Soft rock chamber floor heave treatment supporting method

The invention relates to a soft rock chamber floor heave treatment supporting method which comprises the following steps that a reinforcing mesh is laid on an excavated chamber bottom plate, and concrete is sprayed to form a concrete surface layer; a plurality of steel beams are arranged on the conc...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: DONG GUIFENG, LYU SHUNZHANG, WANG JUN, MAO QINGFU
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator DONG GUIFENG
LYU SHUNZHANG
WANG JUN
MAO QINGFU
description The invention relates to a soft rock chamber floor heave treatment supporting method which comprises the following steps that a reinforcing mesh is laid on an excavated chamber bottom plate, and concrete is sprayed to form a concrete surface layer; a plurality of steel beams are arranged on the concrete surface layer in the transverse direction of the chamber, concrete is poured, a set interval is formed between every two adjacent steel beams, and the steel beams and the concrete jointly form a supporting layer; multiple sets of supporting pipes attached to the upper surface of the supporting layer are laid, the multiple sets of supporting pipes are longitudinally arranged along the chamber, the two ends of each supporting pipe are fixed to the side wall of the chamber through fixing parts and anchoring parts, and the anchoring parts are inserted into the surrounding rock; by the adoption of the method, the supporting effect is good, and the construction speed is high. 本发明涉及一种软岩硐室底鼓治理支护方法,包括以下步骤:在开挖好的硐室底板上,铺设
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN114151108A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN114151108A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN114151108A3</originalsourceid><addsrcrecordid>eNrjZLAMzk8rUSjKT85WSM5IzE1KLVJIy8nPL1LISE0sS1UoKUpNLMlNzStRKC4tKMgvKsnMS1fITS3JyE_hYWBNS8wpTuWF0twMim6uIc4euqkF-fGpxQWJyal5qSXxzn6GhiaGpoaGBhaOxsSoAQBWZS7k</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Soft rock chamber floor heave treatment supporting method</title><source>esp@cenet</source><creator>DONG GUIFENG ; LYU SHUNZHANG ; WANG JUN ; MAO QINGFU</creator><creatorcontrib>DONG GUIFENG ; LYU SHUNZHANG ; WANG JUN ; MAO QINGFU</creatorcontrib><description>The invention relates to a soft rock chamber floor heave treatment supporting method which comprises the following steps that a reinforcing mesh is laid on an excavated chamber bottom plate, and concrete is sprayed to form a concrete surface layer; a plurality of steel beams are arranged on the concrete surface layer in the transverse direction of the chamber, concrete is poured, a set interval is formed between every two adjacent steel beams, and the steel beams and the concrete jointly form a supporting layer; multiple sets of supporting pipes attached to the upper surface of the supporting layer are laid, the multiple sets of supporting pipes are longitudinally arranged along the chamber, the two ends of each supporting pipe are fixed to the side wall of the chamber through fixing parts and anchoring parts, and the anchoring parts are inserted into the surrounding rock; by the adoption of the method, the supporting effect is good, and the construction speed is high. 本发明涉及一种软岩硐室底鼓治理支护方法,包括以下步骤:在开挖好的硐室底板上,铺设</description><language>chi ; eng</language><subject>EARTH DRILLING ; FIXED CONSTRUCTIONS ; GALLERIES ; LARGE UNDERGROUND CHAMBERS ; MINING ; SHAFTS ; TUNNELS</subject><creationdate>2022</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20220308&amp;DB=EPODOC&amp;CC=CN&amp;NR=114151108A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20220308&amp;DB=EPODOC&amp;CC=CN&amp;NR=114151108A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>DONG GUIFENG</creatorcontrib><creatorcontrib>LYU SHUNZHANG</creatorcontrib><creatorcontrib>WANG JUN</creatorcontrib><creatorcontrib>MAO QINGFU</creatorcontrib><title>Soft rock chamber floor heave treatment supporting method</title><description>The invention relates to a soft rock chamber floor heave treatment supporting method which comprises the following steps that a reinforcing mesh is laid on an excavated chamber bottom plate, and concrete is sprayed to form a concrete surface layer; a plurality of steel beams are arranged on the concrete surface layer in the transverse direction of the chamber, concrete is poured, a set interval is formed between every two adjacent steel beams, and the steel beams and the concrete jointly form a supporting layer; multiple sets of supporting pipes attached to the upper surface of the supporting layer are laid, the multiple sets of supporting pipes are longitudinally arranged along the chamber, the two ends of each supporting pipe are fixed to the side wall of the chamber through fixing parts and anchoring parts, and the anchoring parts are inserted into the surrounding rock; by the adoption of the method, the supporting effect is good, and the construction speed is high. 本发明涉及一种软岩硐室底鼓治理支护方法,包括以下步骤:在开挖好的硐室底板上,铺设</description><subject>EARTH DRILLING</subject><subject>FIXED CONSTRUCTIONS</subject><subject>GALLERIES</subject><subject>LARGE UNDERGROUND CHAMBERS</subject><subject>MINING</subject><subject>SHAFTS</subject><subject>TUNNELS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2022</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZLAMzk8rUSjKT85WSM5IzE1KLVJIy8nPL1LISE0sS1UoKUpNLMlNzStRKC4tKMgvKsnMS1fITS3JyE_hYWBNS8wpTuWF0twMim6uIc4euqkF-fGpxQWJyal5qSXxzn6GhiaGpoaGBhaOxsSoAQBWZS7k</recordid><startdate>20220308</startdate><enddate>20220308</enddate><creator>DONG GUIFENG</creator><creator>LYU SHUNZHANG</creator><creator>WANG JUN</creator><creator>MAO QINGFU</creator><scope>EVB</scope></search><sort><creationdate>20220308</creationdate><title>Soft rock chamber floor heave treatment supporting method</title><author>DONG GUIFENG ; LYU SHUNZHANG ; WANG JUN ; MAO QINGFU</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN114151108A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2022</creationdate><topic>EARTH DRILLING</topic><topic>FIXED CONSTRUCTIONS</topic><topic>GALLERIES</topic><topic>LARGE UNDERGROUND CHAMBERS</topic><topic>MINING</topic><topic>SHAFTS</topic><topic>TUNNELS</topic><toplevel>online_resources</toplevel><creatorcontrib>DONG GUIFENG</creatorcontrib><creatorcontrib>LYU SHUNZHANG</creatorcontrib><creatorcontrib>WANG JUN</creatorcontrib><creatorcontrib>MAO QINGFU</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>DONG GUIFENG</au><au>LYU SHUNZHANG</au><au>WANG JUN</au><au>MAO QINGFU</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Soft rock chamber floor heave treatment supporting method</title><date>2022-03-08</date><risdate>2022</risdate><abstract>The invention relates to a soft rock chamber floor heave treatment supporting method which comprises the following steps that a reinforcing mesh is laid on an excavated chamber bottom plate, and concrete is sprayed to form a concrete surface layer; a plurality of steel beams are arranged on the concrete surface layer in the transverse direction of the chamber, concrete is poured, a set interval is formed between every two adjacent steel beams, and the steel beams and the concrete jointly form a supporting layer; multiple sets of supporting pipes attached to the upper surface of the supporting layer are laid, the multiple sets of supporting pipes are longitudinally arranged along the chamber, the two ends of each supporting pipe are fixed to the side wall of the chamber through fixing parts and anchoring parts, and the anchoring parts are inserted into the surrounding rock; by the adoption of the method, the supporting effect is good, and the construction speed is high. 本发明涉及一种软岩硐室底鼓治理支护方法,包括以下步骤:在开挖好的硐室底板上,铺设</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN114151108A
source esp@cenet
subjects EARTH DRILLING
FIXED CONSTRUCTIONS
GALLERIES
LARGE UNDERGROUND CHAMBERS
MINING
SHAFTS
TUNNELS
title Soft rock chamber floor heave treatment supporting method
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-26T11%3A30%3A39IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=DONG%20GUIFENG&rft.date=2022-03-08&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN114151108A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true