Construction method of thin-wall concrete hollow floor

The invention discloses a construction method of a thin-wall concrete hollow floor. The construction method comprises the following steps of (S1) erecting a scaffold as a formwork supporting frame, and laying bottom formworks, wherein the outer edge spacing of the bottom formworks is 18 to 25 cm; an...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: ZHONG XIAO, YUAN YIHUA, QING YUAN, LIU BO, ZOU MING, LU GONGLIE, GUO WEIXIN, CHENG GUOYONG, LIU LIAN, SU SHUANQUN, WANG KE, PAN MING
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator ZHONG XIAO
YUAN YIHUA
QING YUAN
LIU BO
ZOU MING
LU GONGLIE
GUO WEIXIN
CHENG GUOYONG
LIU LIAN
SU SHUANQUN
WANG KE
PAN MING
description The invention discloses a construction method of a thin-wall concrete hollow floor. The construction method comprises the following steps of (S1) erecting a scaffold as a formwork supporting frame, and laying bottom formworks, wherein the outer edge spacing of the bottom formworks is 18 to 25 cm; and (S2) binding floor bottom steel bars, wherein a plurality of vertical bars are bound on the upper surfaces of the bottom steel bars according to design requirements when the bottom steel bars are bound, one to two vertical bars are arranged between every two core molds, one to two vertical bars are arranged between the core molds and the formworks, and the bottom steel bars are supported and cushioned on the bottom formworks through cushion blocks. According to the construction method, the core molds can be effectively prevented from floating upwards. 本发明公开了一种薄壁混凝土空心楼盖施工方法,包括以下步骤:S1、搭设脚手架作为支模架,铺设底层模板,底层模板的外楞间距为18~25cm;S2、绑扎楼板底层钢筋,绑扎底层钢筋时,按设计要求在底层钢筋的上表面绑扎若干竖筋,使每两个芯模之间均具有1~2个竖筋、芯模与模板之间具有1~2个竖筋,底层钢筋通过垫块支垫于底层模板上。本发明能
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN113802745A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN113802745A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN113802745A3</originalsourceid><addsrcrecordid>eNrjZDBzzs8rLikqTS7JzM9TyE0tychPUchPUyjJyMzTLU_MyVFIzs9LLkotSVXIyM_JyS9XSMvJzy_iYWBNS8wpTuWF0twMim6uIc4euqkF-fGpxQWJyal5qSXxzn6GhsYWBkbmJqaOxsSoAQDDbC3W</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Construction method of thin-wall concrete hollow floor</title><source>esp@cenet</source><creator>ZHONG XIAO ; YUAN YIHUA ; QING YUAN ; LIU BO ; ZOU MING ; LU GONGLIE ; GUO WEIXIN ; CHENG GUOYONG ; LIU LIAN ; SU SHUANQUN ; WANG KE ; PAN MING</creator><creatorcontrib>ZHONG XIAO ; YUAN YIHUA ; QING YUAN ; LIU BO ; ZOU MING ; LU GONGLIE ; GUO WEIXIN ; CHENG GUOYONG ; LIU LIAN ; SU SHUANQUN ; WANG KE ; PAN MING</creatorcontrib><description>The invention discloses a construction method of a thin-wall concrete hollow floor. The construction method comprises the following steps of (S1) erecting a scaffold as a formwork supporting frame, and laying bottom formworks, wherein the outer edge spacing of the bottom formworks is 18 to 25 cm; and (S2) binding floor bottom steel bars, wherein a plurality of vertical bars are bound on the upper surfaces of the bottom steel bars according to design requirements when the bottom steel bars are bound, one to two vertical bars are arranged between every two core molds, one to two vertical bars are arranged between the core molds and the formworks, and the bottom steel bars are supported and cushioned on the bottom formworks through cushion blocks. According to the construction method, the core molds can be effectively prevented from floating upwards. 本发明公开了一种薄壁混凝土空心楼盖施工方法,包括以下步骤:S1、搭设脚手架作为支模架,铺设底层模板,底层模板的外楞间距为18~25cm;S2、绑扎楼板底层钢筋,绑扎底层钢筋时,按设计要求在底层钢筋的上表面绑扎若干竖筋,使每两个芯模之间均具有1~2个竖筋、芯模与模板之间具有1~2个竖筋,底层钢筋通过垫块支垫于底层模板上。本发明能</description><language>chi ; eng</language><subject>BUILDING ; BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE ; CEILINGS ; FIXED CONSTRUCTIONS ; FLOORS ; FORMS ; GENERAL BUILDING CONSTRUCTIONS ; HANDLING BUILDING MATERIALS ON THE SITE ; INSULATION OR OTHER PROTECTION OF BUILDINGS ; MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVINGMATERIAL ; PERFORMING OPERATIONS ; PUNCHING METAL ; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS ; ROOFS ; SCAFFOLDING ; SHUTTERING ; TRANSPORTING ; WALLS, e.g. PARTITIONS ; WORKING OR PROCESSING OF METAL WIRE</subject><creationdate>2021</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20211217&amp;DB=EPODOC&amp;CC=CN&amp;NR=113802745A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,777,882,25545,76296</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20211217&amp;DB=EPODOC&amp;CC=CN&amp;NR=113802745A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>ZHONG XIAO</creatorcontrib><creatorcontrib>YUAN YIHUA</creatorcontrib><creatorcontrib>QING YUAN</creatorcontrib><creatorcontrib>LIU BO</creatorcontrib><creatorcontrib>ZOU MING</creatorcontrib><creatorcontrib>LU GONGLIE</creatorcontrib><creatorcontrib>GUO WEIXIN</creatorcontrib><creatorcontrib>CHENG GUOYONG</creatorcontrib><creatorcontrib>LIU LIAN</creatorcontrib><creatorcontrib>SU SHUANQUN</creatorcontrib><creatorcontrib>WANG KE</creatorcontrib><creatorcontrib>PAN MING</creatorcontrib><title>Construction method of thin-wall concrete hollow floor</title><description>The invention discloses a construction method of a thin-wall concrete hollow floor. The construction method comprises the following steps of (S1) erecting a scaffold as a formwork supporting frame, and laying bottom formworks, wherein the outer edge spacing of the bottom formworks is 18 to 25 cm; and (S2) binding floor bottom steel bars, wherein a plurality of vertical bars are bound on the upper surfaces of the bottom steel bars according to design requirements when the bottom steel bars are bound, one to two vertical bars are arranged between every two core molds, one to two vertical bars are arranged between the core molds and the formworks, and the bottom steel bars are supported and cushioned on the bottom formworks through cushion blocks. According to the construction method, the core molds can be effectively prevented from floating upwards. 本发明公开了一种薄壁混凝土空心楼盖施工方法,包括以下步骤:S1、搭设脚手架作为支模架,铺设底层模板,底层模板的外楞间距为18~25cm;S2、绑扎楼板底层钢筋,绑扎底层钢筋时,按设计要求在底层钢筋的上表面绑扎若干竖筋,使每两个芯模之间均具有1~2个竖筋、芯模与模板之间具有1~2个竖筋,底层钢筋通过垫块支垫于底层模板上。本发明能</description><subject>BUILDING</subject><subject>BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE</subject><subject>CEILINGS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FLOORS</subject><subject>FORMS</subject><subject>GENERAL BUILDING CONSTRUCTIONS</subject><subject>HANDLING BUILDING MATERIALS ON THE SITE</subject><subject>INSULATION OR OTHER PROTECTION OF BUILDINGS</subject><subject>MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVINGMATERIAL</subject><subject>PERFORMING OPERATIONS</subject><subject>PUNCHING METAL</subject><subject>REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS</subject><subject>ROOFS</subject><subject>SCAFFOLDING</subject><subject>SHUTTERING</subject><subject>TRANSPORTING</subject><subject>WALLS, e.g. PARTITIONS</subject><subject>WORKING OR PROCESSING OF METAL WIRE</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2021</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZDBzzs8rLikqTS7JzM9TyE0tychPUchPUyjJyMzTLU_MyVFIzs9LLkotSVXIyM_JyS9XSMvJzy_iYWBNS8wpTuWF0twMim6uIc4euqkF-fGpxQWJyal5qSXxzn6GhsYWBkbmJqaOxsSoAQDDbC3W</recordid><startdate>20211217</startdate><enddate>20211217</enddate><creator>ZHONG XIAO</creator><creator>YUAN YIHUA</creator><creator>QING YUAN</creator><creator>LIU BO</creator><creator>ZOU MING</creator><creator>LU GONGLIE</creator><creator>GUO WEIXIN</creator><creator>CHENG GUOYONG</creator><creator>LIU LIAN</creator><creator>SU SHUANQUN</creator><creator>WANG KE</creator><creator>PAN MING</creator><scope>EVB</scope></search><sort><creationdate>20211217</creationdate><title>Construction method of thin-wall concrete hollow floor</title><author>ZHONG XIAO ; YUAN YIHUA ; QING YUAN ; LIU BO ; ZOU MING ; LU GONGLIE ; GUO WEIXIN ; CHENG GUOYONG ; LIU LIAN ; SU SHUANQUN ; WANG KE ; PAN MING</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN113802745A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2021</creationdate><topic>BUILDING</topic><topic>BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE</topic><topic>CEILINGS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FLOORS</topic><topic>FORMS</topic><topic>GENERAL BUILDING CONSTRUCTIONS</topic><topic>HANDLING BUILDING MATERIALS ON THE SITE</topic><topic>INSULATION OR OTHER PROTECTION OF BUILDINGS</topic><topic>MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVINGMATERIAL</topic><topic>PERFORMING OPERATIONS</topic><topic>PUNCHING METAL</topic><topic>REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS</topic><topic>ROOFS</topic><topic>SCAFFOLDING</topic><topic>SHUTTERING</topic><topic>TRANSPORTING</topic><topic>WALLS, e.g. PARTITIONS</topic><topic>WORKING OR PROCESSING OF METAL WIRE</topic><toplevel>online_resources</toplevel><creatorcontrib>ZHONG XIAO</creatorcontrib><creatorcontrib>YUAN YIHUA</creatorcontrib><creatorcontrib>QING YUAN</creatorcontrib><creatorcontrib>LIU BO</creatorcontrib><creatorcontrib>ZOU MING</creatorcontrib><creatorcontrib>LU GONGLIE</creatorcontrib><creatorcontrib>GUO WEIXIN</creatorcontrib><creatorcontrib>CHENG GUOYONG</creatorcontrib><creatorcontrib>LIU LIAN</creatorcontrib><creatorcontrib>SU SHUANQUN</creatorcontrib><creatorcontrib>WANG KE</creatorcontrib><creatorcontrib>PAN MING</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>ZHONG XIAO</au><au>YUAN YIHUA</au><au>QING YUAN</au><au>LIU BO</au><au>ZOU MING</au><au>LU GONGLIE</au><au>GUO WEIXIN</au><au>CHENG GUOYONG</au><au>LIU LIAN</au><au>SU SHUANQUN</au><au>WANG KE</au><au>PAN MING</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Construction method of thin-wall concrete hollow floor</title><date>2021-12-17</date><risdate>2021</risdate><abstract>The invention discloses a construction method of a thin-wall concrete hollow floor. The construction method comprises the following steps of (S1) erecting a scaffold as a formwork supporting frame, and laying bottom formworks, wherein the outer edge spacing of the bottom formworks is 18 to 25 cm; and (S2) binding floor bottom steel bars, wherein a plurality of vertical bars are bound on the upper surfaces of the bottom steel bars according to design requirements when the bottom steel bars are bound, one to two vertical bars are arranged between every two core molds, one to two vertical bars are arranged between the core molds and the formworks, and the bottom steel bars are supported and cushioned on the bottom formworks through cushion blocks. According to the construction method, the core molds can be effectively prevented from floating upwards. 本发明公开了一种薄壁混凝土空心楼盖施工方法,包括以下步骤:S1、搭设脚手架作为支模架,铺设底层模板,底层模板的外楞间距为18~25cm;S2、绑扎楼板底层钢筋,绑扎底层钢筋时,按设计要求在底层钢筋的上表面绑扎若干竖筋,使每两个芯模之间均具有1~2个竖筋、芯模与模板之间具有1~2个竖筋,底层钢筋通过垫块支垫于底层模板上。本发明能</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN113802745A
source esp@cenet
subjects BUILDING
BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE
CEILINGS
FIXED CONSTRUCTIONS
FLOORS
FORMS
GENERAL BUILDING CONSTRUCTIONS
HANDLING BUILDING MATERIALS ON THE SITE
INSULATION OR OTHER PROTECTION OF BUILDINGS
MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVINGMATERIAL
PERFORMING OPERATIONS
PUNCHING METAL
REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS
ROOFS
SCAFFOLDING
SHUTTERING
TRANSPORTING
WALLS, e.g. PARTITIONS
WORKING OR PROCESSING OF METAL WIRE
title Construction method of thin-wall concrete hollow floor
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-19T15%3A01%3A16IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=ZHONG%20XIAO&rft.date=2021-12-17&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN113802745A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true