Over-limit treatment grinding method for rail cant of short sleeper of metro operation line
The invention relates to the technical field of rail engineering and particularly relates to a metro operation line short sleeper rail cant over-limit treatment grinding method. The method comprises the following steps that S1, overrun measurement is conducted on short sleepers, and the short sleepe...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | WU JUN WANG LICHUAN ZHANG LIUYONG JIA CHUNLEI HUO JIANHUA WANG BAOFENG ZHU WANRONG XIA XUFENG FAN BAOMING XU MINGFA HAN MEI LAI LELE WU FENG YANG JIAN |
description | The invention relates to the technical field of rail engineering and particularly relates to a metro operation line short sleeper rail cant over-limit treatment grinding method. The method comprises the following steps that S1, overrun measurement is conducted on short sleepers, and the short sleepers with the overrun range of 0-5mm as short sleepers are made to be ground; S2, for the to-be-polished short sleeper, after a fastener is detached and a steel rail is lifted, a polishing support is installed and polishing is conducted; and S3, after polishing is completed, the steel rail is fixed again. Compared with the prior art, the method is advantaged in that the process is simple, the work amount of work is relatively small, and work efficiency can be improved; the original ballast bed structure is not damaged, and the original ballast bed stability is kept; external influence is small, an interval power supply meets construction conditions, and noise is low; the inclination of part of the supporting blocks i |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN113215879A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN113215879A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN113215879A3</originalsourceid><addsrcrecordid>eNqNijEKwkAQRdNYiHqH8QAp1iBqKUGx0sbOIizJTzKw2VlmB89vBA9g9fjvv2XxeryhZeCJjUzhbUI0GpRjx3GgCTZKR70oqedArZ9f6SmPokY5AAn6FXOoQjIvbyyRAkesi0XvQ8bmx1WxvV6e9a1EkgY5-RYR1tR356qd2x8Pp3P1T_MBcfs7eg</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Over-limit treatment grinding method for rail cant of short sleeper of metro operation line</title><source>esp@cenet</source><creator>WU JUN ; WANG LICHUAN ; ZHANG LIUYONG ; JIA CHUNLEI ; HUO JIANHUA ; WANG BAOFENG ; ZHU WANRONG ; XIA XUFENG ; FAN BAOMING ; XU MINGFA ; HAN MEI ; LAI LELE ; WU FENG ; YANG JIAN</creator><creatorcontrib>WU JUN ; WANG LICHUAN ; ZHANG LIUYONG ; JIA CHUNLEI ; HUO JIANHUA ; WANG BAOFENG ; ZHU WANRONG ; XIA XUFENG ; FAN BAOMING ; XU MINGFA ; HAN MEI ; LAI LELE ; WU FENG ; YANG JIAN</creatorcontrib><description>The invention relates to the technical field of rail engineering and particularly relates to a metro operation line short sleeper rail cant over-limit treatment grinding method. The method comprises the following steps that S1, overrun measurement is conducted on short sleepers, and the short sleepers with the overrun range of 0-5mm as short sleepers are made to be ground; S2, for the to-be-polished short sleeper, after a fastener is detached and a steel rail is lifted, a polishing support is installed and polishing is conducted; and S3, after polishing is completed, the steel rail is fixed again. Compared with the prior art, the method is advantaged in that the process is simple, the work amount of work is relatively small, and work efficiency can be improved; the original ballast bed structure is not damaged, and the original ballast bed stability is kept; external influence is small, an interval power supply meets construction conditions, and noise is low; the inclination of part of the supporting blocks i</description><language>chi ; eng</language><subject>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES ; FIXED CONSTRUCTIONS ; MACHINES FOR MAKING RAILWAYS OF ALL KINDS ; PERMANENT WAY ; PERMANENT-WAY TOOLS</subject><creationdate>2021</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20210806&DB=EPODOC&CC=CN&NR=113215879A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20210806&DB=EPODOC&CC=CN&NR=113215879A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>WU JUN</creatorcontrib><creatorcontrib>WANG LICHUAN</creatorcontrib><creatorcontrib>ZHANG LIUYONG</creatorcontrib><creatorcontrib>JIA CHUNLEI</creatorcontrib><creatorcontrib>HUO JIANHUA</creatorcontrib><creatorcontrib>WANG BAOFENG</creatorcontrib><creatorcontrib>ZHU WANRONG</creatorcontrib><creatorcontrib>XIA XUFENG</creatorcontrib><creatorcontrib>FAN BAOMING</creatorcontrib><creatorcontrib>XU MINGFA</creatorcontrib><creatorcontrib>HAN MEI</creatorcontrib><creatorcontrib>LAI LELE</creatorcontrib><creatorcontrib>WU FENG</creatorcontrib><creatorcontrib>YANG JIAN</creatorcontrib><title>Over-limit treatment grinding method for rail cant of short sleeper of metro operation line</title><description>The invention relates to the technical field of rail engineering and particularly relates to a metro operation line short sleeper rail cant over-limit treatment grinding method. The method comprises the following steps that S1, overrun measurement is conducted on short sleepers, and the short sleepers with the overrun range of 0-5mm as short