Longitudinal separation type steel casing sinking and pulling-out construction method

The invention relates to the technical field of building equipment, and discloses a longitudinal separation type steel casing sinking and pulling-out construction method. The construction method comprises the following steps of assembling a steel casing, sinking the steel casing, pulling out the ste...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: CHEN LEFENG, ZHU XIAO, ZHOU XIUJIAN, HE XIAOLONG, LIU ZHAOFENG
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator CHEN LEFENG
ZHU XIAO
ZHOU XIUJIAN
HE XIAOLONG
LIU ZHAOFENG
description The invention relates to the technical field of building equipment, and discloses a longitudinal separation type steel casing sinking and pulling-out construction method. The construction method comprises the following steps of assembling a steel casing, sinking the steel casing, pulling out the steel casing, upwards pulling out a connecting piece from a longitudinal operation cavity through a hoisting machine so as to separate flange strips, and correspondingly taking out a left half casing and a right half casing which are separated. According to the construction method, after a fishing spear penetrates through a fishing hole in the connecting piece, the hoisting machine is used for pulling the connecting piece out of the flange strips, so that the matched flange strips are separated, the separation of the left half casing and the right half casing is realized, the separated left half casing and right half casing are respectively pulled out upwards from soil, the resistance and the influence on a concrete p
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN113863303A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN113863303A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN113863303A3</originalsourceid><addsrcrecordid>eNqNizEKwkAQRdNYiHqH8QABw4LYSlAsxErrMOyOcck6s2RmC29vFA9g894r_p9Xt7NwH62EyJhAKeOIFoXBXplAjSiBR43cw4ThY-QAuaQ0dS3FwAurjcV_b0-yh4RlNbtjUlr9vKjWx8O1PdWUpSPN6InJuvbSNG63dW7j9u6fzRtXkDoa</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Longitudinal separation type steel casing sinking and pulling-out construction method</title><source>esp@cenet</source><creator>CHEN LEFENG ; ZHU XIAO ; ZHOU XIUJIAN ; HE XIAOLONG ; LIU ZHAOFENG</creator><creatorcontrib>CHEN LEFENG ; ZHU XIAO ; ZHOU XIUJIAN ; HE XIAOLONG ; LIU ZHAOFENG</creatorcontrib><description>The invention relates to the technical field of building equipment, and discloses a longitudinal separation type steel casing sinking and pulling-out construction method. The construction method comprises the following steps of assembling a steel casing, sinking the steel casing, pulling out the steel casing, upwards pulling out a connecting piece from a longitudinal operation cavity through a hoisting machine so as to separate flange strips, and correspondingly taking out a left half casing and a right half casing which are separated. According to the construction method, after a fishing spear penetrates through a fishing hole in the connecting piece, the hoisting machine is used for pulling the connecting piece out of the flange strips, so that the matched flange strips are separated, the separation of the left half casing and the right half casing is realized, the separated left half casing and right half casing are respectively pulled out upwards from soil, the resistance and the influence on a concrete p</description><language>chi ; eng</language><subject>EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; SOIL SHIFTING ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>2021</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20211231&amp;DB=EPODOC&amp;CC=CN&amp;NR=113863303A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76289</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20211231&amp;DB=EPODOC&amp;CC=CN&amp;NR=113863303A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>CHEN LEFENG</creatorcontrib><creatorcontrib>ZHU XIAO</creatorcontrib><creatorcontrib>ZHOU XIUJIAN</creatorcontrib><creatorcontrib>HE XIAOLONG</creatorcontrib><creatorcontrib>LIU ZHAOFENG</creatorcontrib><title>Longitudinal separation type steel casing sinking and pulling-out construction method</title><description>The invention relates to the technical field of building equipment, and discloses a longitudinal separation type steel casing sinking and pulling-out construction method. The construction method comprises the following steps of assembling a steel casing, sinking the steel casing, pulling out the steel casing, upwards pulling out a connecting piece from a longitudinal operation cavity through a hoisting machine so as to separate flange strips, and correspondingly taking out a left half casing and a right half casing which are separated. According to the construction method, after a fishing spear penetrates through a fishing hole in the connecting piece, the hoisting machine is used for pulling the connecting piece out of the flange strips, so that the matched flange strips are separated, the separation of the left half casing and the right half casing is realized, the separated left half casing and right half casing are respectively pulled out upwards from soil, the resistance and the influence on a concrete p</description><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>SOIL SHIFTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2021</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNizEKwkAQRdNYiHqH8QABw4LYSlAsxErrMOyOcck6s2RmC29vFA9g894r_p9Xt7NwH62EyJhAKeOIFoXBXplAjSiBR43cw4ThY-QAuaQ0dS3FwAurjcV_b0-yh4RlNbtjUlr9vKjWx8O1PdWUpSPN6InJuvbSNG63dW7j9u6fzRtXkDoa</recordid><startdate>20211231</startdate><enddate>20211231</enddate><creator>CHEN LEFENG</creator><creator>ZHU XIAO</creator><creator>ZHOU XIUJIAN</creator><creator>HE XIAOLONG</creator><creator>LIU ZHAOFENG</creator><scope>EVB</scope></search><sort><creationdate>20211231</creationdate><title>Longitudinal separation type steel casing sinking and pulling-out construction method</title><author>CHEN LEFENG ; ZHU XIAO ; ZHOU XIUJIAN ; HE XIAOLONG ; LIU ZHAOFENG</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN113863303A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2021</creationdate><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>SOIL SHIFTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>CHEN LEFENG</creatorcontrib><creatorcontrib>ZHU XIAO</creatorcontrib><creatorcontrib>ZHOU XIUJIAN</creatorcontrib><creatorcontrib>HE XIAOLONG</creatorcontrib><creatorcontrib>LIU ZHAOFENG</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>CHEN LEFENG</au><au>ZHU XIAO</au><au>ZHOU XIUJIAN</au><au>HE XIAOLONG</au><au>LIU ZHAOFENG</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Longitudinal separation type steel casing sinking and pulling-out construction method</title><date>2021-12-31</date><risdate>2021</risdate><abstract>The invention relates to the technical field of building equipment, and discloses a longitudinal separation type steel casing sinking and pulling-out construction method. The construction method comprises the following steps of assembling a steel casing, sinking the steel casing, pulling out the steel casing, upwards pulling out a connecting piece from a longitudinal operation cavity through a hoisting machine so as to separate flange strips, and correspondingly taking out a left half casing and a right half casing which are separated. According to the construction method, after a fishing spear penetrates through a fishing hole in the connecting piece, the hoisting machine is used for pulling the connecting piece out of the flange strips, so that the matched flange strips are separated, the separation of the left half casing and the right half casing is realized, the separated left half casing and right half casing are respectively pulled out upwards from soil, the resistance and the influence on a concrete p</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN113863303A
source esp@cenet
subjects EMBANKMENTS
EXCAVATIONS
FIXED CONSTRUCTIONS
FOUNDATIONS
HYDRAULIC ENGINEERING
SOIL SHIFTING
UNDERGROUND OR UNDERWATER STRUCTURES
title Longitudinal separation type steel casing sinking and pulling-out construction method
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-05T13%3A05%3A26IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=CHEN%20LEFENG&rft.date=2021-12-31&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN113863303A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true