High-pressure slurry retaining wall construction method

The invention discloses a high-pressure slurry retaining wall construction method. The method comprises the following steps that (1) the thickness of a soft stratum in a stratum where a drilled hole is located and the thicknesses of other stratums are calculated and determined; (2) conventional slur...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: CAO PING, LIU ZHIZHEN, LIU TAOYING, FAN ZHI, DENG LIN, LUO XINYANG, XIE WEIPING, DENG HUIJUAN, ZHAO QINGXIONG, HAN DONGYA
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator CAO PING
LIU ZHIZHEN
LIU TAOYING
FAN ZHI
DENG LIN
LUO XINYANG
XIE WEIPING
DENG HUIJUAN
ZHAO QINGXIONG
HAN DONGYA
description The invention discloses a high-pressure slurry retaining wall construction method. The method comprises the following steps that (1) the thickness of a soft stratum in a stratum where a drilled hole is located and the thicknesses of other stratums are calculated and determined; (2) conventional slurry wall protection is conducted on the stable stratum close to the bottom of the drilled hole; (3) high-pressure slurry wall protection equipment is installed; (4) high-pressure slurry wall protection is conducted; 5) a recovery device; and 6) carrying out conventional slurry wall protection on the stable stratum at the upper part of the drill hole. According to the high-pressure slurry wall protecting method, high-pressure slurry wall protecting can be carried out aiming at the problem that the hole wall of the drill hole in the soft stratum is prone to collapsing, the defect that a stable wall protecting mud layer is difficult to form on the wall of the drill hole in the soft stratum through an existing slurry wa
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN114508095A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN114508095A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN114508095A3</originalsourceid><addsrcrecordid>eNrjZDD3yEzP0C0oSi0uLi1KVSjOKS0qqlQoSi1JzMzLzEtXKE_MyVFIzs8rLikqTS7JzM9TyE0tychP4WFgTUvMKU7lhdLcDIpuriHOHrqpBfnxqcUFicmpeakl8c5-hoYmpgYWBpamjsbEqAEAKqwutA</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>High-pressure slurry retaining wall construction method</title><source>esp@cenet</source><creator>CAO PING ; LIU ZHIZHEN ; LIU TAOYING ; FAN ZHI ; DENG LIN ; LUO XINYANG ; XIE WEIPING ; DENG HUIJUAN ; ZHAO QINGXIONG ; HAN DONGYA</creator><creatorcontrib>CAO PING ; LIU ZHIZHEN ; LIU TAOYING ; FAN ZHI ; DENG LIN ; LUO XINYANG ; XIE WEIPING ; DENG HUIJUAN ; ZHAO QINGXIONG ; HAN DONGYA</creatorcontrib><description>The invention discloses a high-pressure slurry retaining wall construction method. The method comprises the following steps that (1) the thickness of a soft stratum in a stratum where a drilled hole is located and the thicknesses of other stratums are calculated and determined; (2) conventional slurry wall protection is conducted on the stable stratum close to the bottom of the drilled hole; (3) high-pressure slurry wall protection equipment is installed; (4) high-pressure slurry wall protection is conducted; 5) a recovery device; and 6) carrying out conventional slurry wall protection on the stable stratum at the upper part of the drill hole. According to the high-pressure slurry wall protecting method, high-pressure slurry wall protecting can be carried out aiming at the problem that the hole wall of the drill hole in the soft stratum is prone to collapsing, the defect that a stable wall protecting mud layer is difficult to form on the wall of the drill hole in the soft stratum through an existing slurry wa</description><language>chi ; eng</language><subject>EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; SOIL SHIFTING ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>2022</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20220517&amp;DB=EPODOC&amp;CC=CN&amp;NR=114508095A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25543,76293</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20220517&amp;DB=EPODOC&amp;CC=CN&amp;NR=114508095A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>CAO PING</creatorcontrib><creatorcontrib>LIU ZHIZHEN</creatorcontrib><creatorcontrib>LIU TAOYING</creatorcontrib><creatorcontrib>FAN ZHI</creatorcontrib><creatorcontrib>DENG LIN</creatorcontrib><creatorcontrib>LUO XINYANG</creatorcontrib><creatorcontrib>XIE WEIPING</creatorcontrib><creatorcontrib>DENG HUIJUAN</creatorcontrib><creatorcontrib>ZHAO QINGXIONG</creatorcontrib><creatorcontrib>HAN DONGYA</creatorcontrib><title>High-pressure slurry retaining wall construction method</title><description>The invention discloses a high-pressure slurry retaining wall construction method. The method comprises the following steps that (1) the thickness of a soft stratum in a stratum where a drilled hole is located and the thicknesses of other stratums are calculated and determined; (2) conventional slurry wall protection is conducted on the stable stratum close to the bottom of the drilled hole; (3) high-pressure slurry wall protection equipment is installed; (4) high-pressure slurry wall protection is conducted; 5) a recovery device; and 6) carrying out conventional slurry wall protection on the stable stratum at the upper part of the drill hole. According to the high-pressure slurry wall protecting method, high-pressure slurry wall protecting can be carried out aiming at the problem that the hole wall of the drill hole in the soft stratum is prone to collapsing, the defect that a stable wall protecting mud layer is difficult to form on the wall of the drill hole in the soft stratum through an existing slurry wa</description><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>SOIL SHIFTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2022</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZDD3yEzP0C0oSi0uLi1KVSjOKS0qqlQoSi1JzMzLzEtXKE_MyVFIzs8rLikqTS7JzM9TyE0tychP4WFgTUvMKU7lhdLcDIpuriHOHrqpBfnxqcUFicmpeakl8c5-hoYmpgYWBpamjsbEqAEAKqwutA</recordid><startdate>20220517</startdate><enddate>20220517</enddate><creator>CAO PING</creator><creator>LIU ZHIZHEN</creator><creator>LIU TAOYING</creator><creator>FAN ZHI</creator><creator>DENG LIN</creator><creator>LUO XINYANG</creator><creator>XIE WEIPING</creator><creator>DENG HUIJUAN</creator><creator>ZHAO QINGXIONG</creator><creator>HAN DONGYA</creator><scope>EVB</scope></search><sort><creationdate>20220517</creationdate><title>High-pressure slurry retaining wall construction method</title><author>CAO PING ; LIU ZHIZHEN ; LIU TAOYING ; FAN ZHI ; DENG LIN ; LUO XINYANG ; XIE WEIPING ; DENG HUIJUAN ; ZHAO QINGXIONG ; HAN DONGYA</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN114508095A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2022</creationdate><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>SOIL SHIFTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>CAO PING</creatorcontrib><creatorcontrib>LIU ZHIZHEN</creatorcontrib><creatorcontrib>LIU TAOYING</creatorcontrib><creatorcontrib>FAN ZHI</creatorcontrib><creatorcontrib>DENG LIN</creatorcontrib><creatorcontrib>LUO XINYANG</creatorcontrib><creatorcontrib>XIE WEIPING</creatorcontrib><creatorcontrib>DENG HUIJUAN</creatorcontrib><creatorcontrib>ZHAO QINGXIONG</creatorcontrib><creatorcontrib>HAN DONGYA</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>CAO PING</au><au>LIU ZHIZHEN</au><au>LIU TAOYING</au><au>FAN ZHI</au><au>DENG LIN</au><au>LUO XINYANG</au><au>XIE WEIPING</au><au>DENG HUIJUAN</au><au>ZHAO QINGXIONG</au><au>HAN DONGYA</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>High-pressure slurry retaining wall construction method</title><date>2022-05-17</date><risdate>2022</risdate><abstract>The invention discloses a high-pressure slurry retaining wall construction method. The method comprises the following steps that (1) the thickness of a soft stratum in a stratum where a drilled hole is located and the thicknesses of other stratums are calculated and determined; (2) conventional slurry wall protection is conducted on the stable stratum close to the bottom of the drilled hole; (3) high-pressure slurry wall protection equipment is installed; (4) high-pressure slurry wall protection is conducted; 5) a recovery device; and 6) carrying out conventional slurry wall protection on the stable stratum at the upper part of the drill hole. According to the high-pressure slurry wall protecting method, high-pressure slurry wall protecting can be carried out aiming at the problem that the hole wall of the drill hole in the soft stratum is prone to collapsing, the defect that a stable wall protecting mud layer is difficult to form on the wall of the drill hole in the soft stratum through an existing slurry wa</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN114508095A
source esp@cenet
subjects EMBANKMENTS
EXCAVATIONS
FIXED CONSTRUCTIONS
FOUNDATIONS
HYDRAULIC ENGINEERING
SOIL SHIFTING
UNDERGROUND OR UNDERWATER STRUCTURES
title High-pressure slurry retaining wall construction method
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-26T19%3A56%3A53IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=CAO%20PING&rft.date=2022-05-17&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN114508095A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true