PROCESS FOR MANUFACTURING A LAMINATE OF STACKED METAL PARTS INCLUDING A MULTI-LAYER BLANKING PROCESS STEP

The invention relates to a process for manufacturing a laminate (17) from a number of sets (16; 16-1, 16-2, 16-s) of metal parts including a multi-layer blanking process step for cutting these sets (16; 16-1, 16-2, 16-s) from a layered basic material, whereof the constituent layers are interlocked b...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: JANSSEN THEODORUS MARTINUS HENRICUS, BRANDSMA ARJEN
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator JANSSEN THEODORUS MARTINUS HENRICUS
BRANDSMA ARJEN
description The invention relates to a process for manufacturing a laminate (17) from a number of sets (16; 16-1, 16-2, 16-s) of metal parts including a multi-layer blanking process step for cutting these sets (16; 16-1, 16-2, 16-s) from a layered basic material, whereof the constituent layers are interlocked by the local plastic deformation thereof inside the contour of the metal parts to be cut and whereby a bulge (4) is formed on the layered basic material and on the metal parts that are cut therefrom. According to the invention, in the multi-layer blanking process step, the sets (16; 16-1, 16- 2, 16-s) of metal parts are each provided with a hole (15) for receiving the bulge (4) of an adjacent set (16; 16-1, 16-2, 16-s) of metal parts in the laminate (17). 本发明涉及一种用于从多组(16;16-1、16-2、16-s)金属部件制造叠层(17)的方法,包括用于从层叠基材切割这些组(16;16-1、16-2、16-s)的多层冲裁工艺步骤,组成层通过其在待切割金属部件的轮廓内的局部塑性变形而互锁,并由此在层叠基材和从其切割的金属部件上形成隆起(4)。根据本发明,在多层冲裁工艺步骤中,金属部件的组(16;16-1、16-2、16-s)分别设置有用于接收叠层(17)中金属部件的相邻组(16;16-1、16-2、16-s)的隆起(4)的孔(15)。
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN113226586A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN113226586A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN113226586A3</originalsourceid><addsrcrecordid>eNqNjMsKwjAQAHvxIOo_rB_QQ1ssXtd0o6F5lGRz6KkUiSCIFur_I6LePQ0Mwyyza-edoBBAOg8GbZQoOHplj4Cg0SiLTOAkBEbRUgOGGDV06DmAskLH5tOaqFnlGnvycNBo27f-zQNTt84Wl_E2p82Xq2wricUpT9NjSPM0ntM9PQdhi6Iqy3q3r7H6p3kBQJY1vw</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>PROCESS FOR MANUFACTURING A LAMINATE OF STACKED METAL PARTS INCLUDING A MULTI-LAYER BLANKING PROCESS STEP</title><source>esp@cenet</source><creator>JANSSEN THEODORUS MARTINUS HENRICUS ; BRANDSMA ARJEN</creator><creatorcontrib>JANSSEN THEODORUS MARTINUS HENRICUS ; BRANDSMA ARJEN</creatorcontrib><description>The invention relates to a process for manufacturing a laminate (17) from a number of sets (16; 16-1, 16-2, 16-s) of metal parts including a multi-layer blanking process step for cutting these sets (16; 16-1, 16-2, 16-s) from a layered basic material, whereof the constituent layers are interlocked by the local plastic deformation thereof inside the contour of the metal parts to be cut and whereby a bulge (4) is formed on the layered basic material and on the metal parts that are cut therefrom. According to the invention, in the multi-layer blanking process step, the sets (16; 16-1, 16- 2, 16-s) of metal parts are each provided with a hole (15) for receiving the bulge (4) of an adjacent set (16; 16-1, 16-2, 16-s) of metal parts in the laminate (17). 本发明涉及一种用于从多组(16;16-1、16-2、16-s)金属部件制造叠层(17)的方法,包括用于从层叠基材切割这些组(16;16-1、16-2、16-s)的多层冲裁工艺步骤,组成层通过其在待切割金属部件的轮廓内的局部塑性变形而互锁,并由此在层叠基材和从其切割的金属部件上形成隆起(4)。根据本发明,在多层冲裁工艺步骤中,金属部件的组(16;16-1、16-2、16-s)分别设置有用于接收叠层(17)中金属部件的相邻组(16;16-1、16-2、16-s)的隆起(4)的孔(15)。</description><language>chi ; eng</language><subject>CONVERSION OR DISTRIBUTION OF ELECTRIC POWER ; DYNAMO-ELECTRIC MACHINES ; ELECTRICITY ; GENERATION ; MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVINGMATERIAL ; PERFORMING OPERATIONS ; PUNCHING METAL ; TRANSPORTING ; WORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS ORPROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL</subject><creationdate>2021</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20210806&amp;DB=EPODOC&amp;CC=CN&amp;NR=113226586A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25543,76293</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20210806&amp;DB=EPODOC&amp;CC=CN&amp;NR=113226586A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>JANSSEN THEODORUS MARTINUS HENRICUS</creatorcontrib><creatorcontrib>BRANDSMA ARJEN</creatorcontrib><title>PROCESS FOR MANUFACTURING A LAMINATE OF STACKED METAL PARTS INCLUDING A MULTI-LAYER BLANKING PROCESS STEP</title><description>The invention relates to a process for manufacturing a laminate (17) from a number of sets (16; 16-1, 16-2, 16-s) of metal parts including a multi-layer blanking process step for cutting these sets (16; 16-1, 16-2, 16-s) from a layered basic material, whereof the constituent layers are interlocked by the local plastic deformation thereof inside the contour of the metal parts to be cut and whereby a bulge (4) is formed on the layered basic material and on the metal parts that are cut therefrom. According to the invention, in the multi-layer blanking process step, the sets (16; 16-1, 16- 2, 16-s) of metal parts are each provided with a hole (15) for receiving the bulge (4) of an adjacent set (16; 16-1, 16-2, 16-s) of metal parts in the laminate (17). 本发明涉及一种用于从多组(16;16-1、16-2、16-s)金属部件制造叠层(17)的方法,包括用于从层叠基材切割这些组(16;16-1、16-2、16-s)的多层冲裁工艺步骤,组成层通过其在待切割金属部件的轮廓内的局部塑性变形而互锁,并由此在层叠基材和从其切割的金属部件上形成隆起(4)。根据本发明,在多层冲裁工艺步骤中,金属部件的组(16;16-1、16-2、16-s)分别设置有用于接收叠层(17)中金属部件的相邻组(16;16-1、16-2、16-s)的隆起(4)的孔(15)。</description><subject>CONVERSION OR DISTRIBUTION OF ELECTRIC POWER</subject><subject>DYNAMO-ELECTRIC MACHINES</subject><subject>ELECTRICITY</subject><subject>GENERATION</subject><subject>MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVINGMATERIAL</subject><subject>PERFORMING OPERATIONS</subject><subject>PUNCHING METAL</subject><subject>TRANSPORTING</subject><subject>WORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS ORPROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2021</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNjMsKwjAQAHvxIOo_rB_QQ1ssXtd0o6F5lGRz6KkUiSCIFur_I6LePQ0Mwyyza-edoBBAOg8GbZQoOHplj4Cg0SiLTOAkBEbRUgOGGDV06DmAskLH5tOaqFnlGnvycNBo27f-zQNTt84Wl_E2p82Xq2wricUpT9NjSPM0ntM9PQdhi6Iqy3q3r7H6p3kBQJY1vw</recordid><startdate>20210806</startdate><enddate>20210806</enddate><creator>JANSSEN THEODORUS MARTINUS HENRICUS</creator><creator>BRANDSMA ARJEN</creator><scope>EVB</scope></search><sort><creationdate>20210806</creationdate><title>PROCESS FOR MANUFACTURING A LAMINATE OF STACKED METAL PARTS INCLUDING A MULTI-LAYER BLANKING PROCESS STEP</title><author>JANSSEN THEODORUS MARTINUS HENRICUS ; BRANDSMA ARJEN</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN113226586A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2021</creationdate><topic>CONVERSION OR DISTRIBUTION OF ELECTRIC POWER</topic><topic>DYNAMO-ELECTRIC MACHINES</topic><topic>ELECTRICITY</topic><topic>GENERATION</topic><topic>MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVINGMATERIAL</topic><topic>PERFORMING OPERATIONS</topic><topic>PUNCHING METAL</topic><topic>TRANSPORTING</topic><topic>WORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS ORPROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL</topic><toplevel>online_resources</toplevel><creatorcontrib>JANSSEN THEODORUS MARTINUS HENRICUS</creatorcontrib><creatorcontrib>BRANDSMA ARJEN</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>JANSSEN THEODORUS MARTINUS HENRICUS</au><au>BRANDSMA ARJEN</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>PROCESS FOR MANUFACTURING A LAMINATE OF STACKED METAL PARTS INCLUDING A MULTI-LAYER BLANKING PROCESS STEP</title><date>2021-08-06</date><risdate>2021</risdate><abstract>The invention relates to a process for manufacturing a laminate (17) from a number of sets (16; 16-1, 16-2, 16-s) of metal parts including a multi-layer blanking process step for cutting these sets (16; 16-1, 16-2, 16-s) from a layered basic material, whereof the constituent layers are interlocked by the local plastic deformation thereof inside the contour of the metal parts to be cut and whereby a bulge (4) is formed on the layered basic material and on the metal parts that are cut therefrom. According to the invention, in the multi-layer blanking process step, the sets (16; 16-1, 16- 2, 16-s) of metal parts are each provided with a hole (15) for receiving the bulge (4) of an adjacent set (16; 16-1, 16-2, 16-s) of metal parts in the laminate (17). 本发明涉及一种用于从多组(16;16-1、16-2、16-s)金属部件制造叠层(17)的方法,包括用于从层叠基材切割这些组(16;16-1、16-2、16-s)的多层冲裁工艺步骤,组成层通过其在待切割金属部件的轮廓内的局部塑性变形而互锁,并由此在层叠基材和从其切割的金属部件上形成隆起(4)。根据本发明,在多层冲裁工艺步骤中,金属部件的组(16;16-1、16-2、16-s)分别设置有用于接收叠层(17)中金属部件的相邻组(16;16-1、16-2、16-s)的隆起(4)的孔(15)。</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN113226586A
source esp@cenet
subjects CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
DYNAMO-ELECTRIC MACHINES
ELECTRICITY
GENERATION
MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVINGMATERIAL
PERFORMING OPERATIONS
PUNCHING METAL
TRANSPORTING
WORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS ORPROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL
title PROCESS FOR MANUFACTURING A LAMINATE OF STACKED METAL PARTS INCLUDING A MULTI-LAYER BLANKING PROCESS STEP
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-25T16%3A43%3A19IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=JANSSEN%20THEODORUS%20MARTINUS%20HENRICUS&rft.date=2021-08-06&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN113226586A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true