High-bearing-capacity pavement structure and paving construction method
The high-bearing-capacity pavement structure comprises a graded broken stone layer, a mortar layer is laid on the graded broken stone layer, a bonding layer is laid on the mortar layer, and an asphalt concrete overlay layer is laid on the bonding layer; a reinforcement cage is arranged in the bondin...
Gespeichert in:
Hauptverfasser: | , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | KIM MIN HUO ERPENG ZHANG WENXIU |
description | The high-bearing-capacity pavement structure comprises a graded broken stone layer, a mortar layer is laid on the graded broken stone layer, a bonding layer is laid on the mortar layer, and an asphalt concrete overlay layer is laid on the bonding layer; a reinforcement cage is arranged in the bonding layer, outer ribs are arranged on the upper side and the lower side of the reinforcement cage, and the outer ribs extend into the mortar layer and the asphalt concrete overlay layer. The paving construction method of the high-bearing-capacity pavement structure comprises the following steps: 1) leveling a site and erecting a template; (2) paving a large-particle-size gravel layer; (3) paving a small-particle-size gravel layer; (4) rolling to form a graded broken stone layer; the construction method comprises the following steps of (1) paving cement mortar to form a gravel grouting layer, (2) mounting a reinforcement cage, (3) paving a bonding layer, (4) paving a bonding layer, and (5) paving cement mortar to form |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN114575212A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN114575212A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN114575212A3</originalsourceid><addsrcrecordid>eNrjZHD3yEzP0E1KTSzKzEvXTU4sSEzOLKlUKEgsS81NzStRKC4pKk0uKS1KVUjMSwEJA5UpJOfnQcQz8_MUclNLMvJTeBhY0xJzilN5oTQ3g6Kba4izh25qQX58ajHQ2NS81JJ4Zz9DQxNTc1MjQyNHY2LUAAC1DjSb</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>High-bearing-capacity pavement structure and paving construction method</title><source>esp@cenet</source><creator>KIM MIN ; HUO ERPENG ; ZHANG WENXIU</creator><creatorcontrib>KIM MIN ; HUO ERPENG ; ZHANG WENXIU</creatorcontrib><description>The high-bearing-capacity pavement structure comprises a graded broken stone layer, a mortar layer is laid on the graded broken stone layer, a bonding layer is laid on the mortar layer, and an asphalt concrete overlay layer is laid on the bonding layer; a reinforcement cage is arranged in the bonding layer, outer ribs are arranged on the upper side and the lower side of the reinforcement cage, and the outer ribs extend into the mortar layer and the asphalt concrete overlay layer. The paving construction method of the high-bearing-capacity pavement structure comprises the following steps: 1) leveling a site and erecting a template; (2) paving a large-particle-size gravel layer; (3) paving a small-particle-size gravel layer; (4) rolling to form a graded broken stone layer; the construction method comprises the following steps of (1) paving cement mortar to form a gravel grouting layer, (2) mounting a reinforcement cage, (3) paving a bonding layer, (4) paving a bonding layer, and (5) paving cement mortar to form</description><language>chi ; eng</language><subject>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES ; CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, ORTHE LIKE ; FIXED CONSTRUCTIONS ; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR</subject><creationdate>2022</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20220603&DB=EPODOC&CC=CN&NR=114575212A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76419</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20220603&DB=EPODOC&CC=CN&NR=114575212A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>KIM MIN</creatorcontrib><creatorcontrib>HUO ERPENG</creatorcontrib><creatorcontrib>ZHANG WENXIU</creatorcontrib><title>High-bearing-capacity pavement structure and paving construction method</title><description>The high-bearing-capacity pavement structure comprises a graded broken stone layer, a mortar layer is laid on the graded broken stone layer, a bonding layer is laid on the mortar layer, and an asphalt concrete overlay layer is laid on the bonding layer; a reinforcement cage is arranged in the bonding layer, outer ribs are arranged on the upper side and the lower side of the reinforcement cage, and the outer ribs extend into the mortar layer and the asphalt concrete overlay layer. The paving construction method of the high-bearing-capacity pavement structure comprises the following steps: 1) leveling a site and erecting a template; (2) paving a large-particle-size gravel layer; (3) paving a small-particle-size gravel layer; (4) rolling to form a graded broken stone layer; the construction method comprises the following steps of (1) paving cement mortar to form a gravel grouting layer, (2) mounting a reinforcement cage, (3) paving a bonding layer, (4) paving a bonding layer, and (5) paving cement mortar to form</description><subject>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</subject><subject>CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, ORTHE LIKE</subject><subject>FIXED CONSTRUCTIONS</subject><subject>MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2022</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZHD3yEzP0E1KTSzKzEvXTU4sSEzOLKlUKEgsS81NzStRKC4pKk0uKS1KVUjMSwEJA5UpJOfnQcQz8_MUclNLMvJTeBhY0xJzilN5oTQ3g6Kba4izh25qQX58ajHQ2NS81JJ4Zz9DQxNTc1MjQyNHY2LUAAC1DjSb</recordid><startdate>20220603</startdate><enddate>20220603</enddate><creator>KIM MIN</creator><creator>HUO ERPENG</creator><creator>ZHANG WENXIU</creator><scope>EVB</scope></search><sort><creationdate>20220603</creationdate><title>High-bearing-capacity pavement structure and paving construction method</title><author>KIM MIN ; HUO ERPENG ; ZHANG WENXIU</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN114575212A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2022</creationdate><topic>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</topic><topic>CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, ORTHE LIKE</topic><topic>FIXED CONSTRUCTIONS</topic><topic>MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR</topic><toplevel>online_resources</toplevel><creatorcontrib>KIM MIN</creatorcontrib><creatorcontrib>HUO ERPENG</creatorcontrib><creatorcontrib>ZHANG WENXIU</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>KIM MIN</au><au>HUO ERPENG</au><au>ZHANG WENXIU</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>High-bearing-capacity pavement structure and paving construction method</title><date>2022-06-03</date><risdate>2022</risdate><abstract>The high-bearing-capacity pavement structure comprises a graded broken stone layer, a mortar layer is laid on the graded broken stone layer, a bonding layer is laid on the mortar layer, and an asphalt concrete overlay layer is laid on the bonding layer; a reinforcement cage is arranged in the bonding layer, outer ribs are arranged on the upper side and the lower side of the reinforcement cage, and the outer ribs extend into the mortar layer and the asphalt concrete overlay layer. The paving construction method of the high-bearing-capacity pavement structure comprises the following steps: 1) leveling a site and erecting a template; (2) paving a large-particle-size gravel layer; (3) paving a small-particle-size gravel layer; (4) rolling to form a graded broken stone layer; the construction method comprises the following steps of (1) paving cement mortar to form a gravel grouting layer, (2) mounting a reinforcement cage, (3) paving a bonding layer, (4) paving a bonding layer, and (5) paving cement mortar to form</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN114575212A |
source | esp@cenet |
subjects | CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, ORTHE LIKE FIXED CONSTRUCTIONS MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR |
title | High-bearing-capacity pavement structure and paving construction method |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-07T14%3A39%3A26IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=KIM%20MIN&rft.date=2022-06-03&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN114575212A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |