Cable dragging type oil-water well layered continuous testing system and implementation method
The invention provides a cable dragging type oil-water well layered continuous testing system and an implementation method. The method comprises the following steps that 1, a transition rod is selected; 2, all parts of the oil-water well layered continuous testing system are installed through electr...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | DAI HUI SONG WENPING QIAO JIANXIN WANG JUNSONG QIANG YAN CUI MENG YANG HUA FAN DENAN YANG CHENHUI LI YEPENG DONG LICHAO ZHOU JIN SHEN TIANDAN CAO XIONGKE |
description | The invention provides a cable dragging type oil-water well layered continuous testing system and an implementation method. The method comprises the following steps that 1, a transition rod is selected; 2, all parts of the oil-water well layered continuous testing system are installed through electric connection and mechanical connection; 3, the oil-water well layered continuous testing system is put into a well through a cable, and a well depth measuring unit feeds back the depth of the oil-water well layered continuous testing system to a ground pressure measuring instrument in real time; 4, after the specified depth is reached, an upper setting rubber sleeve and a lower setting rubber sleeve form sealing, and meanwhile an anchoring mechanism is used for anchoring; 5, a monitoring unit is activated by the ground pressure measuring instrument, and single-layer-section testing is carried out on underground indexes; and 6, after the single-layer-section testing is completed, the system can be moved to a next t |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN113719275A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN113719275A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN113719275A3</originalsourceid><addsrcrecordid>eNqNyjEKwkAQBdA0FqLeYTxAihgkWEpQrKyslTH7jQuzs0t2QsjtRfAAVq95y-Le8lNAbuC-99qTzQkUvZQTGwaaIELCMwY46qKa1zGOmQzZvj3P2RCI1ZEPSRCgxuajUoC9o1sXixdLxubnqtieT7f2UiLFB3LiDgp7tNeqqpvqsGv2x_qf8wGApD1L</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Cable dragging type oil-water well layered continuous testing system and implementation method</title><source>esp@cenet</source><creator>DAI HUI ; SONG WENPING ; QIAO JIANXIN ; WANG JUNSONG ; QIANG YAN ; CUI MENG ; YANG HUA ; FAN DENAN ; YANG CHENHUI ; LI YEPENG ; DONG LICHAO ; ZHOU JIN ; SHEN TIANDAN ; CAO XIONGKE</creator><creatorcontrib>DAI HUI ; SONG WENPING ; QIAO JIANXIN ; WANG JUNSONG ; QIANG YAN ; CUI MENG ; YANG HUA ; FAN DENAN ; YANG CHENHUI ; LI YEPENG ; DONG LICHAO ; ZHOU JIN ; SHEN TIANDAN ; CAO XIONGKE</creatorcontrib><description>The invention provides a cable dragging type oil-water well layered continuous testing system and an implementation method. The method comprises the following steps that 1, a transition rod is selected; 2, all parts of the oil-water well layered continuous testing system are installed through electric connection and mechanical connection; 3, the oil-water well layered continuous testing system is put into a well through a cable, and a well depth measuring unit feeds back the depth of the oil-water well layered continuous testing system to a ground pressure measuring instrument in real time; 4, after the specified depth is reached, an upper setting rubber sleeve and a lower setting rubber sleeve form sealing, and meanwhile an anchoring mechanism is used for anchoring; 5, a monitoring unit is activated by the ground pressure measuring instrument, and single-layer-section testing is carried out on underground indexes; and 6, after the single-layer-section testing is completed, the system can be moved to a next t</description><language>chi ; eng</language><subject>EARTH DRILLING ; EARTH DRILLING, e.g. DEEP DRILLING ; FIXED CONSTRUCTIONS ; MINING ; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS</subject><creationdate>2021</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20211130&DB=EPODOC&CC=CN&NR=113719275A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20211130&DB=EPODOC&CC=CN&NR=113719275A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>DAI HUI</creatorcontrib><creatorcontrib>SONG WENPING</creatorcontrib><creatorcontrib>QIAO JIANXIN</creatorcontrib><creatorcontrib>WANG JUNSONG</creatorcontrib><creatorcontrib>QIANG YAN</creatorcontrib><creatorcontrib>CUI MENG</creatorcontrib><creatorcontrib>YANG HUA</creatorcontrib><creatorcontrib>FAN DENAN</creatorcontrib><creatorcontrib>YANG CHENHUI</creatorcontrib><creatorcontrib>LI YEPENG</creatorcontrib><creatorcontrib>DONG LICHAO</creatorcontrib><creatorcontrib>ZHOU JIN</creatorcontrib><creatorcontrib>SHEN TIANDAN</creatorcontrib><creatorcontrib>CAO XIONGKE</creatorcontrib><title>Cable dragging type oil-water well layered continuous testing system and implementation method</title><description>The invention provides a cable dragging type oil-water well layered continuous testing system and an implementation method. The method comprises the following steps that 1, a transition rod is selected; 2, all parts of the oil-water well layered continuous testing system are installed through electric connection and mechanical connection; 3, the oil-water well layered continuous testing system is put into a well through a cable, and a well depth measuring unit feeds back the depth of the oil-water well layered continuous testing system to a ground pressure measuring instrument in real time; 4, after the specified depth is reached, an upper setting rubber sleeve and a lower setting rubber sleeve form sealing, and meanwhile an anchoring mechanism is used for anchoring; 5, a monitoring unit is activated by the ground pressure measuring instrument, and single-layer-section testing is carried out on underground indexes; and 6, after the single-layer-section testing is completed, the system can be moved to a next t</description><subject>EARTH DRILLING</subject><subject>EARTH DRILLING, e.g. DEEP DRILLING</subject><subject>FIXED CONSTRUCTIONS</subject><subject>MINING</subject><subject>OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2021</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNyjEKwkAQBdA0FqLeYTxAihgkWEpQrKyslTH7jQuzs0t2QsjtRfAAVq95y-Le8lNAbuC-99qTzQkUvZQTGwaaIELCMwY46qKa1zGOmQzZvj3P2RCI1ZEPSRCgxuajUoC9o1sXixdLxubnqtieT7f2UiLFB3LiDgp7tNeqqpvqsGv2x_qf8wGApD1L</recordid><startdate>20211130</startdate><enddate>20211130</enddate><creator>DAI HUI</creator><creator>SONG WENPING</creator><creator>QIAO JIANXIN</creator><creator>WANG JUNSONG</creator><creator>QIANG YAN</creator><creator>CUI MENG</creator><creator>YANG HUA</creator><creator>FAN DENAN</creator><creator>YANG CHENHUI</creator><creator>LI YEPENG</creator><creator>DONG LICHAO</creator><creator>ZHOU JIN</creator><creator>SHEN TIANDAN</creator><creator>CAO XIONGKE</creator><scope>EVB</scope></search><sort><creationdate>20211130</creationdate><title>Cable dragging type oil-water well layered continuous testing system and implementation method</title><author>DAI HUI ; SONG WENPING ; QIAO JIANXIN ; WANG JUNSONG ; QIANG YAN ; CUI MENG ; YANG HUA ; FAN DENAN ; YANG CHENHUI ; LI YEPENG ; DONG LICHAO ; ZHOU JIN ; SHEN TIANDAN ; CAO XIONGKE</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN113719275A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2021</creationdate><topic>EARTH DRILLING</topic><topic>EARTH DRILLING, e.g. DEEP DRILLING</topic><topic>FIXED CONSTRUCTIONS</topic><topic>MINING</topic><topic>OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS</topic><toplevel>online_resources</toplevel><creatorcontrib>DAI HUI</creatorcontrib><creatorcontrib>SONG WENPING</creatorcontrib><creatorcontrib>QIAO JIANXIN</creatorcontrib><creatorcontrib>WANG JUNSONG</creatorcontrib><creatorcontrib>QIANG YAN</creatorcontrib><creatorcontrib>CUI MENG</creatorcontrib><creatorcontrib>YANG HUA</creatorcontrib><creatorcontrib>FAN DENAN</creatorcontrib><creatorcontrib>YANG CHENHUI</creatorcontrib><creatorcontrib>LI YEPENG</creatorcontrib><creatorcontrib>DONG LICHAO</creatorcontrib><creatorcontrib>ZHOU JIN</creatorcontrib><creatorcontrib>SHEN TIANDAN</creatorcontrib><creatorcontrib>CAO XIONGKE</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>DAI HUI</au><au>SONG WENPING</au><au>QIAO JIANXIN</au><au>WANG JUNSONG</au><au>QIANG YAN</au><au>CUI MENG</au><au>YANG HUA</au><au>FAN DENAN</au><au>YANG CHENHUI</au><au>LI YEPENG</au><au>DONG LICHAO</au><au>ZHOU JIN</au><au>SHEN TIANDAN</au><au>CAO XIONGKE</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Cable dragging type oil-water well layered continuous testing system and implementation method</title><date>2021-11-30</date><risdate>2021</risdate><abstract>The invention provides a cable dragging type oil-water well layered continuous testing system and an implementation method. The method comprises the following steps that 1, a transition rod is selected; 2, all parts of the oil-water well layered continuous testing system are installed through electric connection and mechanical connection; 3, the oil-water well layered continuous testing system is put into a well through a cable, and a well depth measuring unit feeds back the depth of the oil-water well layered continuous testing system to a ground pressure measuring instrument in real time; 4, after the specified depth is reached, an upper setting rubber sleeve and a lower setting rubber sleeve form sealing, and meanwhile an anchoring mechanism is used for anchoring; 5, a monitoring unit is activated by the ground pressure measuring instrument, and single-layer-section testing is carried out on underground indexes; and 6, after the single-layer-section testing is completed, the system can be moved to a next t</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN113719275A |
source | esp@cenet |
subjects | EARTH DRILLING EARTH DRILLING, e.g. DEEP DRILLING FIXED CONSTRUCTIONS MINING OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS |
title | Cable dragging type oil-water well layered continuous testing system and implementation method |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-27T20%3A50%3A54IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=DAI%20HUI&rft.date=2021-11-30&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN113719275A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |