Blasting construction method for protecting main body structure of tunnel pile method subway station
The invention discloses a blasting construction method for a tunnel pile method subway station protection main body structure. Comprising the following steps: (1) excavating a vertical shaft: excavating an earthwork machine at the upper part of the vertical shaft, and excavating a vertical shaft bod...
Gespeichert in:
Hauptverfasser: | , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | YAN ZHENHAO HONG YONG XIE HONGXING WAN CHAOHAI LI XIAODONG CHEN XIAO |
description | The invention discloses a blasting construction method for a tunnel pile method subway station protection main body structure. Comprising the following steps: (1) excavating a vertical shaft: excavating an earthwork machine at the upper part of the vertical shaft, and excavating a vertical shaft body in a medium and slightly weathered rock stratum by adopting underholing blasting; (2) transverse channel blasting construction is conducted, specifically, mining method blasting is adopted, upper and lower step tunnel blasting is adopted, the arch-shaped part of the transverse channel is an upper step, a lower step is arranged below the arch-shaped part of the transverse channel, and during blasting, the upper step is firstly blasted, and blasting is conducted from top to bottom; (3) pilot tunnel blasting construction is conducted, specifically, according to a micro-step division method, the middle of a lower step is excavated firstly, and then a side wall is excavated; step blasting of vertical drilling is adopt |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN114383480A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN114383480A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN114383480A3</originalsourceid><addsrcrecordid>eNqNzDsOwjAQRVE3FAjYw7AAJKKkSEsiEBUVfeTYY7DkzFj2WIjdo_DpqV5z3l0q2wWdxdMNDFOWVIx4JphQ7mzBcYKYWNC8yaQ9wcj2CR9ZEgI7kEKEAaIP-DvmMj70zPScW6uF0yHj5rsrtT0dr_15h5EHzFEbJJShv1RVU7d10-4P9T_mBWuBP8g</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Blasting construction method for protecting main body structure of tunnel pile method subway station</title><source>esp@cenet</source><creator>YAN ZHENHAO ; HONG YONG ; XIE HONGXING ; WAN CHAOHAI ; LI XIAODONG ; CHEN XIAO</creator><creatorcontrib>YAN ZHENHAO ; HONG YONG ; XIE HONGXING ; WAN CHAOHAI ; LI XIAODONG ; CHEN XIAO</creatorcontrib><description>The invention discloses a blasting construction method for a tunnel pile method subway station protection main body structure. Comprising the following steps: (1) excavating a vertical shaft: excavating an earthwork machine at the upper part of the vertical shaft, and excavating a vertical shaft body in a medium and slightly weathered rock stratum by adopting underholing blasting; (2) transverse channel blasting construction is conducted, specifically, mining method blasting is adopted, upper and lower step tunnel blasting is adopted, the arch-shaped part of the transverse channel is an upper step, a lower step is arranged below the arch-shaped part of the transverse channel, and during blasting, the upper step is firstly blasted, and blasting is conducted from top to bottom; (3) pilot tunnel blasting construction is conducted, specifically, according to a micro-step division method, the middle of a lower step is excavated firstly, and then a side wall is excavated; step blasting of vertical drilling is adopt</description><language>chi ; eng</language><subject>AMMUNITION ; BLASTING ; EARTH DRILLING ; FIXED CONSTRUCTIONS ; GALLERIES ; HEATING ; LARGE UNDERGROUND CHAMBERS ; LIGHTING ; MECHANICAL ENGINEERING ; MINING ; SHAFTS ; TUNNELS ; WEAPONS</subject><creationdate>2022</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20220422&DB=EPODOC&CC=CN&NR=114383480A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76516</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20220422&DB=EPODOC&CC=CN&NR=114383480A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>YAN ZHENHAO</creatorcontrib><creatorcontrib>HONG YONG</creatorcontrib><creatorcontrib>XIE HONGXING</creatorcontrib><creatorcontrib>WAN CHAOHAI</creatorcontrib><creatorcontrib>LI XIAODONG</creatorcontrib><creatorcontrib>CHEN XIAO</creatorcontrib><title>Blasting construction method for protecting main body structure of tunnel pile method subway station</title><description>The invention discloses a blasting construction method for a tunnel pile method subway station protection main body structure. Comprising the following steps: (1) excavating a vertical shaft: excavating an earthwork machine at the upper part of the vertical shaft, and excavating a vertical shaft body in a medium and slightly weathered rock stratum by adopting underholing blasting; (2) transverse channel blasting construction is conducted, specifically, mining method blasting is adopted, upper and lower step tunnel blasting is adopted, the arch-shaped part of the transverse channel is an upper step, a lower step is arranged below the arch-shaped part of the transverse channel, and during blasting, the upper step is firstly blasted, and blasting is conducted from top to bottom; (3) pilot tunnel blasting construction is conducted, specifically, according to a micro-step division method, the middle of a lower step is excavated firstly, and then a side wall is excavated; step blasting of vertical drilling is adopt</description><subject>AMMUNITION</subject><subject>BLASTING</subject><subject>EARTH DRILLING</subject><subject>FIXED CONSTRUCTIONS</subject><subject>GALLERIES</subject><subject>HEATING</subject><subject>LARGE UNDERGROUND CHAMBERS</subject><subject>LIGHTING</subject><subject>MECHANICAL ENGINEERING</subject><subject>MINING</subject><subject>SHAFTS</subject><subject>TUNNELS</subject><subject>WEAPONS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2022</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNzDsOwjAQRVE3FAjYw7AAJKKkSEsiEBUVfeTYY7DkzFj2WIjdo_DpqV5z3l0q2wWdxdMNDFOWVIx4JphQ7mzBcYKYWNC8yaQ9wcj2CR9ZEgI7kEKEAaIP-DvmMj70zPScW6uF0yHj5rsrtT0dr_15h5EHzFEbJJShv1RVU7d10-4P9T_mBWuBP8g</recordid><startdate>20220422</startdate><enddate>20220422</enddate><creator>YAN ZHENHAO</creator><creator>HONG YONG</creator><creator>XIE HONGXING</creator><creator>WAN CHAOHAI</creator><creator>LI XIAODONG</creator><creator>CHEN XIAO</creator><scope>EVB</scope></search><sort><creationdate>20220422</creationdate><title>Blasting construction method for protecting main body structure of tunnel pile method subway station</title><author>YAN ZHENHAO ; HONG YONG ; XIE HONGXING ; WAN CHAOHAI ; LI XIAODONG ; CHEN XIAO</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN114383480A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2022</creationdate><topic>AMMUNITION</topic><topic>BLASTING</topic><topic>EARTH DRILLING</topic><topic>FIXED CONSTRUCTIONS</topic><topic>GALLERIES</topic><topic>HEATING</topic><topic>LARGE UNDERGROUND CHAMBERS</topic><topic>LIGHTING</topic><topic>MECHANICAL ENGINEERING</topic><topic>MINING</topic><topic>SHAFTS</topic><topic>TUNNELS</topic><topic>WEAPONS</topic><toplevel>online_resources</toplevel><creatorcontrib>YAN ZHENHAO</creatorcontrib><creatorcontrib>HONG YONG</creatorcontrib><creatorcontrib>XIE HONGXING</creatorcontrib><creatorcontrib>WAN CHAOHAI</creatorcontrib><creatorcontrib>LI XIAODONG</creatorcontrib><creatorcontrib>CHEN XIAO</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>YAN ZHENHAO</au><au>HONG YONG</au><au>XIE HONGXING</au><au>WAN CHAOHAI</au><au>LI XIAODONG</au><au>CHEN XIAO</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Blasting construction method for protecting main body structure of tunnel pile method subway station</title><date>2022-04-22</date><risdate>2022</risdate><abstract>The invention discloses a blasting construction method for a tunnel pile method subway station protection main body structure. Comprising the following steps: (1) excavating a vertical shaft: excavating an earthwork machine at the upper part of the vertical shaft, and excavating a vertical shaft body in a medium and slightly weathered rock stratum by adopting underholing blasting; (2) transverse channel blasting construction is conducted, specifically, mining method blasting is adopted, upper and lower step tunnel blasting is adopted, the arch-shaped part of the transverse channel is an upper step, a lower step is arranged below the arch-shaped part of the transverse channel, and during blasting, the upper step is firstly blasted, and blasting is conducted from top to bottom; (3) pilot tunnel blasting construction is conducted, specifically, according to a micro-step division method, the middle of a lower step is excavated firstly, and then a side wall is excavated; step blasting of vertical drilling is adopt</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN114383480A |
source | esp@cenet |
subjects | AMMUNITION BLASTING EARTH DRILLING FIXED CONSTRUCTIONS GALLERIES HEATING LARGE UNDERGROUND CHAMBERS LIGHTING MECHANICAL ENGINEERING MINING SHAFTS TUNNELS WEAPONS |
title | Blasting construction method for protecting main body structure of tunnel pile method subway station |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-14T22%3A43%3A55IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=YAN%20ZHENHAO&rft.date=2022-04-22&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN114383480A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |