High fill bottom drainage system and construction method

The invention discloses a high-fill bottom drainage system and a construction method, which comprises a main blind ditch, a secondary blind ditch and a branch blind ditch which are arranged according to the surface catchment area and flow rate, a gully with large catchment area and flow rate, a low-...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: TIAN TING, DONG JIAN, DONG YAJIE, PENG HAIYAN, ZHANG ANZHI, SUN CHENGHAI, WU JIANGBIN, LEE JEONG-WOONG, CHEN RUMEI, YANG RONGSHUANG, WENG YANMEI, FANG YIMING, LIU HAIFANG, LIU KEWEN, ZHAO LIZHOU, FENG SHICHUN, LUO YUTONG, JIA RONGGU
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator TIAN TING
DONG JIAN
DONG YAJIE
PENG HAIYAN
ZHANG ANZHI
SUN CHENGHAI
WU JIANGBIN
LEE JEONG-WOONG
CHEN RUMEI
YANG RONGSHUANG
WENG YANMEI
FANG YIMING
LIU HAIFANG
LIU KEWEN
ZHAO LIZHOU
FENG SHICHUN
LUO YUTONG
JIA RONGGU
description The invention discloses a high-fill bottom drainage system and a construction method, which comprises a main blind ditch, a secondary blind ditch and a branch blind ditch which are arranged according to the surface catchment area and flow rate, a gully with large catchment area and flow rate, a low-lying ditch which is provided with the main blind ditch along the main gully, and a small gully or the low-lying ditch which is provided with the secondary blind ditch, branch blind ditches should be arranged for spring water and seepage at exposed positions by combining the field terrain; the system further comprises a spring opening drainage structure and a horizontal drainage layer structure, the spring opening drainage structure is provided with spring opening blind ditches according to spring opening grouping to be connected with the main blind ditches, the horizontal drainage layer structure is arranged in a gravel pile or dynamic compaction replacement treatment area, and a horizontal drainage layer is arran
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN114293534A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN114293534A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN114293534A3</originalsourceid><addsrcrecordid>eNrjZLDwyEzPUEjLzMlRSMovKcnPVUgpSszMS0xPVSiuLC5JzVVIzEtRSM7PKy4pKk0uyczPU8hNLcnIT-FhYE1LzClO5YXS3AyKbq4hzh66qQX58anFBYnJqXmpJfHOfoaGJkaWxqbGJo7GxKgBABQMLno</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>High fill bottom drainage system and construction method</title><source>esp@cenet</source><creator>TIAN TING ; DONG JIAN ; DONG YAJIE ; PENG HAIYAN ; ZHANG ANZHI ; SUN CHENGHAI ; WU JIANGBIN ; LEE JEONG-WOONG ; CHEN RUMEI ; YANG RONGSHUANG ; WENG YANMEI ; FANG YIMING ; LIU HAIFANG ; LIU KEWEN ; ZHAO LIZHOU ; FENG SHICHUN ; LUO YUTONG ; JIA RONGGU</creator><creatorcontrib>TIAN TING ; DONG JIAN ; DONG YAJIE ; PENG HAIYAN ; ZHANG ANZHI ; SUN CHENGHAI ; WU JIANGBIN ; LEE JEONG-WOONG ; CHEN RUMEI ; YANG RONGSHUANG ; WENG YANMEI ; FANG YIMING ; LIU HAIFANG ; LIU KEWEN ; ZHAO LIZHOU ; FENG SHICHUN ; LUO YUTONG ; JIA RONGGU</creatorcontrib><description>The invention discloses a high-fill bottom drainage system and a construction method, which comprises a main blind ditch, a secondary blind ditch and a branch blind ditch which are arranged according to the surface catchment area and flow rate, a gully with large catchment area and flow rate, a low-lying ditch which is provided with the main blind ditch along the main gully, and a small gully or the low-lying ditch which is provided with the secondary blind ditch, branch blind ditches should be arranged for spring water and seepage at exposed positions by combining the field terrain; the system further comprises a spring opening drainage structure and a horizontal drainage layer structure, the spring opening drainage structure is provided with spring opening blind ditches according to spring opening grouping to be connected with the main blind ditches, the horizontal drainage layer structure is arranged in a gravel pile or dynamic compaction replacement treatment area, and a horizontal drainage layer is arran</description><language>chi ; eng</language><subject>CESSPOOLS ; EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; INSTALLATIONS OR METHODS FOR OBTAINING, COLLECTING, ORDISTRIBUTING WATER ; MEASURING ; MEASURING VOLUME, VOLUME FLOW, MASS FLOW OR LIQUIDLEVEL ; METERING BY VOLUME ; PHYSICS ; SEWERAGE ; SEWERS ; SOIL SHIFTING ; TESTING ; UNDERGROUND OR UNDERWATER STRUCTURES ; WATER SUPPLY</subject><creationdate>2022</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20220408&amp;DB=EPODOC&amp;CC=CN&amp;NR=114293534A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20220408&amp;DB=EPODOC&amp;CC=CN&amp;NR=114293534A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>TIAN TING</creatorcontrib><creatorcontrib>DONG JIAN</creatorcontrib><creatorcontrib>DONG YAJIE</creatorcontrib><creatorcontrib>PENG HAIYAN</creatorcontrib><creatorcontrib>ZHANG ANZHI</creatorcontrib><creatorcontrib>SUN CHENGHAI</creatorcontrib><creatorcontrib>WU JIANGBIN</creatorcontrib><creatorcontrib>LEE JEONG-WOONG</creatorcontrib><creatorcontrib>CHEN RUMEI</creatorcontrib><creatorcontrib>YANG RONGSHUANG</creatorcontrib><creatorcontrib>WENG YANMEI</creatorcontrib><creatorcontrib>FANG YIMING</creatorcontrib><creatorcontrib>LIU HAIFANG</creatorcontrib><creatorcontrib>LIU KEWEN</creatorcontrib><creatorcontrib>ZHAO LIZHOU</creatorcontrib><creatorcontrib>FENG SHICHUN</creatorcontrib><creatorcontrib>LUO YUTONG</creatorcontrib><creatorcontrib>JIA RONGGU</creatorcontrib><title>High fill bottom drainage system and construction method</title><description>The invention discloses a high-fill bottom drainage system and a construction method, which comprises a main blind ditch, a secondary blind ditch and a branch blind ditch which are arranged according to the surface catchment area and flow rate, a gully with large catchment area and flow rate, a low-lying ditch which is provided with the main blind ditch along the main gully, and a small gully or the low-lying ditch which is provided with the secondary blind ditch, branch blind ditches should be arranged for spring water and seepage at exposed positions by combining the field terrain; the system further comprises a spring opening drainage structure and a horizontal drainage layer structure, the spring opening drainage structure is provided with spring opening blind ditches according to spring opening grouping to be connected with the main blind ditches, the horizontal drainage layer structure is arranged in a gravel pile or dynamic compaction replacement treatment area, and a horizontal drainage layer is arran</description><subject>CESSPOOLS</subject><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>INSTALLATIONS OR METHODS FOR OBTAINING, COLLECTING, ORDISTRIBUTING WATER</subject><subject>MEASURING</subject><subject>MEASURING VOLUME, VOLUME FLOW, MASS FLOW OR LIQUIDLEVEL</subject><subject>METERING BY VOLUME</subject><subject>PHYSICS</subject><subject>SEWERAGE</subject><subject>SEWERS</subject><subject>SOIL SHIFTING</subject><subject>TESTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><subject>WATER SUPPLY</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2022</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZLDwyEzPUEjLzMlRSMovKcnPVUgpSszMS0xPVSiuLC5JzVVIzEtRSM7PKy4pKk0uyczPU8hNLcnIT-FhYE1LzClO5YXS3AyKbq4hzh66qQX58anFBYnJqXmpJfHOfoaGJkaWxqbGJo7GxKgBABQMLno</recordid><startdate>20220408</startdate><enddate>20220408</enddate><creator>TIAN TING</creator><creator>DONG JIAN</creator><creator>DONG YAJIE</creator><creator>PENG HAIYAN</creator><creator>ZHANG ANZHI</creator><creator>SUN CHENGHAI</creator><creator>WU JIANGBIN</creator><creator>LEE JEONG-WOONG</creator><creator>CHEN RUMEI</creator><creator>YANG RONGSHUANG</creator><creator>WENG YANMEI</creator><creator>FANG YIMING</creator><creator>LIU HAIFANG</creator><creator>LIU KEWEN</creator><creator>ZHAO LIZHOU</creator><creator>FENG SHICHUN</creator><creator>LUO YUTONG</creator><creator>JIA RONGGU</creator><scope>EVB</scope></search><sort><creationdate>20220408</creationdate><title>High fill bottom drainage system and construction method</title><author>TIAN TING ; DONG JIAN ; DONG YAJIE ; PENG HAIYAN ; ZHANG ANZHI ; SUN CHENGHAI ; WU JIANGBIN ; LEE JEONG-WOONG ; CHEN RUMEI ; YANG RONGSHUANG ; WENG YANMEI ; FANG YIMING ; LIU HAIFANG ; LIU KEWEN ; ZHAO LIZHOU ; FENG SHICHUN ; LUO YUTONG ; JIA RONGGU</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN114293534A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2022</creationdate><topic>CESSPOOLS</topic><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>INSTALLATIONS OR METHODS FOR OBTAINING, COLLECTING, ORDISTRIBUTING WATER</topic><topic>MEASURING</topic><topic>MEASURING VOLUME, VOLUME FLOW, MASS FLOW OR LIQUIDLEVEL</topic><topic>METERING BY VOLUME</topic><topic>PHYSICS</topic><topic>SEWERAGE</topic><topic>SEWERS</topic><topic>SOIL SHIFTING</topic><topic>TESTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><topic>WATER SUPPLY</topic><toplevel>online_resources</toplevel><creatorcontrib>TIAN TING</creatorcontrib><creatorcontrib>DONG JIAN</creatorcontrib><creatorcontrib>DONG YAJIE</creatorcontrib><creatorcontrib>PENG HAIYAN</creatorcontrib><creatorcontrib>ZHANG ANZHI</creatorcontrib><creatorcontrib>SUN CHENGHAI</creatorcontrib><creatorcontrib>WU JIANGBIN</creatorcontrib><creatorcontrib>LEE JEONG-WOONG</creatorcontrib><creatorcontrib>CHEN RUMEI</creatorcontrib><creatorcontrib>YANG RONGSHUANG</creatorcontrib><creatorcontrib>WENG YANMEI</creatorcontrib><creatorcontrib>FANG YIMING</creatorcontrib><creatorcontrib>LIU HAIFANG</creatorcontrib><creatorcontrib>LIU KEWEN</creatorcontrib><creatorcontrib>ZHAO LIZHOU</creatorcontrib><creatorcontrib>FENG SHICHUN</creatorcontrib><creatorcontrib>LUO YUTONG</creatorcontrib><creatorcontrib>JIA RONGGU</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>TIAN TING</au><au>DONG JIAN</au><au>DONG YAJIE</au><au>PENG HAIYAN</au><au>ZHANG ANZHI</au><au>SUN CHENGHAI</au><au>WU JIANGBIN</au><au>LEE JEONG-WOONG</au><au>CHEN RUMEI</au><au>YANG RONGSHUANG</au><au>WENG YANMEI</au><au>FANG YIMING</au><au>LIU HAIFANG</au><au>LIU KEWEN</au><au>ZHAO LIZHOU</au><au>FENG SHICHUN</au><au>LUO YUTONG</au><au>JIA RONGGU</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>High fill bottom drainage system and construction method</title><date>2022-04-08</date><risdate>2022</risdate><abstract>The invention discloses a high-fill bottom drainage system and a construction method, which comprises a main blind ditch, a secondary blind ditch and a branch blind ditch which are arranged according to the surface catchment area and flow rate, a gully with large catchment area and flow rate, a low-lying ditch which is provided with the main blind ditch along the main gully, and a small gully or the low-lying ditch which is provided with the secondary blind ditch, branch blind ditches should be arranged for spring water and seepage at exposed positions by combining the field terrain; the system further comprises a spring opening drainage structure and a horizontal drainage layer structure, the spring opening drainage structure is provided with spring opening blind ditches according to spring opening grouping to be connected with the main blind ditches, the horizontal drainage layer structure is arranged in a gravel pile or dynamic compaction replacement treatment area, and a horizontal drainage layer is arran</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN114293534A
source esp@cenet
subjects CESSPOOLS
EMBANKMENTS
EXCAVATIONS
FIXED CONSTRUCTIONS
FOUNDATIONS
HYDRAULIC ENGINEERING
INSTALLATIONS OR METHODS FOR OBTAINING, COLLECTING, ORDISTRIBUTING WATER
MEASURING
MEASURING VOLUME, VOLUME FLOW, MASS FLOW OR LIQUIDLEVEL
METERING BY VOLUME
PHYSICS
SEWERAGE
SEWERS
SOIL SHIFTING
TESTING
UNDERGROUND OR UNDERWATER STRUCTURES
WATER SUPPLY
title High fill bottom drainage system and construction method
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-20T12%3A16%3A26IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=TIAN%20TING&rft.date=2022-04-08&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN114293534A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true