sleepers are made to be ground; S2, for the to-be-polished short sleeper, after a fastener is detached and a steel rail is lifted, a polishing support is installed and polishing is conducted; and S3, after polishing is completed, the steel rail is fixed again. Compared with the prior art, the method is advantaged in that the process is simple, the work amount of work is relatively small, and work efficiency can be improved; the original ballast bed structure is not damaged, and the original ballast bed stability is kept; external influence is small, an interval power supply meets construction conditions, and noise is low; the inclination of part of the supporting blocks i</description><subject>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</subject><subject>FIXED CONSTRUCTIONS</subject><subject>MACHINES FOR MAKING RAILWAYS OF ALL KINDS</subject><subject>PERMANENT WAY</subject><subject>PERMANENT-WAY TOOLS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2021</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNijEKwkAQRdNYiHqH8QAp1iBqKUGx0sbOIizJTzKw2VlmB89vBA9g9fjvv2XxeryhZeCJjUzhbUI0GpRjx3GgCTZKR70oqedArZ9f6SmPokY5AAn6FXOoQjIvbyyRAkesi0XvQ8bmx1WxvV6e9a1EkgY5-RYR1tR356qd2x8Pp3P1T_MBcfs7eg</recordid><startdate>20210806</startdate><enddate>20210806</enddate><creator>WU JUN</creator><creator>WANG LICHUAN</creator><creator>ZHANG LIUYONG</creator><creator>JIA CHUNLEI</creator><creator>HUO JIANHUA</creator><creator>WANG BAOFENG</creator><creator>ZHU WANRONG</creator><creator>XIA XUFENG</creator><creator>FAN BAOMING</creator><creator>XU MINGFA</creator><creator>HAN MEI</creator><creator>LAI LELE</creator><creator>WU FENG</creator><creator>YANG JIAN</creator><scope>EVB</scope></search><sort><creationdate>20210806</creationdate><title>Over-limit treatment grinding method for rail cant of short sleeper of metro operation line</title><author>WU JUN ; WANG LICHUAN ; ZHANG LIUYONG ; JIA CHUNLEI ; HUO JIANHUA ; WANG BAOFENG ; ZHU WANRONG ; XIA XUFENG ; FAN BAOMING ; XU MINGFA ; HAN MEI ; LAI LELE ; WU FENG ; YANG JIAN</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN113215879A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2021</creationdate><topic>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</topic><topic>FIXED CONSTRUCTIONS</topic><topic>MACHINES FOR MAKING RAILWAYS OF ALL KINDS</topic><topic>PERMANENT WAY</topic><topic>PERMANENT-WAY TOOLS</topic><toplevel>online_resources</toplevel><creatorcontrib>WU JUN</creatorcontrib><creatorcontrib>WANG LICHUAN</creatorcontrib><creatorcontrib>ZHANG LIUYONG</creatorcontrib><creatorcontrib>JIA CHUNLEI</creatorcontrib><creatorcontrib>HUO JIANHUA</creatorcontrib><creatorcontrib>WANG BAOFENG</creatorcontrib><creatorcontrib>ZHU WANRONG</creatorcontrib><creatorcontrib>XIA XUFENG</creatorcontrib><creatorcontrib>FAN BAOMING</creatorcontrib><creatorcontrib>XU MINGFA</creatorcontrib><creatorcontrib>HAN MEI</creatorcontrib><creatorcontrib>LAI LELE</creatorcontrib><creatorcontrib>WU FENG</creatorcontrib><creatorcontrib>YANG JIAN</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>WU JUN</au><au>WANG LICHUAN</au><au>ZHANG LIUYONG</au><au>JIA CHUNLEI</au><au>HUO JIANHUA</au><au>WANG BAOFENG</au><au>ZHU WANRONG</au><au>XIA XUFENG</au><au>FAN BAOMING</au><au>XU MINGFA</au><au>HAN MEI</au><au>LAI LELE</au><au>WU FENG</au><au>YANG JIAN</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Over-limit treatment grinding method for rail cant of short sleeper of metro operation line</title><date>2021-08-06</date><risdate>2021</risdate><abstract>The invention relates to the technical field of rail engineering and particularly relates to a metro operation line short sleeper rail cant over-limit treatment grinding method. The method comprises the following steps that S1, overrun measurement is conducted on short sleepers, and the short sleepers with the overrun range of 0-5mm as short sleepers are made to be ground; S2, for the to-be-polished short sleeper, after a fastener is detached and a steel rail is lifted, a polishing support is installed and polishing is conducted; and S3, after polishing is completed, the steel rail is fixed again. Compared with the prior art, the method is advantaged in that the process is simple, the work amount of work is relatively small, and work efficiency can be improved; the original ballast bed structure is not damaged, and the original ballast bed stability is kept; external influence is small, an interval power supply meets construction conditions, and noise is low; the inclination of part of the supporting blocks i</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN113215879A |
source | esp@cenet |
subjects | CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES FIXED CONSTRUCTIONS MACHINES FOR MAKING RAILWAYS OF ALL KINDS PERMANENT WAY PERMANENT-WAY TOOLS |
title | Over-limit treatment grinding method for rail cant of short sleeper of metro operation line |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-03T12%3A15%3A42IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=WU%20JUN&rft.date=2021-08-06&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN113215879A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |