Cable dragging type oil-water well layered continuous testing system and implementation method

The invention provides a cable dragging type oil-water well layered continuous testing system and an implementation method. The method comprises the following steps that 1, a transition rod is selected; 2, all parts of the oil-water well layered continuous testing system are installed through electr...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: DAI HUI, SONG WENPING, QIAO JIANXIN, WANG JUNSONG, QIANG YAN, CUI MENG, YANG HUA, FAN DENAN, YANG CHENHUI, LI YEPENG, DONG LICHAO, ZHOU JIN, SHEN TIANDAN, CAO XIONGKE
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator DAI HUI
SONG WENPING
QIAO JIANXIN
WANG JUNSONG
QIANG YAN
CUI MENG
YANG HUA
FAN DENAN
YANG CHENHUI
LI YEPENG
DONG LICHAO
ZHOU JIN
SHEN TIANDAN
CAO XIONGKE
description The invention provides a cable dragging type oil-water well layered continuous testing system and an implementation method. The method comprises the following steps that 1, a transition rod is selected; 2, all parts of the oil-water well layered continuous testing system are installed through electric connection and mechanical connection; 3, the oil-water well layered continuous testing system is put into a well through a cable, and a well depth measuring unit feeds back the depth of the oil-water well layered continuous testing system to a ground pressure measuring instrument in real time; 4, after the specified depth is reached, an upper setting rubber sleeve and a lower setting rubber sleeve form sealing, and meanwhile an anchoring mechanism is used for anchoring; 5, a monitoring unit is activated by the ground pressure measuring instrument, and single-layer-section testing is carried out on underground indexes; and 6, after the single-layer-section testing is completed, the system can be moved to a next t
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN113719275A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN113719275A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN113719275A3</originalsourceid><addsrcrecordid>eNqNyjEKwkAQBdA0FqLeYTxAihgkWEpQrKyslTH7jQuzs0t2QsjtRfAAVq95y-Le8lNAbuC-99qTzQkUvZQTGwaaIELCMwY46qKa1zGOmQzZvj3P2RCI1ZEPSRCgxuajUoC9o1sXixdLxubnqtieT7f2UiLFB3LiDgp7tNeqqpvqsGv2x_qf8wGApD1L</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Cable dragging type oil-water well layered continuous testing system and implementation method</title><source>esp@cenet</source><creator>DAI HUI ; SONG WENPING ; QIAO JIANXIN ; WANG JUNSONG ; QIANG YAN ; CUI MENG ; YANG HUA ; FAN DENAN ; YANG CHENHUI ; LI YEPENG ; DONG LICHAO ; ZHOU JIN ; SHEN TIANDAN ; CAO XIONGKE</creator><creatorcontrib>DAI HUI ; SONG WENPING ; QIAO JIANXIN ; WANG JUNSONG ; QIANG YAN ; CUI MENG ; YANG HUA ; FAN DENAN ; YANG CHENHUI ; LI YEPENG ; DONG LICHAO ; ZHOU JIN ; SHEN TIANDAN ; CAO XIONGKE</creatorcontrib><description>The invention provides a cable dragging type oil-water well layered continuous testing system and an implementation method. The method comprises the following steps that 1, a transition rod is selected; 2, all parts of the oil-water well layered continuous testing system are installed through electric connection and mechanical connection; 3, the oil-water well layered continuous testing system is put into a well through a cable, and a well depth measuring unit feeds back the depth of the oil-water well layered continuous testing system to a ground pressure measuring instrument in real time; 4, after the specified depth is reached, an upper setting rubber sleeve and a lower setting rubber sleeve form sealing, and meanwhile an anchoring mechanism is used for anchoring; 5, a monitoring unit is activated by the ground pressure measuring instrument, and single-layer-section testing is carried out on underground indexes; and 6, after the single-layer-section testing is completed, the system can be moved to a next t</description><language>chi ; eng</language><subject>EARTH DRILLING ; EARTH DRILLING, e.g. DEEP DRILLING ; FIXED CONSTRUCTIONS ; MINING ; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS</subject><creationdate>2021</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20211130&amp;DB=EPODOC&amp;CC=CN&amp;NR=113719275A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20211130&amp;DB=EPODOC&amp;CC=CN&amp;NR=113719275A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>DAI HUI</creatorcontrib><creatorcontrib>SONG WENPING</creatorcontrib><creatorcontrib>QIAO JIANXIN</creatorcontrib><creatorcontrib>WANG JUNSONG</creatorcontrib><creatorcontrib>QIANG YAN</creatorcontrib><creatorcontrib>CUI MENG</creatorcontrib><creatorcontrib>YANG HUA</creatorcontrib><creatorcontrib>FAN DENAN</creatorcontrib><creatorcontrib>YANG CHENHUI</creatorcontrib><creatorcontrib>LI YEPENG</creatorcontrib><creatorcontrib>DONG LICHAO</creatorcontrib><creatorcontrib>ZHOU JIN</creatorcontrib><creatorcontrib>SHEN TIANDAN</creatorcontrib><creatorcontrib>CAO XIONGKE</creatorcontrib><title>Cable dragging type oil-water well layered continuous testing system and implementation method</title><description>The invention provides a cable dragging type oil-water well layered continuous testing system and an implementation method. The method comprises the following steps that 1, a transition rod is selected; 2, all parts of the oil-water well layered continuous testing system are installed through electric connection and mechanical connection; 3, the oil-water well layered continuous testing system is put into a well through a cable, and a well depth measuring unit feeds back the depth of the oil-water well layered continuous testing system to a ground pressure measuring instrument in real time; 4, after the specified depth is reached, an upper setting rubber sleeve and a lower setting rubber sleeve form sealing, and meanwhile an anchoring mechanism is used for anchoring; 5, a monitoring unit is activated by the ground pressure measuring instrument, and single-layer-section testing is carried out on underground indexes; and 6, after the single-layer-section testing is completed, the system can be moved to a next t</description><subject>EARTH DRILLING</subject><subject>EARTH DRILLING, e.g. DEEP DRILLING</subject><subject>FIXED CONSTRUCTIONS</subject><subject>MINING</subject><subject>OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2021</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNyjEKwkAQBdA0FqLeYTxAihgkWEpQrKyslTH7jQuzs0t2QsjtRfAAVq95y-Le8lNAbuC-99qTzQkUvZQTGwaaIELCMwY46qKa1zGOmQzZvj3P2RCI1ZEPSRCgxuajUoC9o1sXixdLxubnqtieT7f2UiLFB3LiDgp7tNeqqpvqsGv2x_qf8wGApD1L</recordid><startdate>20211130</startdate><enddate>20211130</enddate><creator>DAI HUI</creator><creator>SONG WENPING</creator><creator>QIAO JIANXIN</creator><creator>WANG JUNSONG</creator><creator>QIANG YAN</creator><creator>CUI MENG</creator><creator>YANG HUA</creator><creator>FAN DENAN</creator><creator>YANG CHENHUI</creator><creator>LI YEPENG</creator><creator>DONG LICHAO</creator><creator>ZHOU JIN</creator><creator>SHEN TIANDAN</creator><creator>CAO XIONGKE</creator><scope>EVB</scope></search><sort><creationdate>20211130</creationdate><title>Cable dragging type oil-water well layered continuous testing system and implementation method</title><author>DAI HUI ; SONG WENPING ; QIAO JIANXIN ; WANG JUNSONG ; QIANG YAN ; CUI MENG ; YANG HUA ; FAN DENAN ; YANG CHENHUI ; LI YEPENG ; DONG LICHAO ; ZHOU JIN ; SHEN TIANDAN ; CAO XIONGKE</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN113719275A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2021</creationdate><topic>EARTH DRILLING</topic><topic>EARTH DRILLING, e.g. DEEP DRILLING</topic><topic>FIXED CONSTRUCTIONS</topic><topic>MINING</topic><topic>OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS</topic><toplevel>online_resources</toplevel><creatorcontrib>DAI HUI</creatorcontrib><creatorcontrib>SONG WENPING</creatorcontrib><creatorcontrib>QIAO JIANXIN</creatorcontrib><creatorcontrib>WANG JUNSONG</creatorcontrib><creatorcontrib>QIANG YAN</creatorcontrib><creatorcontrib>CUI MENG</creatorcontrib><creatorcontrib>YANG HUA</creatorcontrib><creatorcontrib>FAN DENAN</creatorcontrib><creatorcontrib>YANG CHENHUI</creatorcontrib><creatorcontrib>LI YEPENG</creatorcontrib><creatorcontrib>DONG LICHAO</creatorcontrib><creatorcontrib>ZHOU JIN</creatorcontrib><creatorcontrib>SHEN TIANDAN</creatorcontrib><creatorcontrib>CAO XIONGKE</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>DAI HUI</au><au>SONG WENPING</au><au>QIAO JIANXIN</au><au>WANG JUNSONG</au><au>QIANG YAN</au><au>CUI MENG</au><au>YANG HUA</au><au>FAN DENAN</au><au>YANG CHENHUI</au><au>LI YEPENG</au><au>DONG LICHAO</au><au>ZHOU JIN</au><au>SHEN TIANDAN</au><au>CAO XIONGKE</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Cable dragging type oil-water well layered continuous testing system and implementation method</title><date>2021-11-30</date><risdate>2021</risdate><abstract>The invention provides a cable dragging type oil-water well layered continuous testing system and an implementation method. The method comprises the following steps that 1, a transition rod is selected; 2, all parts of the oil-water well layered continuous testing system are installed through electric connection and mechanical connection; 3, the oil-water well layered continuous testing system is put into a well through a cable, and a well depth measuring unit feeds back the depth of the oil-water well layered continuous testing system to a ground pressure measuring instrument in real time; 4, after the specified depth is reached, an upper setting rubber sleeve and a lower setting rubber sleeve form sealing, and meanwhile an anchoring mechanism is used for anchoring; 5, a monitoring unit is activated by the ground pressure measuring instrument, and single-layer-section testing is carried out on underground indexes; and 6, after the single-layer-section testing is completed, the system can be moved to a next t</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN113719275A
source esp@cenet
subjects EARTH DRILLING
EARTH DRILLING, e.g. DEEP DRILLING
FIXED CONSTRUCTIONS
MINING
OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS
title Cable dragging type oil-water well layered continuous testing system and implementation method
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-27T20%3A50%3A54IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=DAI%20HUI&rft.date=2021-11-30&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN113719275A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true