Composite foundation of deep and thick garbage miscellaneous fill and construction process and equipment thereof
The invention discloses a composite foundation of deep and thick garbage miscellaneous fill and a construction process and equipment thereof. The construction process comprises the following steps of: positioning and paying off a measured construction area; determining a plurality of pile sites acco...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | YANG ZHANMENG LIU MINGHUA BAI JIARONG WU CHUANFENG YANG GUANGCHANG ZHANG CHANGLIN QIU LIFA LIU YANG HUANG MINGLI MENG QINGLONG |
description | The invention discloses a composite foundation of deep and thick garbage miscellaneous fill and a construction process and equipment thereof. The construction process comprises the following steps of: positioning and paying off a measured construction area; determining a plurality of pile sites according to each axis obtained by positioning and paying off; hammering and forming holes at a first part of pile sites in the plurality of pile sites to obtain a plurality of column hammer punched holes; punching sleeves to a preset depth by using column hammers in the plurality of column hammer punched holes; filling the sleeves to form column hammer punching and expanding piles; drilling and forming holes at a second part of pile sites in the plurality of pile sites to obtain a plurality of drilled holes; pouring concrete into the plurality of drilled holes to form CFG piles; and finally, laying mattress layers on the column hammer punching and expanding piles and the CFG piles. The column hammer punching and expan |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN113266003A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN113266003A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN113266003A3</originalsourceid><addsrcrecordid>eNqNjDEOwjAQBNNQIOAPxwOQEiKlRxGIioo-Opx1sHB8xmf_HxTxAKopdnbWVexljqIug6yUMHJ2EkgsjUAkDiPlpzMvmjg9eALNTg285wApStZ5v0hGguZUzPKOSQxUlwHv4uKMkL8dJIjdVivLXrH7cVPtL-d7fz0gygCNbBCQh_7WNO2x6-q6PbX_OB-cZ0Pf</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Composite foundation of deep and thick garbage miscellaneous fill and construction process and equipment thereof</title><source>esp@cenet</source><creator>YANG ZHANMENG ; LIU MINGHUA ; BAI JIARONG ; WU CHUANFENG ; YANG GUANGCHANG ; ZHANG CHANGLIN ; QIU LIFA ; LIU YANG ; HUANG MINGLI ; MENG QINGLONG</creator><creatorcontrib>YANG ZHANMENG ; LIU MINGHUA ; BAI JIARONG ; WU CHUANFENG ; YANG GUANGCHANG ; ZHANG CHANGLIN ; QIU LIFA ; LIU YANG ; HUANG MINGLI ; MENG QINGLONG</creatorcontrib><description>The invention discloses a composite foundation of deep and thick garbage miscellaneous fill and a construction process and equipment thereof. The construction process comprises the following steps of: positioning and paying off a measured construction area; determining a plurality of pile sites according to each axis obtained by positioning and paying off; hammering and forming holes at a first part of pile sites in the plurality of pile sites to obtain a plurality of column hammer punched holes; punching sleeves to a preset depth by using column hammers in the plurality of column hammer punched holes; filling the sleeves to form column hammer punching and expanding piles; drilling and forming holes at a second part of pile sites in the plurality of pile sites to obtain a plurality of drilled holes; pouring concrete into the plurality of drilled holes to form CFG piles; and finally, laying mattress layers on the column hammer punching and expanding piles and the CFG piles. The column hammer punching and expan</description><language>chi ; eng</language><subject>EARTH DRILLING ; EARTH DRILLING, e.g. DEEP DRILLING ; EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; MINING ; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS ; SOIL SHIFTING ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>2021</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20210817&DB=EPODOC&CC=CN&NR=113266003A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,309,781,886,25569,76552</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20210817&DB=EPODOC&CC=CN&NR=113266003A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>YANG ZHANMENG</creatorcontrib><creatorcontrib>LIU MINGHUA</creatorcontrib><creatorcontrib>BAI JIARONG</creatorcontrib><creatorcontrib>WU CHUANFENG</creatorcontrib><creatorcontrib>YANG GUANGCHANG</creatorcontrib><creatorcontrib>ZHANG CHANGLIN</creatorcontrib><creatorcontrib>QIU LIFA</creatorcontrib><creatorcontrib>LIU YANG</creatorcontrib><creatorcontrib>HUANG MINGLI</creatorcontrib><creatorcontrib>MENG QINGLONG</creatorcontrib><title>Composite foundation of deep and thick garbage miscellaneous fill and construction process and equipment thereof</title><description>The invention discloses a composite foundation of deep and thick garbage miscellaneous fill and a construction process and equipment thereof. The construction process comprises the following steps of: positioning and paying off a measured construction area; determining a plurality of pile sites according to each axis obtained by positioning and paying off; hammering and forming holes at a first part of pile sites in the plurality of pile sites to obtain a plurality of column hammer punched holes; punching sleeves to a preset depth by using column hammers in the plurality of column hammer punched holes; filling the sleeves to form column hammer punching and expanding piles; drilling and forming holes at a second part of pile sites in the plurality of pile sites to obtain a plurality of drilled holes; pouring concrete into the plurality of drilled holes to form CFG piles; and finally, laying mattress layers on the column hammer punching and expanding piles and the CFG piles. The column hammer punching and expan</description><subject>EARTH DRILLING</subject><subject>EARTH DRILLING, e.g. DEEP DRILLING</subject><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>MINING</subject><subject>OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS</subject><subject>SOIL SHIFTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2021</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNjDEOwjAQBNNQIOAPxwOQEiKlRxGIioo-Opx1sHB8xmf_HxTxAKopdnbWVexljqIug6yUMHJ2EkgsjUAkDiPlpzMvmjg9eALNTg285wApStZ5v0hGguZUzPKOSQxUlwHv4uKMkL8dJIjdVivLXrH7cVPtL-d7fz0gygCNbBCQh_7WNO2x6-q6PbX_OB-cZ0Pf</recordid><startdate>20210817</startdate><enddate>20210817</enddate><creator>YANG ZHANMENG</creator><creator>LIU MINGHUA</creator><creator>BAI JIARONG</creator><creator>WU CHUANFENG</creator><creator>YANG GUANGCHANG</creator><creator>ZHANG CHANGLIN</creator><creator>QIU LIFA</creator><creator>LIU YANG</creator><creator>HUANG MINGLI</creator><creator>MENG QINGLONG</creator><scope>EVB</scope></search><sort><creationdate>20210817</creationdate><title>Composite foundation of deep and thick garbage miscellaneous fill and construction process and equipment thereof</title><author>YANG ZHANMENG ; LIU MINGHUA ; BAI JIARONG ; WU CHUANFENG ; YANG GUANGCHANG ; ZHANG CHANGLIN ; QIU LIFA ; LIU YANG ; HUANG MINGLI ; MENG QINGLONG</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN113266003A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2021</creationdate><topic>EARTH DRILLING</topic><topic>EARTH DRILLING, e.g. DEEP DRILLING</topic><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>MINING</topic><topic>OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS</topic><topic>SOIL SHIFTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>YANG ZHANMENG</creatorcontrib><creatorcontrib>LIU MINGHUA</creatorcontrib><creatorcontrib>BAI JIARONG</creatorcontrib><creatorcontrib>WU CHUANFENG</creatorcontrib><creatorcontrib>YANG GUANGCHANG</creatorcontrib><creatorcontrib>ZHANG CHANGLIN</creatorcontrib><creatorcontrib>QIU LIFA</creatorcontrib><creatorcontrib>LIU YANG</creatorcontrib><creatorcontrib>HUANG MINGLI</creatorcontrib><creatorcontrib>MENG QINGLONG</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>YANG ZHANMENG</au><au>LIU MINGHUA</au><au>BAI JIARONG</au><au>WU CHUANFENG</au><au>YANG GUANGCHANG</au><au>ZHANG CHANGLIN</au><au>QIU LIFA</au><au>LIU YANG</au><au>HUANG MINGLI</au><au>MENG QINGLONG</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Composite foundation of deep and thick garbage miscellaneous fill and construction process and equipment thereof</title><date>2021-08-17</date><risdate>2021</risdate><abstract>The invention discloses a composite foundation of deep and thick garbage miscellaneous fill and a construction process and equipment thereof. The construction process comprises the following steps of: positioning and paying off a measured construction area; determining a plurality of pile sites according to each axis obtained by positioning and paying off; hammering and forming holes at a first part of pile sites in the plurality of pile sites to obtain a plurality of column hammer punched holes; punching sleeves to a preset depth by using column hammers in the plurality of column hammer punched holes; filling the sleeves to form column hammer punching and expanding piles; drilling and forming holes at a second part of pile sites in the plurality of pile sites to obtain a plurality of drilled holes; pouring concrete into the plurality of drilled holes to form CFG piles; and finally, laying mattress layers on the column hammer punching and expanding piles and the CFG piles. The column hammer punching and expan</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN113266003A |
source | esp@cenet |
subjects | EARTH DRILLING EARTH DRILLING, e.g. DEEP DRILLING EMBANKMENTS EXCAVATIONS FIXED CONSTRUCTIONS FOUNDATIONS HYDRAULIC ENGINEERING MINING OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS SOIL SHIFTING UNDERGROUND OR UNDERWATER STRUCTURES |
title | Composite foundation of deep and thick garbage miscellaneous fill and construction process and equipment thereof |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-15T23%3A29%3A11IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=YANG%20ZHANMENG&rft.date=2021-08-17&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN113266003A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |