Method for achieving synchronous pushing of large-span steel-concrete composite beams through cable-stayed tower

The invention discloses a method for achieving synchronous pushing of large-span steel-concrete composite beams through a cable-stayed tower. The method comprises the steps that: the tower is mounted on a steel box beam, a hinged support is arranged at the bottom of the tower, and the tower is conne...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: TANG JUN, WEI GAN, XIAO YANJUN, ZHANG HAO, LIU XIANGYANG, XU XIAOYOU, QIN JING, DENG HAIHONG, TANG BICONG, PANG WEI, WANG JUANQIANG, CHEN JUNKUN, ZHOU JINGYU, DING MINGHAI, HE PENG, XIANG JIN
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The invention discloses a method for achieving synchronous pushing of large-span steel-concrete composite beams through a cable-stayed tower. The method comprises the steps that: the tower is mounted on a steel box beam, a hinged support is arranged at the bottom of the tower, and the tower is connected with the top of the steel box beam through the hinged support; and a pushing device is used for pushing a guide beam and the steel box beam to a middle pier and a guide beam receiving platform successively from a splicing area, and in the pushing process, under the action of the hinged support, the tower can incline by a small angle. The hinged support is arranged at the bottom of the tower so that the tower can incline, the constraint of rotation in a bridge direction can be released, and the tower and the steel box beam can rotate freely; in the pushing process, when the hogging moment of a pushing cantilever is increased or the guide beam is mounted onto the piers, the change of the horizontal force of the