipe (2) and a choke plug (3). The orifice pipe embedded pipe (1) is installed in a pipe piece (4) in an embedded mode, the orifice pipe embedded pipe (1) is connected with a steel bar structure in the pipe piece (4), and the axis of the orifice pipe embedded pipe (1) coincides with the designed axis of a freezing hole (41). The choke plug (3) is detachably connected to the orifice pipe embedded pipe (1), and the choke plug (3) is located in the pipe piece (4); one end of the orifice pipe external pipe (2) can be inserted into the freezing hole (41) and is coaxially connected with the orifice pipe embedded pipe (1), and the other end of the orifice pipe external pipe (2) extends out of the pipe piece (4) to form an orifice pipe structure. According to the method, damage t</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN114575881A
source esp@cenet
subjects EARTH DRILLING
FIXED CONSTRUCTIONS
GALLERIES
LARGE UNDERGROUND CHAMBERS
MINING
SHAFTS
TUNNELS
title Tunnel segment pre-buried orifice pipe for freezing method connection channel
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-27T02%3A13%3A18IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=LIU%20YONGXIAO&rft.date=2022-06-03&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN114575881A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true