Installation device for locking sleeve of high-speed coupling of wind power generator

An installation device for a locking sleeve of a high-speed coupling of a wind power generator comprises a base platform and the locking sleeve for locking the high-speed coupling. Two linear guide rails which are arranged in parallel are installed on the base platform, and a shape-following support...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: BU KANGTAO, DOU YUXIANG, HE MING, BIAN LUNWEI, YANG SIBING, WU JING, TAO SHENGJIN
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator BU KANGTAO
DOU YUXIANG
HE MING
BIAN LUNWEI
YANG SIBING
WU JING
TAO SHENGJIN
description An installation device for a locking sleeve of a high-speed coupling of a wind power generator comprises a base platform and the locking sleeve for locking the high-speed coupling. Two linear guide rails which are arranged in parallel are installed on the base platform, and a shape-following support matched with the locking sleeve is arranged above the linear guide rails. A bearing plate is arranged between the shape-following support and the linear guide rails and is installed on the two linear guide rails through a plurality of sliding blocks, a plurality of lifting motors capable of adjusting the height of the locking sleeve are installed between the bearing plate and the shape-following support, and a thrust oil cylinder for driving the bearing plate to move along the linear guide rails is arranged between the bearing plate and the base platform. An electromagnetic heater for heating the interior of the locking sleeve is installed on the base platform through a heater fixing supporting frame. The installa
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN113634987A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN113634987A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN113634987A3</originalsourceid><addsrcrecordid>eNqNirEKwjAYBrM4iPoOvw_QoUTUjlIUXZx0LiH50gZD_pDE9vWt4AM4HdzdUjxvIRflvSqOAxmMToMsJ_KsXy70lD0wgtjS4PqhyhEwpPkd_bfOenLBUOQJiXoEJFU4rcXCKp-x-XEltpfzo71WiNwhR6Xns3Ttva7lXu6a4-Ek_3k-5tQ5Uw</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Installation device for locking sleeve of high-speed coupling of wind power generator</title><source>esp@cenet</source><creator>BU KANGTAO ; DOU YUXIANG ; HE MING ; BIAN LUNWEI ; YANG SIBING ; WU JING ; TAO SHENGJIN</creator><creatorcontrib>BU KANGTAO ; DOU YUXIANG ; HE MING ; BIAN LUNWEI ; YANG SIBING ; WU JING ; TAO SHENGJIN</creatorcontrib><description>An installation device for a locking sleeve of a high-speed coupling of a wind power generator comprises a base platform and the locking sleeve for locking the high-speed coupling. Two linear guide rails which are arranged in parallel are installed on the base platform, and a shape-following support matched with the locking sleeve is arranged above the linear guide rails. A bearing plate is arranged between the shape-following support and the linear guide rails and is installed on the two linear guide rails through a plurality of sliding blocks, a plurality of lifting motors capable of adjusting the height of the locking sleeve are installed between the bearing plate and the shape-following support, and a thrust oil cylinder for driving the bearing plate to move along the linear guide rails is arranged between the bearing plate and the base platform. An electromagnetic heater for heating the interior of the locking sleeve is installed on the base platform through a heater fixing supporting frame. The installa</description><language>chi ; eng</language><subject>COMBINED OPERATIONS ; MACHINE TOOLS ; METAL-WORKING NOT OTHERWISE PROVIDED FOR ; OTHER WORKING OF METAL ; PERFORMING OPERATIONS ; TRANSPORTING ; UNIVERSAL MACHINE TOOLS</subject><creationdate>2021</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20211112&amp;DB=EPODOC&amp;CC=CN&amp;NR=113634987A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76290</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20211112&amp;DB=EPODOC&amp;CC=CN&amp;NR=113634987A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>BU KANGTAO</creatorcontrib><creatorcontrib>DOU YUXIANG</creatorcontrib><creatorcontrib>HE MING</creatorcontrib><creatorcontrib>BIAN LUNWEI</creatorcontrib><creatorcontrib>YANG SIBING</creatorcontrib><creatorcontrib>WU JING</creatorcontrib><creatorcontrib>TAO SHENGJIN</creatorcontrib><title>Installation device for locking sleeve of high-speed coupling of wind power generator</title><description>An installation device for a locking sleeve of a high-speed coupling of a wind power generator comprises a base platform and the locking sleeve for locking the high-speed coupling. Two linear guide rails which are arranged in parallel are installed on the base platform, and a shape-following support matched with the locking sleeve is arranged above the linear guide rails. A bearing plate is arranged between the shape-following support and the linear guide rails and is installed on the two linear guide rails through a plurality of sliding blocks, a plurality of lifting motors capable of adjusting the height of the locking sleeve are installed between the bearing plate and the shape-following support, and a thrust oil cylinder for driving the bearing plate to move along the linear guide rails is arranged between the bearing plate and the base platform. An electromagnetic heater for heating the interior of the locking sleeve is installed on the base platform through a heater fixing supporting frame. The installa</description><subject>COMBINED OPERATIONS</subject><subject>MACHINE TOOLS</subject><subject>METAL-WORKING NOT OTHERWISE PROVIDED FOR</subject><subject>OTHER WORKING OF METAL</subject><subject>PERFORMING OPERATIONS</subject><subject>TRANSPORTING</subject><subject>UNIVERSAL MACHINE TOOLS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2021</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNirEKwjAYBrM4iPoOvw_QoUTUjlIUXZx0LiH50gZD_pDE9vWt4AM4HdzdUjxvIRflvSqOAxmMToMsJ_KsXy70lD0wgtjS4PqhyhEwpPkd_bfOenLBUOQJiXoEJFU4rcXCKp-x-XEltpfzo71WiNwhR6Xns3Ttva7lXu6a4-Ek_3k-5tQ5Uw</recordid><startdate>20211112</startdate><enddate>20211112</enddate><creator>BU KANGTAO</creator><creator>DOU YUXIANG</creator><creator>HE MING</creator><creator>BIAN LUNWEI</creator><creator>YANG SIBING</creator><creator>WU JING</creator><creator>TAO SHENGJIN</creator><scope>EVB</scope></search><sort><creationdate>20211112</creationdate><title>Installation device for locking sleeve of high-speed coupling of wind power generator</title><author>BU KANGTAO ; DOU YUXIANG ; HE MING ; BIAN LUNWEI ; YANG SIBING ; WU JING ; TAO SHENGJIN</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN113634987A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2021</creationdate><topic>COMBINED OPERATIONS</topic><topic>MACHINE TOOLS</topic><topic>METAL-WORKING NOT OTHERWISE PROVIDED FOR</topic><topic>OTHER WORKING OF METAL</topic><topic>PERFORMING OPERATIONS</topic><topic>TRANSPORTING</topic><topic>UNIVERSAL MACHINE TOOLS</topic><toplevel>online_resources</toplevel><creatorcontrib>BU KANGTAO</creatorcontrib><creatorcontrib>DOU YUXIANG</creatorcontrib><creatorcontrib>HE MING</creatorcontrib><creatorcontrib>BIAN LUNWEI</creatorcontrib><creatorcontrib>YANG SIBING</creatorcontrib><creatorcontrib>WU JING</creatorcontrib><creatorcontrib>TAO SHENGJIN</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>BU KANGTAO</au><au>DOU YUXIANG</au><au>HE MING</au><au>BIAN LUNWEI</au><au>YANG SIBING</au><au>WU JING</au><au>TAO SHENGJIN</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Installation device for locking sleeve of high-speed coupling of wind power generator</title><date>2021-11-12</date><risdate>2021</risdate><abstract>An installation device for a locking sleeve of a high-speed coupling of a wind power generator comprises a base platform and the locking sleeve for locking the high-speed coupling. Two linear guide rails which are arranged in parallel are installed on the base platform, and a shape-following support matched with the locking sleeve is arranged above the linear guide rails. A bearing plate is arranged between the shape-following support and the linear guide rails and is installed on the two linear guide rails through a plurality of sliding blocks, a plurality of lifting motors capable of adjusting the height of the locking sleeve are installed between the bearing plate and the shape-following support, and a thrust oil cylinder for driving the bearing plate to move along the linear guide rails is arranged between the bearing plate and the base platform. An electromagnetic heater for heating the interior of the locking sleeve is installed on the base platform through a heater fixing supporting frame. The installa</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN113634987A
source esp@cenet
subjects COMBINED OPERATIONS
MACHINE TOOLS
METAL-WORKING NOT OTHERWISE PROVIDED FOR
OTHER WORKING OF METAL
PERFORMING OPERATIONS
TRANSPORTING
UNIVERSAL MACHINE TOOLS
title Installation device for locking sleeve of high-speed coupling of wind power generator
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-02T08%3A17%3A41IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=BU%20KANGTAO&rft.date=2021-11-12&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN113634987A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true