Special-shaped upside-down well wall construction method for simultaneously building vertical shaft and throwing-out air shaft
The invention provides a special-shaped upside-down hanging well wall construction method for simultaneously building a vertical shaft and a throwing-out air shaft. A steel pipe pile is driven, and the pile bottom enters the position below the foundation pit bottom of the throwing-out air shaft and...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | WU QI FENG SHIJIE LIU PENG HE WEIGUO JIN RUOHONG DUAN WUZHE LI QINGFEI BI JINGDONG GAO XIN SUN WEIDONG WU HAO WANG WENJUAN |
description | The invention provides a special-shaped upside-down hanging well wall construction method for simultaneously building a vertical shaft and a throwing-out air shaft. A steel pipe pile is driven, and the pile bottom enters the position below the foundation pit bottom of the throwing-out air shaft and serves as a temporary soil retaining component before primary support construction of the throwing-out air shaft; an opening shallow foundation pit is excavated, and an opening locking ring structure is molded; a rock-soil body is excavated downwards through a well wall upside down method, a throwing-out air shaft primary support is constructed, and throwing-out air shaft temporary section steel diagonal bracings and temporary section steel inclined bracings are erected; when excavation is conducted to the bottom elevation of the throwing-out air shaft foundation pit, a throwing-out air shaft foundation pit cushion layer is laid, and meanwhile a top cover plate is constructed to recover part of the construction sit |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN114183144A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN114183144A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN114183144A3</originalsourceid><addsrcrecordid>eNqNjDEKAjEQRbexEPUO4wFShN3CVkSxstF-GZNZN5DNhGRisPHsLugBbP6D_z5_2byvkYxDr_KIkSyUmJ0lZbkGqOQ9VJzDcMiSihHHASaSkS0MnCC7qXjBQFyyf8G9OG9deMCTkjiDHubXQQCDBRkT19kpLnPh0letm8WAPtPmx1WzPR1vh7OiyD3liIYCSX-4aN3pXau7bt_-s_kAPhFJjA</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Special-shaped upside-down well wall construction method for simultaneously building vertical shaft and throwing-out air shaft</title><source>esp@cenet</source><creator>WU QI ; FENG SHIJIE ; LIU PENG ; HE WEIGUO ; JIN RUOHONG ; DUAN WUZHE ; LI QINGFEI ; BI JINGDONG ; GAO XIN ; SUN WEIDONG ; WU HAO ; WANG WENJUAN</creator><creatorcontrib>WU QI ; FENG SHIJIE ; LIU PENG ; HE WEIGUO ; JIN RUOHONG ; DUAN WUZHE ; LI QINGFEI ; BI JINGDONG ; GAO XIN ; SUN WEIDONG ; WU HAO ; WANG WENJUAN</creatorcontrib><description>The invention provides a special-shaped upside-down hanging well wall construction method for simultaneously building a vertical shaft and a throwing-out air shaft. A steel pipe pile is driven, and the pile bottom enters the position below the foundation pit bottom of the throwing-out air shaft and serves as a temporary soil retaining component before primary support construction of the throwing-out air shaft; an opening shallow foundation pit is excavated, and an opening locking ring structure is molded; a rock-soil body is excavated downwards through a well wall upside down method, a throwing-out air shaft primary support is constructed, and throwing-out air shaft temporary section steel diagonal bracings and temporary section steel inclined bracings are erected; when excavation is conducted to the bottom elevation of the throwing-out air shaft foundation pit, a throwing-out air shaft foundation pit cushion layer is laid, and meanwhile a top cover plate is constructed to recover part of the construction sit</description><language>chi ; eng</language><subject>EARTH DRILLING ; FIXED CONSTRUCTIONS ; GALLERIES ; LARGE UNDERGROUND CHAMBERS ; MINING ; SHAFTS ; TUNNELS</subject><creationdate>2022</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20220315&DB=EPODOC&CC=CN&NR=114183144A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20220315&DB=EPODOC&CC=CN&NR=114183144A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>WU QI</creatorcontrib><creatorcontrib>FENG SHIJIE</creatorcontrib><creatorcontrib>LIU PENG</creatorcontrib><creatorcontrib>HE WEIGUO</creatorcontrib><creatorcontrib>JIN RUOHONG</creatorcontrib><creatorcontrib>DUAN WUZHE</creatorcontrib><creatorcontrib>LI QINGFEI</creatorcontrib><creatorcontrib>BI JINGDONG</creatorcontrib><creatorcontrib>GAO XIN</creatorcontrib><creatorcontrib>SUN WEIDONG</creatorcontrib><creatorcontrib>WU HAO</creatorcontrib><creatorcontrib>WANG WENJUAN</creatorcontrib><title>Special-shaped upside-down well wall construction method for simultaneously building vertical shaft and throwing-out air shaft</title><description>The invention provides a special-shaped upside-down hanging well wall construction method for simultaneously building a vertical shaft and a throwing-out air shaft. A steel pipe pile is driven, and the pile bottom enters the position below the foundation pit bottom of the throwing-out air shaft and serves as a temporary soil retaining component before primary support construction of the throwing-out air shaft; an opening shallow foundation pit is excavated, and an opening locking ring structure is molded; a rock-soil body is excavated downwards through a well wall upside down method, a throwing-out air shaft primary support is constructed, and throwing-out air shaft temporary section steel diagonal bracings and temporary section steel inclined bracings are erected; when excavation is conducted to the bottom elevation of the throwing-out air shaft foundation pit, a throwing-out air shaft foundation pit cushion layer is laid, and meanwhile a top cover plate is constructed to recover part of the construction sit</description><subject>EARTH DRILLING</subject><subject>FIXED CONSTRUCTIONS</subject><subject>GALLERIES</subject><subject>LARGE UNDERGROUND CHAMBERS</subject><subject>MINING</subject><subject>SHAFTS</subject><subject>TUNNELS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2022</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNjDEKAjEQRbexEPUO4wFShN3CVkSxstF-GZNZN5DNhGRisPHsLugBbP6D_z5_2byvkYxDr_KIkSyUmJ0lZbkGqOQ9VJzDcMiSihHHASaSkS0MnCC7qXjBQFyyf8G9OG9deMCTkjiDHubXQQCDBRkT19kpLnPh0letm8WAPtPmx1WzPR1vh7OiyD3liIYCSX-4aN3pXau7bt_-s_kAPhFJjA</recordid><startdate>20220315</startdate><enddate>20220315</enddate><creator>WU QI</creator><creator>FENG SHIJIE</creator><creator>LIU PENG</creator><creator>HE WEIGUO</creator><creator>JIN RUOHONG</creator><creator>DUAN WUZHE</creator><creator>LI QINGFEI</creator><creator>BI JINGDONG</creator><creator>GAO XIN</creator><creator>SUN WEIDONG</creator><creator>WU HAO</creator><creator>WANG WENJUAN</creator><scope>EVB</scope></search><sort><creationdate>20220315</creationdate><title>Special-shaped upside-down well wall construction method for simultaneously building vertical shaft and throwing-out air shaft</title><author>WU QI ; FENG SHIJIE ; LIU PENG ; HE WEIGUO ; JIN RUOHONG ; DUAN WUZHE ; LI QINGFEI ; BI JINGDONG ; GAO XIN ; SUN WEIDONG ; WU HAO ; WANG WENJUAN</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN114183144A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2022</creationdate><topic>EARTH DRILLING</topic><topic>FIXED CONSTRUCTIONS</topic><topic>GALLERIES</topic><topic>LARGE UNDERGROUND CHAMBERS</topic><topic>MINING</topic><topic>SHAFTS</topic><topic>TUNNELS</topic><toplevel>online_resources</toplevel><creatorcontrib>WU QI</creatorcontrib><creatorcontrib>FENG SHIJIE</creatorcontrib><creatorcontrib>LIU PENG</creatorcontrib><creatorcontrib>HE WEIGUO</creatorcontrib><creatorcontrib>JIN RUOHONG</creatorcontrib><creatorcontrib>DUAN WUZHE</creatorcontrib><creatorcontrib>LI QINGFEI</creatorcontrib><creatorcontrib>BI JINGDONG</creatorcontrib><creatorcontrib>GAO XIN</creatorcontrib><creatorcontrib>SUN WEIDONG</creatorcontrib><creatorcontrib>WU HAO</creatorcontrib><creatorcontrib>WANG WENJUAN</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>WU QI</au><au>FENG SHIJIE</au><au>LIU PENG</au><au>HE WEIGUO</au><au>JIN RUOHONG</au><au>DUAN WUZHE</au><au>LI QINGFEI</au><au>BI JINGDONG</au><au>GAO XIN</au><au>SUN WEIDONG</au><au>WU HAO</au><au>WANG WENJUAN</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Special-shaped upside-down well wall construction method for simultaneously building vertical shaft and throwing-out air shaft</title><date>2022-03-15</date><risdate>2022</risdate><abstract>The invention provides a special-shaped upside-down hanging well wall construction method for simultaneously building a vertical shaft and a throwing-out air shaft. A steel pipe pile is driven, and the pile bottom enters the position below the foundation pit bottom of the throwing-out air shaft and serves as a temporary soil retaining component before primary support construction of the throwing-out air shaft; an opening shallow foundation pit is excavated, and an opening locking ring structure is molded; a rock-soil body is excavated downwards through a well wall upside down method, a throwing-out air shaft primary support is constructed, and throwing-out air shaft temporary section steel diagonal bracings and temporary section steel inclined bracings are erected; when excavation is conducted to the bottom elevation of the throwing-out air shaft foundation pit, a throwing-out air shaft foundation pit cushion layer is laid, and meanwhile a top cover plate is constructed to recover part of the construction sit</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN114183144A |
source | esp@cenet |
subjects | EARTH DRILLING FIXED CONSTRUCTIONS GALLERIES LARGE UNDERGROUND CHAMBERS MINING SHAFTS TUNNELS |
title | Special-shaped upside-down well wall construction method for simultaneously building vertical shaft and throwing-out air shaft |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-05T03%3A25%3A44IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=WU%20QI&rft.date=2022-03-15&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN114183144A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |