Reinforced concrete beam and fabricated structure construction method thereof

An reinforced concrete beam and a fabricated structure construction method thereof are provided. The reinforced concrete beam comprises a steel pipe column, a hole is formed in the steel pipe column, a steel bar of the reinforced concrete beam penetrates through the steel pipe column from the hole,...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: GUO CANCAN, LI BING, CHU YANHAI, WANG PENG, LUO MINGZU, DENG JUNFENG, ZHENG XINLONG, ZHANG ZHONGZHEN
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator GUO CANCAN
LI BING
CHU YANHAI
WANG PENG
LUO MINGZU
DENG JUNFENG
ZHENG XINLONG
ZHANG ZHONGZHEN
description An reinforced concrete beam and a fabricated structure construction method thereof are provided. The reinforced concrete beam comprises a steel pipe column, a hole is formed in the steel pipe column, a steel bar of the reinforced concrete beam penetrates through the steel pipe column from the hole, and a reinforcing steel plate is arranged at the hole; concrete is poured into the steel pipe column. The first-time concrete pouring in the steel pipe column utilizes a tower crane to hang a hopper, a hose is arranged at the bottom of the hopper, concrete is connected with one side of the steel pipe column through the hopper and the hose at the bottom of the hopper, and the concrete is poured into the steel pipe from one side of the steel pipe column. According to the steel pipe column of the reinforced concrete beam, a direct hole forming mode is adopted, the steel bars of the reinforced concrete beam penetrate through the steel pipe column from the holes, the overall size of the component is reduced, and in addi
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN114016621A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN114016621A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN114016621A3</originalsourceid><addsrcrecordid>eNqNijEKwkAQRdNYiHqH9QCCq5JegmKjhdiHyexfsmB2wuzk_ip6AKvH4715db0j5SjKCI4ls8LgOtDgKAcXqdPEZO9YTCe2SfHZvpIkuwHWS3DWQyFxWc0iPQtWPy6q9fn0aC4bjNKijMTIsLa5eX_Y-rre-eP-n-cFJCA2yw</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Reinforced concrete beam and fabricated structure construction method thereof</title><source>esp@cenet</source><creator>GUO CANCAN ; LI BING ; CHU YANHAI ; WANG PENG ; LUO MINGZU ; DENG JUNFENG ; ZHENG XINLONG ; ZHANG ZHONGZHEN</creator><creatorcontrib>GUO CANCAN ; LI BING ; CHU YANHAI ; WANG PENG ; LUO MINGZU ; DENG JUNFENG ; ZHENG XINLONG ; ZHANG ZHONGZHEN</creatorcontrib><description>An reinforced concrete beam and a fabricated structure construction method thereof are provided. The reinforced concrete beam comprises a steel pipe column, a hole is formed in the steel pipe column, a steel bar of the reinforced concrete beam penetrates through the steel pipe column from the hole, and a reinforcing steel plate is arranged at the hole; concrete is poured into the steel pipe column. The first-time concrete pouring in the steel pipe column utilizes a tower crane to hang a hopper, a hose is arranged at the bottom of the hopper, concrete is connected with one side of the steel pipe column through the hopper and the hose at the bottom of the hopper, and the concrete is poured into the steel pipe from one side of the steel pipe column. According to the steel pipe column of the reinforced concrete beam, a direct hole forming mode is adopted, the steel bars of the reinforced concrete beam penetrate through the steel pipe column from the holes, the overall size of the component is reduced, and in addi</description><language>chi ; eng</language><subject>BUILDING ; BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE ; CEILINGS ; FIXED CONSTRUCTIONS ; FLOORS ; FORMS ; GENERAL BUILDING CONSTRUCTIONS ; HANDLING BUILDING MATERIALS ON THE SITE ; INSULATION OR OTHER PROTECTION OF BUILDINGS ; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS ; ROOFS ; SCAFFOLDING ; SHUTTERING ; WALLS, e.g. PARTITIONS</subject><creationdate>2022</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20220208&amp;DB=EPODOC&amp;CC=CN&amp;NR=114016621A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20220208&amp;DB=EPODOC&amp;CC=CN&amp;NR=114016621A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>GUO CANCAN</creatorcontrib><creatorcontrib>LI BING</creatorcontrib><creatorcontrib>CHU YANHAI</creatorcontrib><creatorcontrib>WANG PENG</creatorcontrib><creatorcontrib>LUO MINGZU</creatorcontrib><creatorcontrib>DENG JUNFENG</creatorcontrib><creatorcontrib>ZHENG XINLONG</creatorcontrib><creatorcontrib>ZHANG ZHONGZHEN</creatorcontrib><title>Reinforced concrete beam and fabricated structure construction method thereof</title><description>An reinforced concrete beam and a fabricated structure construction method thereof are provided. The reinforced concrete beam comprises a steel pipe column, a hole is formed in the steel pipe column, a steel bar of the reinforced concrete beam penetrates through the steel pipe column from the hole, and a reinforcing steel plate is arranged at the hole; concrete is poured into the steel pipe column. The first-time concrete pouring in the steel pipe column utilizes a tower crane to hang a hopper, a hose is arranged at the bottom of the hopper, concrete is connected with one side of the steel pipe column through the hopper and the hose at the bottom of the hopper, and the concrete is poured into the steel pipe from one side of the steel pipe column. According to the steel pipe column of the reinforced concrete beam, a direct hole forming mode is adopted, the steel bars of the reinforced concrete beam penetrate through the steel pipe column from the holes, the overall size of the component is reduced, and in addi</description><subject>BUILDING</subject><subject>BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE</subject><subject>CEILINGS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FLOORS</subject><subject>FORMS</subject><subject>GENERAL BUILDING CONSTRUCTIONS</subject><subject>HANDLING BUILDING MATERIALS ON THE SITE</subject><subject>INSULATION OR OTHER PROTECTION OF BUILDINGS</subject><subject>REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS</subject><subject>ROOFS</subject><subject>SCAFFOLDING</subject><subject>SHUTTERING</subject><subject>WALLS, e.g. PARTITIONS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2022</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNijEKwkAQRdNYiHqH9QCCq5JegmKjhdiHyexfsmB2wuzk_ip6AKvH4715db0j5SjKCI4ls8LgOtDgKAcXqdPEZO9YTCe2SfHZvpIkuwHWS3DWQyFxWc0iPQtWPy6q9fn0aC4bjNKijMTIsLa5eX_Y-rre-eP-n-cFJCA2yw</recordid><startdate>20220208</startdate><enddate>20220208</enddate><creator>GUO CANCAN</creator><creator>LI BING</creator><creator>CHU YANHAI</creator><creator>WANG PENG</creator><creator>LUO MINGZU</creator><creator>DENG JUNFENG</creator><creator>ZHENG XINLONG</creator><creator>ZHANG ZHONGZHEN</creator><scope>EVB</scope></search><sort><creationdate>20220208</creationdate><title>Reinforced concrete beam and fabricated structure construction method thereof</title><author>GUO CANCAN ; LI BING ; CHU YANHAI ; WANG PENG ; LUO MINGZU ; DENG JUNFENG ; ZHENG XINLONG ; ZHANG ZHONGZHEN</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN114016621A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2022</creationdate><topic>BUILDING</topic><topic>BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE</topic><topic>CEILINGS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FLOORS</topic><topic>FORMS</topic><topic>GENERAL BUILDING CONSTRUCTIONS</topic><topic>HANDLING BUILDING MATERIALS ON THE SITE</topic><topic>INSULATION OR OTHER PROTECTION OF BUILDINGS</topic><topic>REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS</topic><topic>ROOFS</topic><topic>SCAFFOLDING</topic><topic>SHUTTERING</topic><topic>WALLS, e.g. PARTITIONS</topic><toplevel>online_resources</toplevel><creatorcontrib>GUO CANCAN</creatorcontrib><creatorcontrib>LI BING</creatorcontrib><creatorcontrib>CHU YANHAI</creatorcontrib><creatorcontrib>WANG PENG</creatorcontrib><creatorcontrib>LUO MINGZU</creatorcontrib><creatorcontrib>DENG JUNFENG</creatorcontrib><creatorcontrib>ZHENG XINLONG</creatorcontrib><creatorcontrib>ZHANG ZHONGZHEN</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>GUO CANCAN</au><au>LI BING</au><au>CHU YANHAI</au><au>WANG PENG</au><au>LUO MINGZU</au><au>DENG JUNFENG</au><au>ZHENG XINLONG</au><au>ZHANG ZHONGZHEN</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Reinforced concrete beam and fabricated structure construction method thereof</title><date>2022-02-08</date><risdate>2022</risdate><abstract>An reinforced concrete beam and a fabricated structure construction method thereof are provided. The reinforced concrete beam comprises a steel pipe column, a hole is formed in the steel pipe column, a steel bar of the reinforced concrete beam penetrates through the steel pipe column from the hole, and a reinforcing steel plate is arranged at the hole; concrete is poured into the steel pipe column. The first-time concrete pouring in the steel pipe column utilizes a tower crane to hang a hopper, a hose is arranged at the bottom of the hopper, concrete is connected with one side of the steel pipe column through the hopper and the hose at the bottom of the hopper, and the concrete is poured into the steel pipe from one side of the steel pipe column. According to the steel pipe column of the reinforced concrete beam, a direct hole forming mode is adopted, the steel bars of the reinforced concrete beam penetrate through the steel pipe column from the holes, the overall size of the component is reduced, and in addi</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN114016621A
source esp@cenet
subjects BUILDING
BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE
CEILINGS
FIXED CONSTRUCTIONS
FLOORS
FORMS
GENERAL BUILDING CONSTRUCTIONS
HANDLING BUILDING MATERIALS ON THE SITE
INSULATION OR OTHER PROTECTION OF BUILDINGS
REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS
ROOFS
SCAFFOLDING
SHUTTERING
WALLS, e.g. PARTITIONS
title Reinforced concrete beam and fabricated structure construction method thereof
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-24T00%3A01%3A58IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=GUO%20CANCAN&rft.date=2022-02-08&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN114016621A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true