Large-section deep hole grouting construction method for complex stratum in water-rich area

The invention relates to a large-section deep hole grouting construction method for a complex stratum in a water-rich area, which belongs to the technical field of underground engineering construction, and is characterized in that different grouting slurries are selected by combining different surro...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: LIU ZHONGZHENG, WU YUCHUAN, ZHOU YINLIANG, WANG HAO, LI XIANGYANG, GUO YUNKAI, LI FEI, KANG LIYE, LV ZHUOLUN, QIAN RUNYU, BAI XIAOYU, LIU HAIFENG, NING SIYU, HU LINGCHENG
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator LIU ZHONGZHENG
WU YUCHUAN
ZHOU YINLIANG
WANG HAO
LI XIANGYANG
GUO YUNKAI
LI FEI
KANG LIYE
LV ZHUOLUN
QIAN RUNYU
BAI XIAOYU
LIU HAIFENG
NING SIYU
HU LINGCHENG
description The invention relates to a large-section deep hole grouting construction method for a complex stratum in a water-rich area, which belongs to the technical field of underground engineering construction, and is characterized in that different grouting slurries are selected by combining different surrounding rock conditions, and the slurry with the optimal mix proportion is obtained by matching with a test in a laboratory. During site construction, the grout proportion is dynamically adjusted, the grout gelation time is adjusted, and the grouting and water stopping effect is guaranteed. The deep hole grouting hole sites are arranged according to the section of the pilot tunnel, in order to achieve the section water stopping effect and the waterless excavation condition, multiple sets of deep hole grouting hole sites are arranged along the side wall of the pilot tunnel at intervals, each set of deep hole grouting hole sites are continuously arranged in the vertical direction, and the number of each set of deep ho
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN114320363A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN114320363A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN114320363A3</originalsourceid><addsrcrecordid>eNqNirEKwkAQBdNYiPoP6wcEjCf2EhQLsbKzCMvlJTnI3R53G_TzDegHWA3MzLJ43jj1KDOsOgnUApEGGUF9kkld6MlKyJqmb_fQQVrqJM3exxFvmiPr5MkFerEilcnZgTiB18Wi4zFj8-Oq2F7Oj_paIkqDHNkiQJv6XlUHs9-ZozmZf54PnYk7sw</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Large-section deep hole grouting construction method for complex stratum in water-rich area</title><source>esp@cenet</source><creator>LIU ZHONGZHENG ; WU YUCHUAN ; ZHOU YINLIANG ; WANG HAO ; LI XIANGYANG ; GUO YUNKAI ; LI FEI ; KANG LIYE ; LV ZHUOLUN ; QIAN RUNYU ; BAI XIAOYU ; LIU HAIFENG ; NING SIYU ; HU LINGCHENG</creator><creatorcontrib>LIU ZHONGZHENG ; WU YUCHUAN ; ZHOU YINLIANG ; WANG HAO ; LI XIANGYANG ; GUO YUNKAI ; LI FEI ; KANG LIYE ; LV ZHUOLUN ; QIAN RUNYU ; BAI XIAOYU ; LIU HAIFENG ; NING SIYU ; HU LINGCHENG</creatorcontrib><description>The invention relates to a large-section deep hole grouting construction method for a complex stratum in a water-rich area, which belongs to the technical field of underground engineering construction, and is characterized in that different grouting slurries are selected by combining different surrounding rock conditions, and the slurry with the optimal mix proportion is obtained by matching with a test in a laboratory. During site construction, the grout proportion is dynamically adjusted, the grout gelation time is adjusted, and the grouting and water stopping effect is guaranteed. The deep hole grouting hole sites are arranged according to the section of the pilot tunnel, in order to achieve the section water stopping effect and the waterless excavation condition, multiple sets of deep hole grouting hole sites are arranged along the side wall of the pilot tunnel at intervals, each set of deep hole grouting hole sites are continuously arranged in the vertical direction, and the number of each set of deep ho</description><language>chi ; eng</language><subject>EARTH DRILLING ; FIXED CONSTRUCTIONS ; GALLERIES ; LARGE UNDERGROUND CHAMBERS ; MINING ; SHAFTS ; TUNNELS</subject><creationdate>2022</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20220412&amp;DB=EPODOC&amp;CC=CN&amp;NR=114320363A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76290</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20220412&amp;DB=EPODOC&amp;CC=CN&amp;NR=114320363A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>LIU ZHONGZHENG</creatorcontrib><creatorcontrib>WU YUCHUAN</creatorcontrib><creatorcontrib>ZHOU YINLIANG</creatorcontrib><creatorcontrib>WANG HAO</creatorcontrib><creatorcontrib>LI XIANGYANG</creatorcontrib><creatorcontrib>GUO YUNKAI</creatorcontrib><creatorcontrib>LI FEI</creatorcontrib><creatorcontrib>KANG LIYE</creatorcontrib><creatorcontrib>LV ZHUOLUN</creatorcontrib><creatorcontrib>QIAN RUNYU</creatorcontrib><creatorcontrib>BAI XIAOYU</creatorcontrib><creatorcontrib>LIU HAIFENG</creatorcontrib><creatorcontrib>NING SIYU</creatorcontrib><creatorcontrib>HU LINGCHENG</creatorcontrib><title>Large-section deep hole grouting construction method for complex stratum in water-rich area</title><description>The invention relates to a large-section deep hole grouting construction method for a complex stratum in a water-rich area, which belongs to the technical field of underground engineering construction, and is characterized in that different grouting slurries are selected by combining different surrounding rock conditions, and the slurry with the optimal mix proportion is obtained by matching with a test in a laboratory. During site construction, the grout proportion is dynamically adjusted, the grout gelation time is adjusted, and the grouting and water stopping effect is guaranteed. The deep hole grouting hole sites are arranged according to the section of the pilot tunnel, in order to achieve the section water stopping effect and the waterless excavation condition, multiple sets of deep hole grouting hole sites are arranged along the side wall of the pilot tunnel at intervals, each set of deep hole grouting hole sites are continuously arranged in the vertical direction, and the number of each set of deep ho</description><subject>EARTH DRILLING</subject><subject>FIXED CONSTRUCTIONS</subject><subject>GALLERIES</subject><subject>LARGE UNDERGROUND CHAMBERS</subject><subject>MINING</subject><subject>SHAFTS</subject><subject>TUNNELS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2022</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNirEKwkAQBdNYiPoP6wcEjCf2EhQLsbKzCMvlJTnI3R53G_TzDegHWA3MzLJ43jj1KDOsOgnUApEGGUF9kkld6MlKyJqmb_fQQVrqJM3exxFvmiPr5MkFerEilcnZgTiB18Wi4zFj8-Oq2F7Oj_paIkqDHNkiQJv6XlUHs9-ZozmZf54PnYk7sw</recordid><startdate>20220412</startdate><enddate>20220412</enddate><creator>LIU ZHONGZHENG</creator><creator>WU YUCHUAN</creator><creator>ZHOU YINLIANG</creator><creator>WANG HAO</creator><creator>LI XIANGYANG</creator><creator>GUO YUNKAI</creator><creator>LI FEI</creator><creator>KANG LIYE</creator><creator>LV ZHUOLUN</creator><creator>QIAN RUNYU</creator><creator>BAI XIAOYU</creator><creator>LIU HAIFENG</creator><creator>NING SIYU</creator><creator>HU LINGCHENG</creator><scope>EVB</scope></search><sort><creationdate>20220412</creationdate><title>Large-section deep hole grouting construction method for complex stratum in water-rich area</title><author>LIU ZHONGZHENG ; WU YUCHUAN ; ZHOU YINLIANG ; WANG HAO ; LI XIANGYANG ; GUO YUNKAI ; LI FEI ; KANG LIYE ; LV ZHUOLUN ; QIAN RUNYU ; BAI XIAOYU ; LIU HAIFENG ; NING SIYU ; HU LINGCHENG</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN114320363A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2022</creationdate><topic>EARTH DRILLING</topic><topic>FIXED CONSTRUCTIONS</topic><topic>GALLERIES</topic><topic>LARGE UNDERGROUND CHAMBERS</topic><topic>MINING</topic><topic>SHAFTS</topic><topic>TUNNELS</topic><toplevel>online_resources</toplevel><creatorcontrib>LIU ZHONGZHENG</creatorcontrib><creatorcontrib>WU YUCHUAN</creatorcontrib><creatorcontrib>ZHOU YINLIANG</creatorcontrib><creatorcontrib>WANG HAO</creatorcontrib><creatorcontrib>LI XIANGYANG</creatorcontrib><creatorcontrib>GUO YUNKAI</creatorcontrib><creatorcontrib>LI FEI</creatorcontrib><creatorcontrib>KANG LIYE</creatorcontrib><creatorcontrib>LV ZHUOLUN</creatorcontrib><creatorcontrib>QIAN RUNYU</creatorcontrib><creatorcontrib>BAI XIAOYU</creatorcontrib><creatorcontrib>LIU HAIFENG</creatorcontrib><creatorcontrib>NING SIYU</creatorcontrib><creatorcontrib>HU LINGCHENG</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>LIU ZHONGZHENG</au><au>WU YUCHUAN</au><au>ZHOU YINLIANG</au><au>WANG HAO</au><au>LI XIANGYANG</au><au>GUO YUNKAI</au><au>LI FEI</au><au>KANG LIYE</au><au>LV ZHUOLUN</au><au>QIAN RUNYU</au><au>BAI XIAOYU</au><au>LIU HAIFENG</au><au>NING SIYU</au><au>HU LINGCHENG</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Large-section deep hole grouting construction method for complex stratum in water-rich area</title><date>2022-04-12</date><risdate>2022</risdate><abstract>The invention relates to a large-section deep hole grouting construction method for a complex stratum in a water-rich area, which belongs to the technical field of underground engineering construction, and is characterized in that different grouting slurries are selected by combining different surrounding rock conditions, and the slurry with the optimal mix proportion is obtained by matching with a test in a laboratory. During site construction, the grout proportion is dynamically adjusted, the grout gelation time is adjusted, and the grouting and water stopping effect is guaranteed. The deep hole grouting hole sites are arranged according to the section of the pilot tunnel, in order to achieve the section water stopping effect and the waterless excavation condition, multiple sets of deep hole grouting hole sites are arranged along the side wall of the pilot tunnel at intervals, each set of deep hole grouting hole sites are continuously arranged in the vertical direction, and the number of each set of deep ho</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN114320363A
source esp@cenet
subjects EARTH DRILLING
FIXED CONSTRUCTIONS
GALLERIES
LARGE UNDERGROUND CHAMBERS
MINING
SHAFTS
TUNNELS
title Large-section deep hole grouting construction method for complex stratum in water-rich area
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-29T12%3A01%3A19IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=LIU%20ZHONGZHENG&rft.date=2022-04-12&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN114320363A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true