Bridge and culvert abutment back hanging plate retaining type foam light soil backfill construction method
The invention relates to a bridge and culvert abutment back hanging plate retaining type foam light soil backfill construction method. The method comprises the steps that S1, construction preparation is conducted; debugging a prefabricated hanging plate and foam light soil mixing device, and verifyi...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | LUO YAMING TIAN PENGBO ZHANG LEI WANG LE HAN JIAQI LIU YOUHUI SUN JIE GENG YANRONG YANG GUANGDONG JIN HANG JIA XUNTAO ZHANG XIAOHU |
description | The invention relates to a bridge and culvert abutment back hanging plate retaining type foam light soil backfill construction method. The method comprises the steps that S1, construction preparation is conducted; debugging a prefabricated hanging plate and foam light soil mixing device, and verifying a test mix proportion; s2, an abutment back is processed, the bearing capacity is detected, test lofting is conducted, and a backfill area is determined; s3, hanging plate construction; hanging plates are arranged around the backfill area to prevent backfill materials in the backfill area from flowing out; s4, foam light soil is mixed, and the foam light soil is poured on the first layer of the backfill area; s5, preserving; s6, the steps S3-S5 are repeated, the next layer of hanging plate construction is conducted, and backfilling continues to be conducted till the backfilling height is reached; the method has the effect of reducing differential settlement in abutment back backfilling engineering.
本申请涉及一种桥涵台背挂板 |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN114439018A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN114439018A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN114439018A3</originalsourceid><addsrcrecordid>eNqNi0EKwjAQAHvxIOof1gcIlvagRy2KJ0_eyzbdpqvJJiRbwd-L4gM8DQMz8-J-TNxbApQezOSelBSwm9STKHRoHjCiWBYL0aESJFJk-bi-IsEQ0INjOyrkwO57DOwcmCBZ02SUg4AnHUO_LGYDukyrHxfF-ny6NZcNxdBSjmhISNvmWpZ1Xe235e5Q_dO8AZ2OQVA</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Bridge and culvert abutment back hanging plate retaining type foam light soil backfill construction method</title><source>esp@cenet</source><creator>LUO YAMING ; TIAN PENGBO ; ZHANG LEI ; WANG LE ; HAN JIAQI ; LIU YOUHUI ; SUN JIE ; GENG YANRONG ; YANG GUANGDONG ; JIN HANG ; JIA XUNTAO ; ZHANG XIAOHU</creator><creatorcontrib>LUO YAMING ; TIAN PENGBO ; ZHANG LEI ; WANG LE ; HAN JIAQI ; LIU YOUHUI ; SUN JIE ; GENG YANRONG ; YANG GUANGDONG ; JIN HANG ; JIA XUNTAO ; ZHANG XIAOHU</creatorcontrib><description>The invention relates to a bridge and culvert abutment back hanging plate retaining type foam light soil backfill construction method. The method comprises the steps that S1, construction preparation is conducted; debugging a prefabricated hanging plate and foam light soil mixing device, and verifying a test mix proportion; s2, an abutment back is processed, the bearing capacity is detected, test lofting is conducted, and a backfill area is determined; s3, hanging plate construction; hanging plates are arranged around the backfill area to prevent backfill materials in the backfill area from flowing out; s4, foam light soil is mixed, and the foam light soil is poured on the first layer of the backfill area; s5, preserving; s6, the steps S3-S5 are repeated, the next layer of hanging plate construction is conducted, and backfilling continues to be conducted till the backfilling height is reached; the method has the effect of reducing differential settlement in abutment back backfilling engineering.
本申请涉及一种桥涵台背挂板</description><language>chi ; eng</language><subject>ASSEMBLY OF BRIDGES ; CONSTRUCTION OF BRIDGES ; CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES ; EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; OR VIADUCTS ; PERFORMING OPERATIONS ; PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL ; SEPARATION ; SOIL SHIFTING ; TRANSPORTING ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>2022</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20220506&DB=EPODOC&CC=CN&NR=114439018A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,778,883,25547,76298</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20220506&DB=EPODOC&CC=CN&NR=114439018A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>LUO YAMING</creatorcontrib><creatorcontrib>TIAN PENGBO</creatorcontrib><creatorcontrib>ZHANG LEI</creatorcontrib><creatorcontrib>WANG LE</creatorcontrib><creatorcontrib>HAN JIAQI</creatorcontrib><creatorcontrib>LIU YOUHUI</creatorcontrib><creatorcontrib>SUN JIE</creatorcontrib><creatorcontrib>GENG YANRONG</creatorcontrib><creatorcontrib>YANG GUANGDONG</creatorcontrib><creatorcontrib>JIN HANG</creatorcontrib><creatorcontrib>JIA XUNTAO</creatorcontrib><creatorcontrib>ZHANG XIAOHU</creatorcontrib><title>Bridge and culvert abutment back hanging plate retaining type foam light soil backfill construction method</title><description>The invention relates to a bridge and culvert abutment back hanging plate retaining type foam light soil backfill construction method. The method comprises the steps that S1, construction preparation is conducted; debugging a prefabricated hanging plate and foam light soil mixing device, and verifying a test mix proportion; s2, an abutment back is processed, the bearing capacity is detected, test lofting is conducted, and a backfill area is determined; s3, hanging plate construction; hanging plates are arranged around the backfill area to prevent backfill materials in the backfill area from flowing out; s4, foam light soil is mixed, and the foam light soil is poured on the first layer of the backfill area; s5, preserving; s6, the steps S3-S5 are repeated, the next layer of hanging plate construction is conducted, and backfilling continues to be conducted till the backfilling height is reached; the method has the effect of reducing differential settlement in abutment back backfilling engineering.
本申请涉及一种桥涵台背挂板</description><subject>ASSEMBLY OF BRIDGES</subject><subject>CONSTRUCTION OF BRIDGES</subject><subject>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</subject><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>OR VIADUCTS</subject><subject>PERFORMING OPERATIONS</subject><subject>PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL</subject><subject>SEPARATION</subject><subject>SOIL SHIFTING</subject><subject>TRANSPORTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2022</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNi0EKwjAQAHvxIOof1gcIlvagRy2KJ0_eyzbdpqvJJiRbwd-L4gM8DQMz8-J-TNxbApQezOSelBSwm9STKHRoHjCiWBYL0aESJFJk-bi-IsEQ0INjOyrkwO57DOwcmCBZ02SUg4AnHUO_LGYDukyrHxfF-ny6NZcNxdBSjmhISNvmWpZ1Xe235e5Q_dO8AZ2OQVA</recordid><startdate>20220506</startdate><enddate>20220506</enddate><creator>LUO YAMING</creator><creator>TIAN PENGBO</creator><creator>ZHANG LEI</creator><creator>WANG LE</creator><creator>HAN JIAQI</creator><creator>LIU YOUHUI</creator><creator>SUN JIE</creator><creator>GENG YANRONG</creator><creator>YANG GUANGDONG</creator><creator>JIN HANG</creator><creator>JIA XUNTAO</creator><creator>ZHANG XIAOHU</creator><scope>EVB</scope></search><sort><creationdate>20220506</creationdate><title>Bridge and culvert abutment back hanging plate retaining type foam light soil backfill construction method</title><author>LUO YAMING ; TIAN PENGBO ; ZHANG LEI ; WANG LE ; HAN JIAQI ; LIU YOUHUI ; SUN JIE ; GENG YANRONG ; YANG GUANGDONG ; JIN HANG ; JIA XUNTAO ; ZHANG XIAOHU</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN114439018A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2022</creationdate><topic>ASSEMBLY OF BRIDGES</topic><topic>CONSTRUCTION OF BRIDGES</topic><topic>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</topic><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>OR VIADUCTS</topic><topic>PERFORMING OPERATIONS</topic><topic>PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL</topic><topic>SEPARATION</topic><topic>SOIL SHIFTING</topic><topic>TRANSPORTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>LUO YAMING</creatorcontrib><creatorcontrib>TIAN PENGBO</creatorcontrib><creatorcontrib>ZHANG LEI</creatorcontrib><creatorcontrib>WANG LE</creatorcontrib><creatorcontrib>HAN JIAQI</creatorcontrib><creatorcontrib>LIU YOUHUI</creatorcontrib><creatorcontrib>SUN JIE</creatorcontrib><creatorcontrib>GENG YANRONG</creatorcontrib><creatorcontrib>YANG GUANGDONG</creatorcontrib><creatorcontrib>JIN HANG</creatorcontrib><creatorcontrib>JIA XUNTAO</creatorcontrib><creatorcontrib>ZHANG XIAOHU</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>LUO YAMING</au><au>TIAN PENGBO</au><au>ZHANG LEI</au><au>WANG LE</au><au>HAN JIAQI</au><au>LIU YOUHUI</au><au>SUN JIE</au><au>GENG YANRONG</au><au>YANG GUANGDONG</au><au>JIN HANG</au><au>JIA XUNTAO</au><au>ZHANG XIAOHU</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Bridge and culvert abutment back hanging plate retaining type foam light soil backfill construction method</title><date>2022-05-06</date><risdate>2022</risdate><abstract>The invention relates to a bridge and culvert abutment back hanging plate retaining type foam light soil backfill construction method. The method comprises the steps that S1, construction preparation is conducted; debugging a prefabricated hanging plate and foam light soil mixing device, and verifying a test mix proportion; s2, an abutment back is processed, the bearing capacity is detected, test lofting is conducted, and a backfill area is determined; s3, hanging plate construction; hanging plates are arranged around the backfill area to prevent backfill materials in the backfill area from flowing out; s4, foam light soil is mixed, and the foam light soil is poured on the first layer of the backfill area; s5, preserving; s6, the steps S3-S5 are repeated, the next layer of hanging plate construction is conducted, and backfilling continues to be conducted till the backfilling height is reached; the method has the effect of reducing differential settlement in abutment back backfilling engineering.
本申请涉及一种桥涵台背挂板</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN114439018A |
source | esp@cenet |
subjects | ASSEMBLY OF BRIDGES CONSTRUCTION OF BRIDGES CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES EMBANKMENTS EXCAVATIONS FIXED CONSTRUCTIONS FOUNDATIONS HYDRAULIC ENGINEERING OR VIADUCTS PERFORMING OPERATIONS PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL SEPARATION SOIL SHIFTING TRANSPORTING UNDERGROUND OR UNDERWATER STRUCTURES |
title | Bridge and culvert abutment back hanging plate retaining type foam light soil backfill construction method |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-16T06%3A18%3A24IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=LUO%20YAMING&rft.date=2022-05-06&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN114439018A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |