High fill bottom drainage system and construction method
The invention discloses a high-fill bottom drainage system and a construction method, which comprises a main blind ditch, a secondary blind ditch and a branch blind ditch which are arranged according to the surface catchment area and flow rate, a gully with large catchment area and flow rate, a low-...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | TIAN TING DONG JIAN DONG YAJIE PENG HAIYAN ZHANG ANZHI SUN CHENGHAI WU JIANGBIN LEE JEONG-WOONG CHEN RUMEI YANG RONGSHUANG WENG YANMEI FANG YIMING LIU HAIFANG LIU KEWEN ZHAO LIZHOU FENG SHICHUN LUO YUTONG JIA RONGGU |
description | The invention discloses a high-fill bottom drainage system and a construction method, which comprises a main blind ditch, a secondary blind ditch and a branch blind ditch which are arranged according to the surface catchment area and flow rate, a gully with large catchment area and flow rate, a low-lying ditch which is provided with the main blind ditch along the main gully, and a small gully or the low-lying ditch which is provided with the secondary blind ditch, branch blind ditches should be arranged for spring water and seepage at exposed positions by combining the field terrain; the system further comprises a spring opening drainage structure and a horizontal drainage layer structure, the spring opening drainage structure is provided with spring opening blind ditches according to spring opening grouping to be connected with the main blind ditches, the horizontal drainage layer structure is arranged in a gravel pile or dynamic compaction replacement treatment area, and a horizontal drainage layer is arran |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN114293534A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN114293534A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN114293534A3</originalsourceid><addsrcrecordid>eNrjZLDwyEzPUEjLzMlRSMovKcnPVUgpSszMS0xPVSiuLC5JzVVIzEtRSM7PKy4pKk0uyczPU8hNLcnIT-FhYE1LzClO5YXS3AyKbq4hzh66qQX58anFBYnJqXmpJfHOfoaGJkaWxqbGJo7GxKgBABQMLno</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>High fill bottom drainage system and construction method</title><source>esp@cenet</source><creator>TIAN TING ; DONG JIAN ; DONG YAJIE ; PENG HAIYAN ; ZHANG ANZHI ; SUN CHENGHAI ; WU JIANGBIN ; LEE JEONG-WOONG ; CHEN RUMEI ; YANG RONGSHUANG ; WENG YANMEI ; FANG YIMING ; LIU HAIFANG ; LIU KEWEN ; ZHAO LIZHOU ; FENG SHICHUN ; LUO YUTONG ; JIA RONGGU</creator><creatorcontrib>TIAN TING ; DONG JIAN ; DONG YAJIE ; PENG HAIYAN ; ZHANG ANZHI ; SUN CHENGHAI ; WU JIANGBIN ; LEE JEONG-WOONG ; CHEN RUMEI ; YANG RONGSHUANG ; WENG YANMEI ; FANG YIMING ; LIU HAIFANG ; LIU KEWEN ; ZHAO LIZHOU ; FENG SHICHUN ; LUO YUTONG ; JIA RONGGU</creatorcontrib><description>The invention discloses a high-fill bottom drainage system and a construction method, which comprises a main blind ditch, a secondary blind ditch and a branch blind ditch which are arranged according to the surface catchment area and flow rate, a gully with large catchment area and flow rate, a low-lying ditch which is provided with the main blind ditch along the main gully, and a small gully or the low-lying ditch which is provided with the secondary blind ditch, branch blind ditches should be arranged for spring water and seepage at exposed positions by combining the field terrain; the system further comprises a spring opening drainage structure and a horizontal drainage layer structure, the spring opening drainage structure is provided with spring opening blind ditches according to spring opening grouping to be connected with the main blind ditches, the horizontal drainage layer structure is arranged in a gravel pile or dynamic compaction replacement treatment area, and a horizontal drainage layer is arran</description><language>chi ; eng</language><subject>CESSPOOLS ; EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; INSTALLATIONS OR METHODS FOR OBTAINING, COLLECTING, ORDISTRIBUTING WATER ; MEASURING ; MEASURING VOLUME, VOLUME FLOW, MASS FLOW OR LIQUIDLEVEL ; METERING BY VOLUME ; PHYSICS ; SEWERAGE ; SEWERS ; SOIL SHIFTING ; TESTING ; UNDERGROUND OR UNDERWATER STRUCTURES ; WATER SUPPLY</subject><creationdate>2022</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20220408&DB=EPODOC&CC=CN&NR=114293534A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20220408&DB=EPODOC&CC=CN&NR=114293534A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>TIAN TING</creatorcontrib><creatorcontrib>DONG JIAN</creatorcontrib><creatorcontrib>DONG YAJIE</creatorcontrib><creatorcontrib>PENG HAIYAN</creatorcontrib><creatorcontrib>ZHANG ANZHI</creatorcontrib><creatorcontrib>SUN CHENGHAI</creatorcontrib><creatorcontrib>WU JIANGBIN</creatorcontrib><creatorcontrib>LEE JEONG-WOONG</creatorcontrib><creatorcontrib>CHEN RUMEI</creatorcontrib><creatorcontrib>YANG RONGSHUANG</creatorcontrib><creatorcontrib>WENG YANMEI</creatorcontrib><creatorcontrib>FANG YIMING</creatorcontrib><creatorcontrib>LIU HAIFANG</creatorcontrib><creatorcontrib>LIU KEWEN</creatorcontrib><creatorcontrib>ZHAO LIZHOU</creatorcontrib><creatorcontrib>FENG SHICHUN</creatorcontrib><creatorcontrib>LUO YUTONG</creatorcontrib><creatorcontrib>JIA RONGGU</creatorcontrib><title>High fill bottom drainage system and construction method</title><description>The invention discloses a high-fill bottom drainage system and a construction method, which comprises a main blind ditch, a secondary blind ditch and a branch blind ditch which are arranged according to the surface catchment area and flow rate, a gully with large catchment area and flow rate, a low-lying ditch which is provided with the main blind ditch along the main gully, and a small gully or the low-lying ditch which is provided with the secondary blind ditch, branch blind ditches should be arranged for spring water and seepage at exposed positions by combining the field terrain; the system further comprises a spring opening drainage structure and a horizontal drainage layer structure, the spring opening drainage structure is provided with spring opening blind ditches according to spring opening grouping to be connected with the main blind ditches, the horizontal drainage layer structure is arranged in a gravel pile or dynamic compaction replacement treatment area, and a horizontal drainage layer is arran</description><subject>CESSPOOLS</subject><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>INSTALLATIONS OR METHODS FOR OBTAINING, COLLECTING, ORDISTRIBUTING WATER</subject><subject>MEASURING</subject><subject>MEASURING VOLUME, VOLUME FLOW, MASS FLOW OR LIQUIDLEVEL</subject><subject>METERING BY VOLUME</subject><subject>PHYSICS</subject><subject>SEWERAGE</subject><subject>SEWERS</subject><subject>SOIL SHIFTING</subject><subject>TESTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><subject>WATER SUPPLY</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2022</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZLDwyEzPUEjLzMlRSMovKcnPVUgpSszMS0xPVSiuLC5JzVVIzEtRSM7PKy4pKk0uyczPU8hNLcnIT-FhYE1LzClO5YXS3AyKbq4hzh66qQX58anFBYnJqXmpJfHOfoaGJkaWxqbGJo7GxKgBABQMLno</recordid><startdate>20220408</startdate><enddate>20220408</enddate><creator>TIAN TING</creator><creator>DONG JIAN</creator><creator>DONG YAJIE</creator><creator>PENG HAIYAN</creator><creator>ZHANG ANZHI</creator><creator>SUN CHENGHAI</creator><creator>WU JIANGBIN</creator><creator>LEE JEONG-WOONG</creator><creator>CHEN RUMEI</creator><creator>YANG RONGSHUANG</creator><creator>WENG YANMEI</creator><creator>FANG YIMING</creator><creator>LIU HAIFANG</creator><creator>LIU KEWEN</creator><creator>ZHAO LIZHOU</creator><creator>FENG SHICHUN</creator><creator>LUO YUTONG</creator><creator>JIA RONGGU</creator><scope>EVB</scope></search><sort><creationdate>20220408</creationdate><title>High fill bottom drainage system and construction method</title><author>TIAN TING ; DONG JIAN ; DONG YAJIE ; PENG HAIYAN ; ZHANG ANZHI ; SUN CHENGHAI ; WU JIANGBIN ; LEE JEONG-WOONG ; CHEN RUMEI ; YANG RONGSHUANG ; WENG YANMEI ; FANG YIMING ; LIU HAIFANG ; LIU KEWEN ; ZHAO LIZHOU ; FENG SHICHUN ; LUO YUTONG ; JIA RONGGU</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN114293534A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2022</creationdate><topic>CESSPOOLS</topic><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>INSTALLATIONS OR METHODS FOR OBTAINING, COLLECTING, ORDISTRIBUTING WATER</topic><topic>MEASURING</topic><topic>MEASURING VOLUME, VOLUME FLOW, MASS FLOW OR LIQUIDLEVEL</topic><topic>METERING BY VOLUME</topic><topic>PHYSICS</topic><topic>SEWERAGE</topic><topic>SEWERS</topic><topic>SOIL SHIFTING</topic><topic>TESTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><topic>WATER SUPPLY</topic><toplevel>online_resources</toplevel><creatorcontrib>TIAN TING</creatorcontrib><creatorcontrib>DONG JIAN</creatorcontrib><creatorcontrib>DONG YAJIE</creatorcontrib><creatorcontrib>PENG HAIYAN</creatorcontrib><creatorcontrib>ZHANG ANZHI</creatorcontrib><creatorcontrib>SUN CHENGHAI</creatorcontrib><creatorcontrib>WU JIANGBIN</creatorcontrib><creatorcontrib>LEE JEONG-WOONG</creatorcontrib><creatorcontrib>CHEN RUMEI</creatorcontrib><creatorcontrib>YANG RONGSHUANG</creatorcontrib><creatorcontrib>WENG YANMEI</creatorcontrib><creatorcontrib>FANG YIMING</creatorcontrib><creatorcontrib>LIU HAIFANG</creatorcontrib><creatorcontrib>LIU KEWEN</creatorcontrib><creatorcontrib>ZHAO LIZHOU</creatorcontrib><creatorcontrib>FENG SHICHUN</creatorcontrib><creatorcontrib>LUO YUTONG</creatorcontrib><creatorcontrib>JIA RONGGU</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>TIAN TING</au><au>DONG JIAN</au><au>DONG YAJIE</au><au>PENG HAIYAN</au><au>ZHANG ANZHI</au><au>SUN CHENGHAI</au><au>WU JIANGBIN</au><au>LEE JEONG-WOONG</au><au>CHEN RUMEI</au><au>YANG RONGSHUANG</au><au>WENG YANMEI</au><au>FANG YIMING</au><au>LIU HAIFANG</au><au>LIU KEWEN</au><au>ZHAO LIZHOU</au><au>FENG SHICHUN</au><au>LUO YUTONG</au><au>JIA RONGGU</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>High fill bottom drainage system and construction method</title><date>2022-04-08</date><risdate>2022</risdate><abstract>The invention discloses a high-fill bottom drainage system and a construction method, which comprises a main blind ditch, a secondary blind ditch and a branch blind ditch which are arranged according to the surface catchment area and flow rate, a gully with large catchment area and flow rate, a low-lying ditch which is provided with the main blind ditch along the main gully, and a small gully or the low-lying ditch which is provided with the secondary blind ditch, branch blind ditches should be arranged for spring water and seepage at exposed positions by combining the field terrain; the system further comprises a spring opening drainage structure and a horizontal drainage layer structure, the spring opening drainage structure is provided with spring opening blind ditches according to spring opening grouping to be connected with the main blind ditches, the horizontal drainage layer structure is arranged in a gravel pile or dynamic compaction replacement treatment area, and a horizontal drainage layer is arran</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN114293534A |
source | esp@cenet |
subjects | CESSPOOLS EMBANKMENTS EXCAVATIONS FIXED CONSTRUCTIONS FOUNDATIONS HYDRAULIC ENGINEERING INSTALLATIONS OR METHODS FOR OBTAINING, COLLECTING, ORDISTRIBUTING WATER MEASURING MEASURING VOLUME, VOLUME FLOW, MASS FLOW OR LIQUIDLEVEL METERING BY VOLUME PHYSICS SEWERAGE SEWERS SOIL SHIFTING TESTING UNDERGROUND OR UNDERWATER STRUCTURES WATER SUPPLY |
title | High fill bottom drainage system and construction method |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-20T12%3A16%3A26IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=TIAN%20TING&rft.date=2022-04-08&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN114293534A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |