Power grid peak load optimization method
The invention discloses a power grid peak load optimization method. According to the method, the peak load of a power grid is optimized through three measures, namely newly adding photovoltaic installation, implementing demand response and configuring chemical energy storage. The method comprises th...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | REN XIJUN WANG BAO YE YUTONG MA YANRU YANG MIN LYU LONGBIAO ZHU LIUZHU SHAO XIAOYU ZHANG LI LIU LI YANG NA |
description | The invention discloses a power grid peak load optimization method. According to the method, the peak load of a power grid is optimized through three measures, namely newly adding photovoltaic installation, implementing demand response and configuring chemical energy storage. The method comprises the following steps of: a peak load optimization model is established, the target function of the model is the minimum total cost of the peak load reduction of a power grid; and then constraint conditions are determined for solving. According to the method, the optimization model with the minimum total cost as the target is constructed, the optimal scheme for peak load optimization is provided through comparison, the overall efficiency of a power system is improved, and a feasible theoretical method is provided for regional peak load development trend analysis and coping strategy formulation.
本发明公开了一种电网尖峰负荷优化方法,通过新增光伏装机、实施需求响应和配置化学储能三个措施优化电网尖峰负荷,首先建立尖峰负荷优化模型,模型的目标函数为电网尖峰负荷削减的总成本最小,然后确定约束条件用于求解。该方法构建以总成本最小为目标的优化模型,对比提 |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN113972699A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN113972699A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN113972699A3</originalsourceid><addsrcrecordid>eNrjZNAIyC9PLVJIL8pMUShITcxWyMlPTFHILyjJzM2sSizJzM9TyE0tychP4WFgTUvMKU7lhdLcDIpuriHOHrqpBfnxqcUFicmpeakl8c5-hobGluZGZpaWjsbEqAEAzdgoaQ</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Power grid peak load optimization method</title><source>esp@cenet</source><creator>REN XIJUN ; WANG BAO ; YE YUTONG ; MA YANRU ; YANG MIN ; LYU LONGBIAO ; ZHU LIUZHU ; SHAO XIAOYU ; ZHANG LI ; LIU LI ; YANG NA</creator><creatorcontrib>REN XIJUN ; WANG BAO ; YE YUTONG ; MA YANRU ; YANG MIN ; LYU LONGBIAO ; ZHU LIUZHU ; SHAO XIAOYU ; ZHANG LI ; LIU LI ; YANG NA</creatorcontrib><description>The invention discloses a power grid peak load optimization method. According to the method, the peak load of a power grid is optimized through three measures, namely newly adding photovoltaic installation, implementing demand response and configuring chemical energy storage. The method comprises the following steps of: a peak load optimization model is established, the target function of the model is the minimum total cost of the peak load reduction of a power grid; and then constraint conditions are determined for solving. According to the method, the optimization model with the minimum total cost as the target is constructed, the optimal scheme for peak load optimization is provided through comparison, the overall efficiency of a power system is improved, and a feasible theoretical method is provided for regional peak load development trend analysis and coping strategy formulation.
本发明公开了一种电网尖峰负荷优化方法,通过新增光伏装机、实施需求响应和配置化学储能三个措施优化电网尖峰负荷,首先建立尖峰负荷优化模型,模型的目标函数为电网尖峰负荷削减的总成本最小,然后确定约束条件用于求解。该方法构建以总成本最小为目标的优化模型,对比提</description><language>chi ; eng</language><subject>CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTINGELECTRIC POWER ; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER ; ELECTRICITY ; GENERATION ; SYSTEMS FOR STORING ELECTRIC ENERGY</subject><creationdate>2022</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20220125&DB=EPODOC&CC=CN&NR=113972699A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76289</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20220125&DB=EPODOC&CC=CN&NR=113972699A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>REN XIJUN</creatorcontrib><creatorcontrib>WANG BAO</creatorcontrib><creatorcontrib>YE YUTONG</creatorcontrib><creatorcontrib>MA YANRU</creatorcontrib><creatorcontrib>YANG MIN</creatorcontrib><creatorcontrib>LYU LONGBIAO</creatorcontrib><creatorcontrib>ZHU LIUZHU</creatorcontrib><creatorcontrib>SHAO XIAOYU</creatorcontrib><creatorcontrib>ZHANG LI</creatorcontrib><creatorcontrib>LIU LI</creatorcontrib><creatorcontrib>YANG NA</creatorcontrib><title>Power grid peak load optimization method</title><description>The invention discloses a power grid peak load optimization method. According to the method, the peak load of a power grid is optimized through three measures, namely newly adding photovoltaic installation, implementing demand response and configuring chemical energy storage. The method comprises the following steps of: a peak load optimization model is established, the target function of the model is the minimum total cost of the peak load reduction of a power grid; and then constraint conditions are determined for solving. According to the method, the optimization model with the minimum total cost as the target is constructed, the optimal scheme for peak load optimization is provided through comparison, the overall efficiency of a power system is improved, and a feasible theoretical method is provided for regional peak load development trend analysis and coping strategy formulation.
本发明公开了一种电网尖峰负荷优化方法,通过新增光伏装机、实施需求响应和配置化学储能三个措施优化电网尖峰负荷,首先建立尖峰负荷优化模型,模型的目标函数为电网尖峰负荷削减的总成本最小,然后确定约束条件用于求解。该方法构建以总成本最小为目标的优化模型,对比提</description><subject>CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTINGELECTRIC POWER</subject><subject>CONVERSION OR DISTRIBUTION OF ELECTRIC POWER</subject><subject>ELECTRICITY</subject><subject>GENERATION</subject><subject>SYSTEMS FOR STORING ELECTRIC ENERGY</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2022</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZNAIyC9PLVJIL8pMUShITcxWyMlPTFHILyjJzM2sSizJzM9TyE0tychP4WFgTUvMKU7lhdLcDIpuriHOHrqpBfnxqcUFicmpeakl8c5-hobGluZGZpaWjsbEqAEAzdgoaQ</recordid><startdate>20220125</startdate><enddate>20220125</enddate><creator>REN XIJUN</creator><creator>WANG BAO</creator><creator>YE YUTONG</creator><creator>MA YANRU</creator><creator>YANG MIN</creator><creator>LYU LONGBIAO</creator><creator>ZHU LIUZHU</creator><creator>SHAO XIAOYU</creator><creator>ZHANG LI</creator><creator>LIU LI</creator><creator>YANG NA</creator><scope>EVB</scope></search><sort><creationdate>20220125</creationdate><title>Power grid peak load optimization method</title><author>REN XIJUN ; WANG BAO ; YE YUTONG ; MA YANRU ; YANG MIN ; LYU LONGBIAO ; ZHU LIUZHU ; SHAO XIAOYU ; ZHANG LI ; LIU LI ; YANG NA</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN113972699A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2022</creationdate><topic>CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTINGELECTRIC POWER</topic><topic>CONVERSION OR DISTRIBUTION OF ELECTRIC POWER</topic><topic>ELECTRICITY</topic><topic>GENERATION</topic><topic>SYSTEMS FOR STORING ELECTRIC ENERGY</topic><toplevel>online_resources</toplevel><creatorcontrib>REN XIJUN</creatorcontrib><creatorcontrib>WANG BAO</creatorcontrib><creatorcontrib>YE YUTONG</creatorcontrib><creatorcontrib>MA YANRU</creatorcontrib><creatorcontrib>YANG MIN</creatorcontrib><creatorcontrib>LYU LONGBIAO</creatorcontrib><creatorcontrib>ZHU LIUZHU</creatorcontrib><creatorcontrib>SHAO XIAOYU</creatorcontrib><creatorcontrib>ZHANG LI</creatorcontrib><creatorcontrib>LIU LI</creatorcontrib><creatorcontrib>YANG NA</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>REN XIJUN</au><au>WANG BAO</au><au>YE YUTONG</au><au>MA YANRU</au><au>YANG MIN</au><au>LYU LONGBIAO</au><au>ZHU LIUZHU</au><au>SHAO XIAOYU</au><au>ZHANG LI</au><au>LIU LI</au><au>YANG NA</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Power grid peak load optimization method</title><date>2022-01-25</date><risdate>2022</risdate><abstract>The invention discloses a power grid peak load optimization method. According to the method, the peak load of a power grid is optimized through three measures, namely newly adding photovoltaic installation, implementing demand response and configuring chemical energy storage. The method comprises the following steps of: a peak load optimization model is established, the target function of the model is the minimum total cost of the peak load reduction of a power grid; and then constraint conditions are determined for solving. According to the method, the optimization model with the minimum total cost as the target is constructed, the optimal scheme for peak load optimization is provided through comparison, the overall efficiency of a power system is improved, and a feasible theoretical method is provided for regional peak load development trend analysis and coping strategy formulation.
本发明公开了一种电网尖峰负荷优化方法,通过新增光伏装机、实施需求响应和配置化学储能三个措施优化电网尖峰负荷,首先建立尖峰负荷优化模型,模型的目标函数为电网尖峰负荷削减的总成本最小,然后确定约束条件用于求解。该方法构建以总成本最小为目标的优化模型,对比提</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN113972699A |
source | esp@cenet |
subjects | CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTINGELECTRIC POWER CONVERSION OR DISTRIBUTION OF ELECTRIC POWER ELECTRICITY GENERATION SYSTEMS FOR STORING ELECTRIC ENERGY |
title | Power grid peak load optimization method |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-08T05%3A25%3A48IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=REN%20XIJUN&rft.date=2022-01-25&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN113972699A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |