Construction method for semi-hidden framing glass curtain wall of large building
The invention discloses a construction method of a semi-hidden framing glass curtain wall of a large building, which is characterized by comprising the following steps: step 1, surveying and setting out; secondly, the embedded part is checked and installed; 3, pre-assembling transverse and vertical...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , , , , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | LIU YAO XU NING TIAN QIANG XU LIANG WANG ZHENLING MENG TONGCAN LI QI XU HOUCAI WANG PENGXIAO JIA RUIYU MA WEIGUO LU MIN BAI YUNPENG WANG ZIWEI JI ZHI WANG LANTAO ZHOU LEILEI LIU XINJIA HAN SEUNG-GYU LIU XUEMEI GE LIANG |
description | The invention discloses a construction method of a semi-hidden framing glass curtain wall of a large building, which is characterized by comprising the following steps: step 1, surveying and setting out; secondly, the embedded part is checked and installed; 3, pre-assembling transverse and vertical keels; fourthly, galvanized connecting pieces are installed; fifthly, vertical main keels and transverse auxiliary keels are installed; sixthly, thermal insulation joints are constructed; seventhly, fireproof joints are constructed; 8, carrying out hidden acceptance inspection; ninthly, glass plates are installed; tenthly, an opening sash is installed; step 11, sealing; and step 12, completion acceptance. The stability of the semi-hidden framing glass curtain wall after installation is guaranteed through procedure arrangement and inspection of the installation method and structure of each step, and the semi-hidden framing glass curtain wall has excellent heat preservation and waterproof capacity.
本发明公开了一种大型建筑的半隐框玻璃 |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN114412035A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN114412035A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN114412035A3</originalsourceid><addsrcrecordid>eNqNyjEOAiEQAEAaC6P-YX3AJeKdDzBEY2Us7C8rLHcksFxYiN_XwgdYTTNr9TCZpZZma8gMieqcHfhcQCiFbg7OEYMvmAJPMEUUAdtKxcDwxhghe4hYJoJXC9F901atPEah3c-N2l8vT3PraMkjyYKWmOpo7loPgz4e-tO5_-d8AK2IN00</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Construction method for semi-hidden framing glass curtain wall of large building</title><source>esp@cenet</source><creator>LIU YAO ; XU NING ; TIAN QIANG ; XU LIANG ; WANG ZHENLING ; MENG TONGCAN ; LI QI ; XU HOUCAI ; WANG PENGXIAO ; JIA RUIYU ; MA WEIGUO ; LU MIN ; BAI YUNPENG ; WANG ZIWEI ; JI ZHI ; WANG LANTAO ; ZHOU LEILEI ; LIU XINJIA ; HAN SEUNG-GYU ; LIU XUEMEI ; GE LIANG</creator><creatorcontrib>LIU YAO ; XU NING ; TIAN QIANG ; XU LIANG ; WANG ZHENLING ; MENG TONGCAN ; LI QI ; XU HOUCAI ; WANG PENGXIAO ; JIA RUIYU ; MA WEIGUO ; LU MIN ; BAI YUNPENG ; WANG ZIWEI ; JI ZHI ; WANG LANTAO ; ZHOU LEILEI ; LIU XINJIA ; HAN SEUNG-GYU ; LIU XUEMEI ; GE LIANG</creatorcontrib><description>The invention discloses a construction method of a semi-hidden framing glass curtain wall of a large building, which is characterized by comprising the following steps: step 1, surveying and setting out; secondly, the embedded part is checked and installed; 3, pre-assembling transverse and vertical keels; fourthly, galvanized connecting pieces are installed; fifthly, vertical main keels and transverse auxiliary keels are installed; sixthly, thermal insulation joints are constructed; seventhly, fireproof joints are constructed; 8, carrying out hidden acceptance inspection; ninthly, glass plates are installed; tenthly, an opening sash is installed; step 11, sealing; and step 12, completion acceptance. The stability of the semi-hidden framing glass curtain wall after installation is guaranteed through procedure arrangement and inspection of the installation method and structure of each step, and the semi-hidden framing glass curtain wall has excellent heat preservation and waterproof capacity.
本发明公开了一种大型建筑的半隐框玻璃</description><language>chi ; eng</language><subject>BUILDING ; BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE ; CEILINGS ; FIXED CONSTRUCTIONS ; FLOORS ; FORMS ; GENERAL BUILDING CONSTRUCTIONS ; HANDLING BUILDING MATERIALS ON THE SITE ; INSULATION OR OTHER PROTECTION OF BUILDINGS ; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS ; ROOFS ; SCAFFOLDING ; SHUTTERING ; WALLS, e.g. PARTITIONS</subject><creationdate>2022</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20220429&DB=EPODOC&CC=CN&NR=114412035A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76289</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20220429&DB=EPODOC&CC=CN&NR=114412035A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>LIU YAO</creatorcontrib><creatorcontrib>XU NING</creatorcontrib><creatorcontrib>TIAN QIANG</creatorcontrib><creatorcontrib>XU LIANG</creatorcontrib><creatorcontrib>WANG ZHENLING</creatorcontrib><creatorcontrib>MENG TONGCAN</creatorcontrib><creatorcontrib>LI QI</creatorcontrib><creatorcontrib>XU HOUCAI</creatorcontrib><creatorcontrib>WANG PENGXIAO</creatorcontrib><creatorcontrib>JIA RUIYU</creatorcontrib><creatorcontrib>MA WEIGUO</creatorcontrib><creatorcontrib>LU MIN</creatorcontrib><creatorcontrib>BAI YUNPENG</creatorcontrib><creatorcontrib>WANG ZIWEI</creatorcontrib><creatorcontrib>JI ZHI</creatorcontrib><creatorcontrib>WANG LANTAO</creatorcontrib><creatorcontrib>ZHOU LEILEI</creatorcontrib><creatorcontrib>LIU XINJIA</creatorcontrib><creatorcontrib>HAN SEUNG-GYU</creatorcontrib><creatorcontrib>LIU XUEMEI</creatorcontrib><creatorcontrib>GE LIANG</creatorcontrib><title>Construction method for semi-hidden framing glass curtain wall of large building</title><description>The invention discloses a construction method of a semi-hidden framing glass curtain wall of a large building, which is characterized by comprising the following steps: step 1, surveying and setting out; secondly, the embedded part is checked and installed; 3, pre-assembling transverse and vertical keels; fourthly, galvanized connecting pieces are installed; fifthly, vertical main keels and transverse auxiliary keels are installed; sixthly, thermal insulation joints are constructed; seventhly, fireproof joints are constructed; 8, carrying out hidden acceptance inspection; ninthly, glass plates are installed; tenthly, an opening sash is installed; step 11, sealing; and step 12, completion acceptance. The stability of the semi-hidden framing glass curtain wall after installation is guaranteed through procedure arrangement and inspection of the installation method and structure of each step, and the semi-hidden framing glass curtain wall has excellent heat preservation and waterproof capacity.
本发明公开了一种大型建筑的半隐框玻璃</description><subject>BUILDING</subject><subject>BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE</subject><subject>CEILINGS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FLOORS</subject><subject>FORMS</subject><subject>GENERAL BUILDING CONSTRUCTIONS</subject><subject>HANDLING BUILDING MATERIALS ON THE SITE</subject><subject>INSULATION OR OTHER PROTECTION OF BUILDINGS</subject><subject>REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS</subject><subject>ROOFS</subject><subject>SCAFFOLDING</subject><subject>SHUTTERING</subject><subject>WALLS, e.g. PARTITIONS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2022</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNyjEOAiEQAEAaC6P-YX3AJeKdDzBEY2Us7C8rLHcksFxYiN_XwgdYTTNr9TCZpZZma8gMieqcHfhcQCiFbg7OEYMvmAJPMEUUAdtKxcDwxhghe4hYJoJXC9F901atPEah3c-N2l8vT3PraMkjyYKWmOpo7loPgz4e-tO5_-d8AK2IN00</recordid><startdate>20220429</startdate><enddate>20220429</enddate><creator>LIU YAO</creator><creator>XU NING</creator><creator>TIAN QIANG</creator><creator>XU LIANG</creator><creator>WANG ZHENLING</creator><creator>MENG TONGCAN</creator><creator>LI QI</creator><creator>XU HOUCAI</creator><creator>WANG PENGXIAO</creator><creator>JIA RUIYU</creator><creator>MA WEIGUO</creator><creator>LU MIN</creator><creator>BAI YUNPENG</creator><creator>WANG ZIWEI</creator><creator>JI ZHI</creator><creator>WANG LANTAO</creator><creator>ZHOU LEILEI</creator><creator>LIU XINJIA</creator><creator>HAN SEUNG-GYU</creator><creator>LIU XUEMEI</creator><creator>GE LIANG</creator><scope>EVB</scope></search><sort><creationdate>20220429</creationdate><title>Construction method for semi-hidden framing glass curtain wall of large building</title><author>LIU YAO ; XU NING ; TIAN QIANG ; XU LIANG ; WANG ZHENLING ; MENG TONGCAN ; LI QI ; XU HOUCAI ; WANG PENGXIAO ; JIA RUIYU ; MA WEIGUO ; LU MIN ; BAI YUNPENG ; WANG ZIWEI ; JI ZHI ; WANG LANTAO ; ZHOU LEILEI ; LIU XINJIA ; HAN SEUNG-GYU ; LIU XUEMEI ; GE LIANG</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN114412035A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2022</creationdate><topic>BUILDING</topic><topic>BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE</topic><topic>CEILINGS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FLOORS</topic><topic>FORMS</topic><topic>GENERAL BUILDING CONSTRUCTIONS</topic><topic>HANDLING BUILDING MATERIALS ON THE SITE</topic><topic>INSULATION OR OTHER PROTECTION OF BUILDINGS</topic><topic>REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS</topic><topic>ROOFS</topic><topic>SCAFFOLDING</topic><topic>SHUTTERING</topic><topic>WALLS, e.g. PARTITIONS</topic><toplevel>online_resources</toplevel><creatorcontrib>LIU YAO</creatorcontrib><creatorcontrib>XU NING</creatorcontrib><creatorcontrib>TIAN QIANG</creatorcontrib><creatorcontrib>XU LIANG</creatorcontrib><creatorcontrib>WANG ZHENLING</creatorcontrib><creatorcontrib>MENG TONGCAN</creatorcontrib><creatorcontrib>LI QI</creatorcontrib><creatorcontrib>XU HOUCAI</creatorcontrib><creatorcontrib>WANG PENGXIAO</creatorcontrib><creatorcontrib>JIA RUIYU</creatorcontrib><creatorcontrib>MA WEIGUO</creatorcontrib><creatorcontrib>LU MIN</creatorcontrib><creatorcontrib>BAI YUNPENG</creatorcontrib><creatorcontrib>WANG ZIWEI</creatorcontrib><creatorcontrib>JI ZHI</creatorcontrib><creatorcontrib>WANG LANTAO</creatorcontrib><creatorcontrib>ZHOU LEILEI</creatorcontrib><creatorcontrib>LIU XINJIA</creatorcontrib><creatorcontrib>HAN SEUNG-GYU</creatorcontrib><creatorcontrib>LIU XUEMEI</creatorcontrib><creatorcontrib>GE LIANG</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>LIU YAO</au><au>XU NING</au><au>TIAN QIANG</au><au>XU LIANG</au><au>WANG ZHENLING</au><au>MENG TONGCAN</au><au>LI QI</au><au>XU HOUCAI</au><au>WANG PENGXIAO</au><au>JIA RUIYU</au><au>MA WEIGUO</au><au>LU MIN</au><au>BAI YUNPENG</au><au>WANG ZIWEI</au><au>JI ZHI</au><au>WANG LANTAO</au><au>ZHOU LEILEI</au><au>LIU XINJIA</au><au>HAN SEUNG-GYU</au><au>LIU XUEMEI</au><au>GE LIANG</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Construction method for semi-hidden framing glass curtain wall of large building</title><date>2022-04-29</date><risdate>2022</risdate><abstract>The invention discloses a construction method of a semi-hidden framing glass curtain wall of a large building, which is characterized by comprising the following steps: step 1, surveying and setting out; secondly, the embedded part is checked and installed; 3, pre-assembling transverse and vertical keels; fourthly, galvanized connecting pieces are installed; fifthly, vertical main keels and transverse auxiliary keels are installed; sixthly, thermal insulation joints are constructed; seventhly, fireproof joints are constructed; 8, carrying out hidden acceptance inspection; ninthly, glass plates are installed; tenthly, an opening sash is installed; step 11, sealing; and step 12, completion acceptance. The stability of the semi-hidden framing glass curtain wall after installation is guaranteed through procedure arrangement and inspection of the installation method and structure of each step, and the semi-hidden framing glass curtain wall has excellent heat preservation and waterproof capacity.
本发明公开了一种大型建筑的半隐框玻璃</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN114412035A |
source | esp@cenet |
subjects | BUILDING BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE CEILINGS FIXED CONSTRUCTIONS FLOORS FORMS GENERAL BUILDING CONSTRUCTIONS HANDLING BUILDING MATERIALS ON THE SITE INSULATION OR OTHER PROTECTION OF BUILDINGS REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS ROOFS SCAFFOLDING SHUTTERING WALLS, e.g. PARTITIONS |
title | Construction method for semi-hidden framing glass curtain wall of large building |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-05T02%3A34%3A38IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=LIU%20YAO&rft.date=2022-04-29&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN114412035A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |