Power grid maintenance scheduling method based on load analysis
The invention provides a power grid maintenance scheduling method based on load analysis, and the method comprises the following steps: S1, obtaining historical meteorological data and load data of a power grid, and carrying out the normalization processing of the meteorological data and the load da...
Gespeichert in:
Hauptverfasser: | , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | ZHANG LANDAN LIU WEI LI JIARONG YANG LUYU ZHANG JINBIN YAN HUI ZENG MIN FU FEI CHEN SHUANG |
description | The invention provides a power grid maintenance scheduling method based on load analysis, and the method comprises the following steps: S1, obtaining historical meteorological data and load data of a power grid, and carrying out the normalization processing of the meteorological data and the load data; s2, determining maintenance declaration data; S3, constructing a neural network, and inputting the normalized meteorological data and load data into the neural network for training; s4, meteorological data and load data of the current power grid are obtained in real time and normalized, the normalized data are input into the neural network to be processed, and the daily power supply amount of overhaul is predicted; s5, adopting an improved particle swarm optimization algorithm to adjust the maintenance declaration data to enable the maintenance daily power supply quantity to be minimum as a target function, taking the determined maintenance declaration data as a maintenance scheduling basis when the maintenance |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN114330771A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN114330771A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN114330771A3</originalsourceid><addsrcrecordid>eNrjZLAPyC9PLVJIL8pMUchNzMwrSc1LzEtOVShOzkhNKc3JzEtXyE0tychPUUhKLE5NUcjPU8jJT0xRSMxLzKkszizmYWBNS8wpTuWF0twMim6uIc4euqkF-fGpxQWJyal5qSXxzn6GhibGxgbm5oaOxsSoAQCO-DDZ</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Power grid maintenance scheduling method based on load analysis</title><source>esp@cenet</source><creator>ZHANG LANDAN ; LIU WEI ; LI JIARONG ; YANG LUYU ; ZHANG JINBIN ; YAN HUI ; ZENG MIN ; FU FEI ; CHEN SHUANG</creator><creatorcontrib>ZHANG LANDAN ; LIU WEI ; LI JIARONG ; YANG LUYU ; ZHANG JINBIN ; YAN HUI ; ZENG MIN ; FU FEI ; CHEN SHUANG</creatorcontrib><description>The invention provides a power grid maintenance scheduling method based on load analysis, and the method comprises the following steps: S1, obtaining historical meteorological data and load data of a power grid, and carrying out the normalization processing of the meteorological data and the load data; s2, determining maintenance declaration data; S3, constructing a neural network, and inputting the normalized meteorological data and load data into the neural network for training; s4, meteorological data and load data of the current power grid are obtained in real time and normalized, the normalized data are input into the neural network to be processed, and the daily power supply amount of overhaul is predicted; s5, adopting an improved particle swarm optimization algorithm to adjust the maintenance declaration data to enable the maintenance daily power supply quantity to be minimum as a target function, taking the determined maintenance declaration data as a maintenance scheduling basis when the maintenance</description><language>chi ; eng</language><subject>CALCULATING ; COMPUTER SYSTEMS BASED ON SPECIFIC COMPUTATIONAL MODELS ; COMPUTING ; COUNTING ; DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES ; PHYSICS ; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</subject><creationdate>2022</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20220412&DB=EPODOC&CC=CN&NR=114330771A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20220412&DB=EPODOC&CC=CN&NR=114330771A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>ZHANG LANDAN</creatorcontrib><creatorcontrib>LIU WEI</creatorcontrib><creatorcontrib>LI JIARONG</creatorcontrib><creatorcontrib>YANG LUYU</creatorcontrib><creatorcontrib>ZHANG JINBIN</creatorcontrib><creatorcontrib>YAN HUI</creatorcontrib><creatorcontrib>ZENG MIN</creatorcontrib><creatorcontrib>FU FEI</creatorcontrib><creatorcontrib>CHEN SHUANG</creatorcontrib><title>Power grid maintenance scheduling method based on load analysis</title><description>The invention provides a power grid maintenance scheduling method based on load analysis, and the method comprises the following steps: S1, obtaining historical meteorological data and load data of a power grid, and carrying out the normalization processing of the meteorological data and the load data; s2, determining maintenance declaration data; S3, constructing a neural network, and inputting the normalized meteorological data and load data into the neural network for training; s4, meteorological data and load data of the current power grid are obtained in real time and normalized, the normalized data are input into the neural network to be processed, and the daily power supply amount of overhaul is predicted; s5, adopting an improved particle swarm optimization algorithm to adjust the maintenance declaration data to enable the maintenance daily power supply quantity to be minimum as a target function, taking the determined maintenance declaration data as a maintenance scheduling basis when the maintenance</description><subject>CALCULATING</subject><subject>COMPUTER SYSTEMS BASED ON SPECIFIC COMPUTATIONAL MODELS</subject><subject>COMPUTING</subject><subject>COUNTING</subject><subject>DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES</subject><subject>PHYSICS</subject><subject>SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2022</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZLAPyC9PLVJIL8pMUchNzMwrSc1LzEtOVShOzkhNKc3JzEtXyE0tychPUUhKLE5NUcjPU8jJT0xRSMxLzKkszizmYWBNS8wpTuWF0twMim6uIc4euqkF-fGpxQWJyal5qSXxzn6GhibGxgbm5oaOxsSoAQCO-DDZ</recordid><startdate>20220412</startdate><enddate>20220412</enddate><creator>ZHANG LANDAN</creator><creator>LIU WEI</creator><creator>LI JIARONG</creator><creator>YANG LUYU</creator><creator>ZHANG JINBIN</creator><creator>YAN HUI</creator><creator>ZENG MIN</creator><creator>FU FEI</creator><creator>CHEN SHUANG</creator><scope>EVB</scope></search><sort><creationdate>20220412</creationdate><title>Power grid maintenance scheduling method based on load analysis</title><author>ZHANG LANDAN ; LIU WEI ; LI JIARONG ; YANG LUYU ; ZHANG JINBIN ; YAN HUI ; ZENG MIN ; FU FEI ; CHEN SHUANG</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN114330771A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2022</creationdate><topic>CALCULATING</topic><topic>COMPUTER SYSTEMS BASED ON SPECIFIC COMPUTATIONAL MODELS</topic><topic>COMPUTING</topic><topic>COUNTING</topic><topic>DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES</topic><topic>PHYSICS</topic><topic>SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</topic><toplevel>online_resources</toplevel><creatorcontrib>ZHANG LANDAN</creatorcontrib><creatorcontrib>LIU WEI</creatorcontrib><creatorcontrib>LI JIARONG</creatorcontrib><creatorcontrib>YANG LUYU</creatorcontrib><creatorcontrib>ZHANG JINBIN</creatorcontrib><creatorcontrib>YAN HUI</creatorcontrib><creatorcontrib>ZENG MIN</creatorcontrib><creatorcontrib>FU FEI</creatorcontrib><creatorcontrib>CHEN SHUANG</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>ZHANG LANDAN</au><au>LIU WEI</au><au>LI JIARONG</au><au>YANG LUYU</au><au>ZHANG JINBIN</au><au>YAN HUI</au><au>ZENG MIN</au><au>FU FEI</au><au>CHEN SHUANG</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Power grid maintenance scheduling method based on load analysis</title><date>2022-04-12</date><risdate>2022</risdate><abstract>The invention provides a power grid maintenance scheduling method based on load analysis, and the method comprises the following steps: S1, obtaining historical meteorological data and load data of a power grid, and carrying out the normalization processing of the meteorological data and the load data; s2, determining maintenance declaration data; S3, constructing a neural network, and inputting the normalized meteorological data and load data into the neural network for training; s4, meteorological data and load data of the current power grid are obtained in real time and normalized, the normalized data are input into the neural network to be processed, and the daily power supply amount of overhaul is predicted; s5, adopting an improved particle swarm optimization algorithm to adjust the maintenance declaration data to enable the maintenance daily power supply quantity to be minimum as a target function, taking the determined maintenance declaration data as a maintenance scheduling basis when the maintenance</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN114330771A |
source | esp@cenet |
subjects | CALCULATING COMPUTER SYSTEMS BASED ON SPECIFIC COMPUTATIONAL MODELS COMPUTING COUNTING DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES PHYSICS SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR |
title | Power grid maintenance scheduling method based on load analysis |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-25T19%3A52%3A16IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=ZHANG%20LANDAN&rft.date=2022-04-12&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN114330771A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |