Large-section deep hole grouting construction method for complex stratum in water-rich area
The invention relates to a large-section deep hole grouting construction method for a complex stratum in a water-rich area, which belongs to the technical field of underground engineering construction, and is characterized in that different grouting slurries are selected by combining different surro...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | LIU ZHONGZHENG WU YUCHUAN ZHOU YINLIANG WANG HAO LI XIANGYANG GUO YUNKAI LI FEI KANG LIYE LV ZHUOLUN QIAN RUNYU BAI XIAOYU LIU HAIFENG NING SIYU HU LINGCHENG |
description | The invention relates to a large-section deep hole grouting construction method for a complex stratum in a water-rich area, which belongs to the technical field of underground engineering construction, and is characterized in that different grouting slurries are selected by combining different surrounding rock conditions, and the slurry with the optimal mix proportion is obtained by matching with a test in a laboratory. During site construction, the grout proportion is dynamically adjusted, the grout gelation time is adjusted, and the grouting and water stopping effect is guaranteed. The deep hole grouting hole sites are arranged according to the section of the pilot tunnel, in order to achieve the section water stopping effect and the waterless excavation condition, multiple sets of deep hole grouting hole sites are arranged along the side wall of the pilot tunnel at intervals, each set of deep hole grouting hole sites are continuously arranged in the vertical direction, and the number of each set of deep ho |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN114320363A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN114320363A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN114320363A3</originalsourceid><addsrcrecordid>eNqNirEKwkAQBdNYiPoP6wcEjCf2EhQLsbKzCMvlJTnI3R53G_TzDegHWA3MzLJ43jj1KDOsOgnUApEGGUF9kkld6MlKyJqmb_fQQVrqJM3exxFvmiPr5MkFerEilcnZgTiB18Wi4zFj8-Oq2F7Oj_paIkqDHNkiQJv6XlUHs9-ZozmZf54PnYk7sw</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Large-section deep hole grouting construction method for complex stratum in water-rich area</title><source>esp@cenet</source><creator>LIU ZHONGZHENG ; WU YUCHUAN ; ZHOU YINLIANG ; WANG HAO ; LI XIANGYANG ; GUO YUNKAI ; LI FEI ; KANG LIYE ; LV ZHUOLUN ; QIAN RUNYU ; BAI XIAOYU ; LIU HAIFENG ; NING SIYU ; HU LINGCHENG</creator><creatorcontrib>LIU ZHONGZHENG ; WU YUCHUAN ; ZHOU YINLIANG ; WANG HAO ; LI XIANGYANG ; GUO YUNKAI ; LI FEI ; KANG LIYE ; LV ZHUOLUN ; QIAN RUNYU ; BAI XIAOYU ; LIU HAIFENG ; NING SIYU ; HU LINGCHENG</creatorcontrib><description>The invention relates to a large-section deep hole grouting construction method for a complex stratum in a water-rich area, which belongs to the technical field of underground engineering construction, and is characterized in that different grouting slurries are selected by combining different surrounding rock conditions, and the slurry with the optimal mix proportion is obtained by matching with a test in a laboratory. During site construction, the grout proportion is dynamically adjusted, the grout gelation time is adjusted, and the grouting and water stopping effect is guaranteed. The deep hole grouting hole sites are arranged according to the section of the pilot tunnel, in order to achieve the section water stopping effect and the waterless excavation condition, multiple sets of deep hole grouting hole sites are arranged along the side wall of the pilot tunnel at intervals, each set of deep hole grouting hole sites are continuously arranged in the vertical direction, and the number of each set of deep ho</description><language>chi ; eng</language><subject>EARTH DRILLING ; FIXED CONSTRUCTIONS ; GALLERIES ; LARGE UNDERGROUND CHAMBERS ; MINING ; SHAFTS ; TUNNELS</subject><creationdate>2022</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20220412&DB=EPODOC&CC=CN&NR=114320363A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76290</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20220412&DB=EPODOC&CC=CN&NR=114320363A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>LIU ZHONGZHENG</creatorcontrib><creatorcontrib>WU YUCHUAN</creatorcontrib><creatorcontrib>ZHOU YINLIANG</creatorcontrib><creatorcontrib>WANG HAO</creatorcontrib><creatorcontrib>LI XIANGYANG</creatorcontrib><creatorcontrib>GUO YUNKAI</creatorcontrib><creatorcontrib>LI FEI</creatorcontrib><creatorcontrib>KANG LIYE</creatorcontrib><creatorcontrib>LV ZHUOLUN</creatorcontrib><creatorcontrib>QIAN RUNYU</creatorcontrib><creatorcontrib>BAI XIAOYU</creatorcontrib><creatorcontrib>LIU HAIFENG</creatorcontrib><creatorcontrib>NING SIYU</creatorcontrib><creatorcontrib>HU LINGCHENG</creatorcontrib><title>Large-section deep hole grouting construction method for complex stratum in water-rich area</title><description>The invention relates to a large-section deep hole grouting construction method for a complex stratum in a water-rich area, which belongs to the technical field of underground engineering construction, and is characterized in that different grouting slurries are selected by combining different surrounding rock conditions, and the slurry with the optimal mix proportion is obtained by matching with a test in a laboratory. During site construction, the grout proportion is dynamically adjusted, the grout gelation time is adjusted, and the grouting and water stopping effect is guaranteed. The deep hole grouting hole sites are arranged according to the section of the pilot tunnel, in order to achieve the section water stopping effect and the waterless excavation condition, multiple sets of deep hole grouting hole sites are arranged along the side wall of the pilot tunnel at intervals, each set of deep hole grouting hole sites are continuously arranged in the vertical direction, and the number of each set of deep ho</description><subject>EARTH DRILLING</subject><subject>FIXED CONSTRUCTIONS</subject><subject>GALLERIES</subject><subject>LARGE UNDERGROUND CHAMBERS</subject><subject>MINING</subject><subject>SHAFTS</subject><subject>TUNNELS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2022</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNirEKwkAQBdNYiPoP6wcEjCf2EhQLsbKzCMvlJTnI3R53G_TzDegHWA3MzLJ43jj1KDOsOgnUApEGGUF9kkld6MlKyJqmb_fQQVrqJM3exxFvmiPr5MkFerEilcnZgTiB18Wi4zFj8-Oq2F7Oj_paIkqDHNkiQJv6XlUHs9-ZozmZf54PnYk7sw</recordid><startdate>20220412</startdate><enddate>20220412</enddate><creator>LIU ZHONGZHENG</creator><creator>WU YUCHUAN</creator><creator>ZHOU YINLIANG</creator><creator>WANG HAO</creator><creator>LI XIANGYANG</creator><creator>GUO YUNKAI</creator><creator>LI FEI</creator><creator>KANG LIYE</creator><creator>LV ZHUOLUN</creator><creator>QIAN RUNYU</creator><creator>BAI XIAOYU</creator><creator>LIU HAIFENG</creator><creator>NING SIYU</creator><creator>HU LINGCHENG</creator><scope>EVB</scope></search><sort><creationdate>20220412</creationdate><title>Large-section deep hole grouting construction method for complex stratum in water-rich area</title><author>LIU ZHONGZHENG ; WU YUCHUAN ; ZHOU YINLIANG ; WANG HAO ; LI XIANGYANG ; GUO YUNKAI ; LI FEI ; KANG LIYE ; LV ZHUOLUN ; QIAN RUNYU ; BAI XIAOYU ; LIU HAIFENG ; NING SIYU ; HU LINGCHENG</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN114320363A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2022</creationdate><topic>EARTH DRILLING</topic><topic>FIXED CONSTRUCTIONS</topic><topic>GALLERIES</topic><topic>LARGE UNDERGROUND CHAMBERS</topic><topic>MINING</topic><topic>SHAFTS</topic><topic>TUNNELS</topic><toplevel>online_resources</toplevel><creatorcontrib>LIU ZHONGZHENG</creatorcontrib><creatorcontrib>WU YUCHUAN</creatorcontrib><creatorcontrib>ZHOU YINLIANG</creatorcontrib><creatorcontrib>WANG HAO</creatorcontrib><creatorcontrib>LI XIANGYANG</creatorcontrib><creatorcontrib>GUO YUNKAI</creatorcontrib><creatorcontrib>LI FEI</creatorcontrib><creatorcontrib>KANG LIYE</creatorcontrib><creatorcontrib>LV ZHUOLUN</creatorcontrib><creatorcontrib>QIAN RUNYU</creatorcontrib><creatorcontrib>BAI XIAOYU</creatorcontrib><creatorcontrib>LIU HAIFENG</creatorcontrib><creatorcontrib>NING SIYU</creatorcontrib><creatorcontrib>HU LINGCHENG</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>LIU ZHONGZHENG</au><au>WU YUCHUAN</au><au>ZHOU YINLIANG</au><au>WANG HAO</au><au>LI XIANGYANG</au><au>GUO YUNKAI</au><au>LI FEI</au><au>KANG LIYE</au><au>LV ZHUOLUN</au><au>QIAN RUNYU</au><au>BAI XIAOYU</au><au>LIU HAIFENG</au><au>NING SIYU</au><au>HU LINGCHENG</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Large-section deep hole grouting construction method for complex stratum in water-rich area</title><date>2022-04-12</date><risdate>2022</risdate><abstract>The invention relates to a large-section deep hole grouting construction method for a complex stratum in a water-rich area, which belongs to the technical field of underground engineering construction, and is characterized in that different grouting slurries are selected by combining different surrounding rock conditions, and the slurry with the optimal mix proportion is obtained by matching with a test in a laboratory. During site construction, the grout proportion is dynamically adjusted, the grout gelation time is adjusted, and the grouting and water stopping effect is guaranteed. The deep hole grouting hole sites are arranged according to the section of the pilot tunnel, in order to achieve the section water stopping effect and the waterless excavation condition, multiple sets of deep hole grouting hole sites are arranged along the side wall of the pilot tunnel at intervals, each set of deep hole grouting hole sites are continuously arranged in the vertical direction, and the number of each set of deep ho</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN114320363A |
source | esp@cenet |
subjects | EARTH DRILLING FIXED CONSTRUCTIONS GALLERIES LARGE UNDERGROUND CHAMBERS MINING SHAFTS TUNNELS |
title | Large-section deep hole grouting construction method for complex stratum in water-rich area |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-29T12%3A01%3A19IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=LIU%20ZHONGZHENG&rft.date=2022-04-12&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN114320363A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |